E_Reeves
Established Member
Hi all,
Back when 88002 did it's first passenger run up and down the WCML, I was at Nuneaton station to see it. Whilst there a sand train (Middleton towers to Ince and Elton) was in platform 4. I was speaking to the driver and he said that he was still in platform 4 due to a points failure just north of the station. Looking on Open train times, I saw a mix of traffic backing up towards Atherstone, the class 88 included. One of the held up services was planned to go through platform 4 but couldn't do because of the sand train. I was expecting it to run behind the 88 through platform 3 (open train times was showing this as well) but I was surprised to see it go through the up relief line, which I though was OOU?
My question is that can this relief line be used any time for any traffic if any platforms are blocked as I have never seen anything run through there before?
Thanks
Back when 88002 did it's first passenger run up and down the WCML, I was at Nuneaton station to see it. Whilst there a sand train (Middleton towers to Ince and Elton) was in platform 4. I was speaking to the driver and he said that he was still in platform 4 due to a points failure just north of the station. Looking on Open train times, I saw a mix of traffic backing up towards Atherstone, the class 88 included. One of the held up services was planned to go through platform 4 but couldn't do because of the sand train. I was expecting it to run behind the 88 through platform 3 (open train times was showing this as well) but I was surprised to see it go through the up relief line, which I though was OOU?
My question is that can this relief line be used any time for any traffic if any platforms are blocked as I have never seen anything run through there before?
Thanks