• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Nuneaton Up Relief

Status
Not open for further replies.

E_Reeves

Established Member
Joined
25 Oct 2015
Messages
1,412
Location
West Midlands
Hi all,

Back when 88002 did it's first passenger run up and down the WCML, I was at Nuneaton station to see it. Whilst there a sand train (Middleton towers to Ince and Elton) was in platform 4. I was speaking to the driver and he said that he was still in platform 4 due to a points failure just north of the station. Looking on Open train times, I saw a mix of traffic backing up towards Atherstone, the class 88 included. One of the held up services was planned to go through platform 4 but couldn't do because of the sand train. I was expecting it to run behind the 88 through platform 3 (open train times was showing this as well) but I was surprised to see it go through the up relief line, which I though was OOU?

My question is that can this relief line be used any time for any traffic if any platforms are blocked as I have never seen anything run through there before?

Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

paulb1973

Member
Joined
10 Feb 2011
Messages
103
Location
Coventry
Hi all,

Back when 88002 did it's first passenger run up and down the WCML, I was at Nuneaton station to see it. Whilst there a sand train (Middleton towers to Ince and Elton) was in platform 4. I was speaking to the driver and he said that he was still in platform 4 due to a points failure just north of the station. Looking on Open train times, I saw a mix of traffic backing up towards Atherstone, the class 88 included. One of the held up services was planned to go through platform 4 but couldn't do because of the sand train. I was expecting it to run behind the 88 through platform 3 (open train times was showing this as well) but I was surprised to see it go through the up relief line, which I though was OOU?

My question is that can this relief line be used any time for any traffic if any platforms are blocked as I have never seen anything run through there before?

Thanks

I assume that is the track situated between Platforms 5 and 6. It was laid a few years back [if that's the one] and is not adjacent a platform. I had thought it was originally out of use - but was brought into use and is wired too.
 

E_Reeves

Established Member
Joined
25 Oct 2015
Messages
1,412
Location
West Midlands
Yes it is between 5 and 6. I made a mistake in the original post. The 88 went through platform 4 and the sand train was in 5.
 

Ships

Member
Joined
25 Apr 2013
Messages
338
Hi all,

Back when 88002 did it's first passenger run up and down the WCML, I was at Nuneaton station to see it. Whilst there a sand train (Middleton towers to Ince and Elton) was in platform 4. I was speaking to the driver and he said that he was still in platform 4 due to a points failure just north of the station. Looking on Open train times, I saw a mix of traffic backing up towards Atherstone, the class 88 included. One of the held up services was planned to go through platform 4 but couldn't do because of the sand train. I was expecting it to run behind the 88 through platform 3 (open train times was showing this as well) but I was surprised to see it go through the up relief line, which I though was OOU?

My question is that can this relief line be used any time for any traffic if any platforms are blocked as I have never seen anything run through there before?

Thanks

This isn't the western region! Less of your reliefs!
 

richieb1971

Established Member
Joined
28 Jan 2013
Messages
2,047
Someone told me that relief line was for a freight train path that required the engine to run around. I'm assuming that freight path never came to fruition?
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,438
Someone told me that relief line was for a freight train path that required the engine to run around. I'm assuming that freight path never came to fruition?
No, but it has occasionally been used for that purpose,
most recently during the period when there was an ongoing
points failure at Whitacre Junction causing all trains to use
the loop there which in turn led to the Mountsorrel to Northampton
stone train running round at Nuneaton on at least one occasion.


MARK
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,320
In those cases, does the loco run around through platform 5 and leave the wagons in the relief, or vice versa?
 

E_Reeves

Established Member
Joined
25 Oct 2015
Messages
1,412
Location
West Midlands
A freight shown to be in there at the moment
 

Attachments

  • Screenshot_20170717-130701.jpg
    Screenshot_20170717-130701.jpg
    56.2 KB · Views: 71
Status
Not open for further replies.

Top