In this document From Network Rail
https://www.networkrail.co.uk/wp-co...Fenton-to-Newcastle-Strategic-Advice-2020.pdf
they suggest that the only way to provide for all future service aspirations is to extend the slow lines through the station, with new platforms on the outside, and add a Hitchin like flyover/dive under to take the down Middlesbrough line over/under the Darlington line and round the top of Northallerton.
Seems reasonable, if a long way round and very expensive, but why do they suggest keeping the current freight route through the level crossings (which they state cause loads of local issues) to hold freight trains? Can’t they stack up on the slow lines south of Northallerton - I assume all passenger trains are on the fasts as they are 125mph apart from the Middlesbrough TPEs, which could be if paths were really that tight.
ps Moderators - feel free to move to Speculation if you see fit, wasn’t sure whether it is speculation when it is NR doing it!
https://www.networkrail.co.uk/wp-co...Fenton-to-Newcastle-Strategic-Advice-2020.pdf
they suggest that the only way to provide for all future service aspirations is to extend the slow lines through the station, with new platforms on the outside, and add a Hitchin like flyover/dive under to take the down Middlesbrough line over/under the Darlington line and round the top of Northallerton.
Seems reasonable, if a long way round and very expensive, but why do they suggest keeping the current freight route through the level crossings (which they state cause loads of local issues) to hold freight trains? Can’t they stack up on the slow lines south of Northallerton - I assume all passenger trains are on the fasts as they are 125mph apart from the Middlesbrough TPEs, which could be if paths were really that tight.
ps Moderators - feel free to move to Speculation if you see fit, wasn’t sure whether it is speculation when it is NR doing it!