The purpose of this thread is to ask members for creative ideas to keep passengers "on the rails" during the blockade of Nottingham station. Although the work is not planned until 2012/13, the opportunity to influence plans diminishes very quickly.
Extensive re-signalling is planned for the Nottingham station area to ease congestion and improve flexibility. The present plan is for a one month total blockade in summer 2013 and for East Midlands Parkway to become a "pseudo Nottingham"*. As I understand it the majority of the work is on the western approach (Mansfield junction to Nottingham station) however there is work to the eastern approaches so travel to Grantham will also be "blockaded".
(*that's how Tim Shoveller, MD of EMT thinks he'll be able to sell it)
I would like to say right away that I realise that rail/public budgets are under great pressure and that any cost increase might jeopardise the whole scheme. Better a total blockade for a month than no improvements. But it does seem unnecessarily simplistic, lazy even, for EMT, NR etc just to opt for a total blockade. Virgin adopted some ingenious ways of keeping their passengers on the rails during the WCML upgrade.
The plan to make East Midlands Parkway [EMD] into a pseudo Nottingham seems flawed:
1. To disconnect one of the Core Cities from the rail network for a whole month must have economic consequences - and in the summer for in-bound tourism, out-bound holiday-makers, and the high-value Nottingham/London business traveller.
2. EMD doesn't have the parking capacity for it to take on Nottingham users, and the A453 is very congested so travellers will have to allow significant time to make it from NOT to EMD.
Here are some ideas, barmy or otherwise.
1. The eastern approaches need less work so it might be possible to phase work to keep a reduced number of Nottingham/Grantham paths. These could be used for a shuttle to Grantham timed to meet East Coast services to/from KGX - this would assist the business traveller and also the international tourist trade. Additionally it might (and this is a big might) be possible to find paths on ECML to allow the Robin Hood to operate via Grantham during the one month blockade.
2. Netherfield station is much closer to Nottingham station than EMD and the road between them is much shorter and less congested than the route to EMD. It could be used per suggestion 2 above if it is not possible to keep the eastern side of Nottingham station open. I think that the track configuration between Netherfield and Nottingham might permit turnbacks.
A critique of the above ideas plus any other ideas would be welcome. Also any thoughts on the sort of perverse incentives that penalty payments, ORCATS, or others might produce that would make the TOCs prefer bussing.
Extensive re-signalling is planned for the Nottingham station area to ease congestion and improve flexibility. The present plan is for a one month total blockade in summer 2013 and for East Midlands Parkway to become a "pseudo Nottingham"*. As I understand it the majority of the work is on the western approach (Mansfield junction to Nottingham station) however there is work to the eastern approaches so travel to Grantham will also be "blockaded".
(*that's how Tim Shoveller, MD of EMT thinks he'll be able to sell it)
I would like to say right away that I realise that rail/public budgets are under great pressure and that any cost increase might jeopardise the whole scheme. Better a total blockade for a month than no improvements. But it does seem unnecessarily simplistic, lazy even, for EMT, NR etc just to opt for a total blockade. Virgin adopted some ingenious ways of keeping their passengers on the rails during the WCML upgrade.
The plan to make East Midlands Parkway [EMD] into a pseudo Nottingham seems flawed:
1. To disconnect one of the Core Cities from the rail network for a whole month must have economic consequences - and in the summer for in-bound tourism, out-bound holiday-makers, and the high-value Nottingham/London business traveller.
2. EMD doesn't have the parking capacity for it to take on Nottingham users, and the A453 is very congested so travellers will have to allow significant time to make it from NOT to EMD.
Here are some ideas, barmy or otherwise.
1. The eastern approaches need less work so it might be possible to phase work to keep a reduced number of Nottingham/Grantham paths. These could be used for a shuttle to Grantham timed to meet East Coast services to/from KGX - this would assist the business traveller and also the international tourist trade. Additionally it might (and this is a big might) be possible to find paths on ECML to allow the Robin Hood to operate via Grantham during the one month blockade.
2. Netherfield station is much closer to Nottingham station than EMD and the road between them is much shorter and less congested than the route to EMD. It could be used per suggestion 2 above if it is not possible to keep the eastern side of Nottingham station open. I think that the track configuration between Netherfield and Nottingham might permit turnbacks.
A critique of the above ideas plus any other ideas would be welcome. Also any thoughts on the sort of perverse incentives that penalty payments, ORCATS, or others might produce that would make the TOCs prefer bussing.
Last edited:
then perhaps I've got two more options: