• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Nottingham Station. Another platform?

Status
Not open for further replies.

class222lover

Member
Joined
29 Sep 2012
Messages
34
Location
Nottingham
Hello everyone.

I understand that in the summer of next year, Nottingham station will be having a big upgrade.

This will include a new concourse, new booking office, and a new destination board.

Strangly enough, i heard there will be an seventh platform. I'm not sure where this will be situated. Perhaps another terminal one like platform 2, except inbetween platforms 4 and 5. Or maybe knocking the wall opposite platform 1 and shortening the road just outside to one way and putting it there.

What are your views and thoughts?

Kind Regards, class222lover
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Wyvern

Established Member
Joined
27 Oct 2009
Messages
1,573
Apparently Platform 4 will be split in two to become four and five, the present five and six becoming six and seven.

The lines will not be bidirectional so the new 4 and 5 I guess will be up and down, that is it will no longer be a through patform :?:
 

brianthegiant

Member
Joined
12 May 2010
Messages
588
My understanding is that the current platform 6 will not be made an island platform, but that the clearances for that to happen do exist. The station remodelling design allows passive provision to add an additional track behind platform 6 at a later date.
 

class222lover

Member
Joined
29 Sep 2012
Messages
34
Location
Nottingham
Apparently Platform 4 will be split in two to become four and five, the present five and six becoming six and seven.

The lines will not be bidirectional so the new 4 and 5 I guess will be up and down, that is it will no longer be a through patform :?:

Platform 4 was never a through platform though, it had the Nott'm - Mansf'ld Woodhouse, Nott'm - London st pancras and the arrival of the b'ham new street - Nott'm.

Kind Regards, class222lover
 

Yew

Established Member
Joined
12 Mar 2011
Messages
7,236
Location
UK
Yes, a platform will be stepped out of four to the through line, this will make the current platform four (renumbered as 5) only accessable from the london end of the station, and the New stepped out platform (4) accessable from both ends, but probably only long enough for a 3/4 car MU

I imagine this will see more intensive use of the current 1,3 and 5 for the Longer Meridians and HST's, as I dont think the new platofrm 5 will be long enough (although maybe just, depending on how far up it is positioned
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Platform 4 was never a through platform though, it had the Nott'm - Mansf'ld Woodhouse, Nott'm - London st pancras and the arrival of the b'ham new street - Nott'm.
Platform 4 is most definitely a through platform, with plenty of movements to/from the east (although most are only shunts).

As stated above, the proposal is for the new platform to be formed by extending the eastern part of the existing platform 4 out to provide a new platform face adjacent to what's now "4 middle" road. I'd be surprised if either were long enough to accomodate an HST.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,326
Also the other through line willl be removed as far as I can divine from the artist's impressions of the new platform.
 

class222lover

Member
Joined
29 Sep 2012
Messages
34
Location
Nottingham
It seems I got confused of the term, 'through platform'.

I bet I've made myself look a fool. But at least I understand now.

Kind Regards, class222lover
 

bangor-toad

Member
Joined
20 Feb 2009
Messages
671
Hi there,
Changes are going to happen a bit sooner than next year.
On Sunday this week (7th Oct) the main booking office is closing and being relocated to allow the current setup to be redeveloped.

The Eastmidlands website has some info about what's happening: Link

Here's an article that has a graphic showing the future platform layout.

Cheers,
Jason
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
2,058
Location
East Midlands
Hi there,
Changes are going to happen a bit sooner than next year.
On Sunday this week (7th Oct) the main booking office is closing and being relocated to allow the current setup to be redeveloped.

The Eastmidlands website has some info about what's happening: Link

Here's an article that has a graphic showing the future platform layout.

Cheers,
Jason

Nottingham is getting far more than this. The NET (tram system) is undergoing a major extension which will include new routes to Chilwell and Beeston.

The works include extending from the existing Nottinham station (tram terminus) over the railway station. These proposals are not really made clear on the East Midlands website.

More info here:
http://www.thetram.net/phase-two/

I assume(!) that the detailed proposals include much better interchange rail/tram at Nottingham Station.
 

gordonthemoron

Established Member
Joined
4 Sep 2006
Messages
6,727
Location
Milton Keynes
well there's a new tram stop on the southern side of the station, over platform 6, between the passenger concourse & the multi storey car park
 

bangor-toad

Member
Joined
20 Feb 2009
Messages
671
The works include extending from the existing Nottinham station (tram terminus) over the railway station. These proposals are not really made clear on the East Midlands website.

Hi there,
The tram route is following the route of the old GCR and yes, it does go right over the railway station. I suspect the new bridge will be a bit more elegant than the original!
(It's quite interesting to see how much of the GCR route is re-used and where it deviates away...)

The Nottingham tram website does have some very detailed maps on it. The one of the station bridge is:
|Nottingham-station-to-arkwright-street.pdf

If you are interested, do look at the plans where the tram goes through the hospital grounds. It's going to be a spectacular elevated line between the buildings with a station perched above the road.

They are cracking on with the work - there's a lot of civil engineering going on as preparation work both at/near the station and along the rest of the new route.

Cheers,
Jason
 
Status
Not open for further replies.

Top