With all respects. We really do not know
Some of us know more than others.
With all respects. We really do not know
The report actually says that because Seghill and Seaton Deval are so close together (under a mile) only one station should be considered for reopening. I dont know the area but looking on the os map Seghill seems to be a very small village, wikipedia suggests the population is just under 3000. It seems likely that the only reason there was a station there prior to closing was the colliery which has long gone.Early on in the scheme, it was planned to build a station at Seghill, slightly further south of the original station. It got canned in an attempt to reduce the forecasted journey time form Ashington.
On the Northumberland line: Economic forecasting has been conducted, and nowadays the models are fairly accurate both for wider impacts and passenger demand for trains. Double track throughout at 60mph, with passive provision for Electrification and ETCS is very sensible given the likely demand for travel and the limitations already described upthread regarding budget and political process in the UK.
Consideration for two stations was done before the report was made (this has been a long time in the making). While point to point the stations are just over a mile apart, road and foot access is much longer as there are no roads/paths alongside the railway at that point, and the area is surrounded by greenbelt. NCC admitted that Seaton Delaval would be too far away for people to walk to it. The population will be tipped over 3000 now with additional house building, and one of the considerations for Seghill is that it would be within the cachmet for places like Holywell and Annitsford, which are not on the line.The report actually says that because Seghill and Seaton Deval are so close together (under a mile) only one station should be considered for reopening. I dont know the area but looking on the os map Seghill seems to be a very small village, wikipedia suggests the population is just under 3000. It seems likely that the only reason there was a station there prior to closing was the colliery which has long gone.
The speed of 50 mph I mentioned comes from planning documents, (which cannot be linked to), specifically referring to the passenger service. I think only the rail engineer magazine article, (link in post #173), mentions an aim for 60 mph.A question on the 60mph point, is that for Freight or Sprinters? I ask because usually Freight at 60mph means Passenger services can run at Higher speeds.
The speed of 50 mph I mentioned comes from planning documents, (which cannot be linked to), specifically referring to the passenger service. I think only the rail engineer magazine article, (link in post #173), mentions an aim for 60 mph.
It definitely isn’t double track throughout either, with 3 stations that are only single platform. I suspect that the various passing locations will be designed for a particular timetable and speed profile, there are a few extensions of double track to fit the service in and leave extant freight paths possible.
Yes, thats just the sort of document I’d read, but the link goes stale. I have the two screening opinion documents downloaded, but they’re too big to attach. There was one in 2019 and an updated version in 2020.Hopefully this works, Page 52 of this 270_Request for a screening opinion_ 260619 (northtyneside.gov.uk), mentions 50mph max with much of the line not able to handle it. But things change, I know a document in 2016 said 55mph max with a graph of the profiles
I'm hoping that one day we'll all manage to move on from considering different modes of public transport to be in competition with each other.I'm hoping the prices will be competitive to really tempt the commuters away from using the bus or driving, and also to keep them using the train.
I agree, but I don't think it will ever happen.I'm hoping that one day we'll all manage to move on from considering different modes of public transport to be in competition with each other.
All this talk of adding more costs. Already it seems there's a real chance that Bebside station is likely to be delayed, postponed or cancelled to save money.
![]()
Northumberland rail line is being cut before work has even begun
Planned Blyth Bebside station is likely to be axed as part of Department for Transport drive to cut costswww.chroniclelive.co.uk
New stations were planned at Ashington, Bedlington, Blyth Bebside, Newsham and Seaton Delaval. Trains will connect with the Metro at Northumberland Park, in North Tyneside.
But the Government has ordered a review of new rail projects, which it says is designed to cut costs and ensure they can be delivered sooner.
In a meeting with Treasury officials and Andrew Gilligan, Boris Johnson's transport adviser, officials from Northumberland County Council were told to find cost savings. Options included cutting passenger services from two trains per hour to one, or cutting a planned station.
The 2019 environmental scoping opinion was for a four phase construction, it showed postponement of sections of the doubling until later phases, however building the couple of stations you mention was in the second phase of the four. Then the summer 2020 version of the same document proudly announced that it was now merged into one single phase project; however DfT were yet to agree the timescales. (Suspicious in itself of course.)But wasn’t it always planned as an hourly service in phase one, with Bebside and Seaton Delaval always being planned as later additions? I never expected the ‘big bang’ reopening with half hourly services that was mooted in a short article and jumped upon was ever likely. Sounds like newspaper mischief making to me.
That doesn't make much sense to be honest. Holywell which isn't a huge place either is according to Google Maps closer to Seaton Delavel than Seghill and its only 0.2 miles further to Shiremoor metro station. Annitsford has a direct express bus link (X8 Max) to Newcastle scheduled for 23 mins. Its 3 miles from Cramlington or 1.7 from Seghill stations. I cant imagine that many people commute fron Annitsford to Ashington which is the only traffic that a station at Seghill would be useful for.Consideration for two stations was done before the report was made (this has been a long time in the making). While point to point the stations are just over a mile apart, road and foot access is much longer as there are no roads/paths alongside the railway at that point, and the area is surrounded by greenbelt. NCC admitted that Seaton Delaval would be too far away for people to walk to it. The population will be tipped over 3000 now with additional house building, and one of the considerations for Seghill is that it would be within the cachmet for places like Holywell and Annitsford, which are not on the line.
Unfortunately you need to tell the politicians - most new railway proposals are brought with MP or Cllr saying "the bus is rubbish we need a railway" then the railway opens and the bus gets cut because the paying passengers move to the quicker train. Said MP or Cllr then says "why is the bus service being cut?"I'm hoping that one day we'll all manage to move on from considering different modes of public transport to be in competition with each other.
WHY does all this 'guff' have to be produced? Is there a review anywhere of the benefits (and costs!) of the Transport & Works procedures?The Transport and Works Act Order has been updated today on Dft website
![]()
Northumberland Line: Transport and Works Act order
Approval to reintroduce passenger rail services to the existing railway line between Ashington in the County of Northumberland and Newcastle.www.gov.uk
The update
- 27 May 2021
Notice of application from Pinsent Masons to provide powers to re-introduce passenger rail services.Northumberland Line | Northumberland County Council
www.northumberland.gov.uk
This has links to various maps (24 sheets), Rights of Way (16 sheets) and various other documents
Because it's the law.WHY does all this 'guff' have to be produced? Is there a review anywhere of the benefits (and costs!) of the Transport & Works procedures?
Perhaps then Pinsent could refocus on rowing?
WHY does all this 'guff' have to be produced? Is there a review anywhere of the benefits (and costs!) of the Transport & Works procedures?
Perhaps then Pinsent could refocus on rowing?
Is it because this particular rail scheme will be connected to the national rail network?There's a good reason for consultation and legal process in a democracy. But I'd question why a local rail scheme has to go to Whitehall for the necessary powers when a road scheme that might have far more impact can be agreed at local level.
No, it’s just because over many years TWA order applications have been developed into the specialist way of applying for this level of railway improvements. London Underground have used TWA for schemes solely in their network such as Battersea extension and Bank station upgrade.Is it because this particular rail scheme will be connected to the national rail network?
That's the process the Portishead reopening is grinding it's way through currently, though how reinstatement of a 3 mile branch (which was still in situ albeit overgrown and obviously needing full reconstruction) counts as a project of national significance is completely beyond me.But I think it’s wrong in an earlier post to say that most roads are dealt with locally, many road applications go for something called a Development Consent Order from the Planning Inspectorate. (Nationally Significant Infrastructure Projects)
Laws can be reviewed, revised and rescinded. Regulations can be changed. I'm saying it's disproportionate.Because it's the law.
Of course I want to have my say and better still my way, but not at everyone else's expense. I don't suppose Pinsents are doing this for free, or pro bono as they may put it- maybe I'm wrong. We are paying for that. I don't imagine the costs of objectors willl be paid from public funds, nor do I suggest they should be. Surely 'the common good' should trump my view and that of other well-off self-serving objectors?Because if you want to use someone else’s land, they might want to have a say in it.
Or put another way, if someone wanted to build a railway across your garden, or a road, or a power station, or a wind farm, etc, would you just say ‘go on then’ ?
Of course I want to have my say and better still my way, but not at everyone else's expense.
I've not studied the obligations in relation to what are essentially proposals (say) to reinstate passenger services onto lines that are substantially there - albeit perhaps in a state of unuse in some cases (Portishead branch?)Laws can be reviewed, revised and rescinded. Regulations can be changed. I'm saying it's disproportionate.
Does the fact that passenger services used to run there and that the line still exists count for nothing?
I note in passing how the mere intensification of rail services through the Wolvercote tunnel to facilitate better Oxford-London connectivity took years to get approval. It's 'bats' if I might put it that way.
Of course I want to have my say and better still my way, but not at everyone else's expense. I don't suppose Pinsents are doing this for free, or pro bono as they may put it- maybe I'm wrong. We are paying for that. I don't imagine the costs of objectors willl be paid from public funds, nor do I suggest they should be. Surely 'the common good' should trump my view and that of other well-off self-serving objectors?
Again I ask how much is this process costing in time and money and to what beneficial effect?
This is from the explanatory memorandum on Northumberland council scheme page:“The application for the Order has been made by Northumberland County Council (“the Council”). The Order would confer powers on the Council for the closure of specified level crossings, the permanent and temporary stopping up and diversion of highways and streets, the acquisition of land compulsorily (including rights over land) and the temporary use of land, as well as to undertake certain ancillary works, all in connection with works to facilitate the re-introduction of passenger rail services between Ashington in the County of Northumberland and Newcastle upon Tyne (“the Project").”
“The majority of the works associated with the Project will be permitted either under separate planning permissions which are been sought from the relevant local planning authorities under Part 3 of the Town and Country Planning Act 1990, or by permitted development rights under the Town and Country Planning (General Permitted Development) (England) Order 2015).”