The September issue of Modern Railways says the hybrid 195 plan is under review, this is due to the high cost of procuring the units.
So, they want them to meet emissions targets, but they won't do simple electrification projects, and they drag their feet over paying for lower emission units?

I presume they are banking on pixie dust and genie wishes to get results?
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
To patly quote the September 2022 issue of Modern Railways "Northern’s Strategic development director Rob Warnes told Modern Railways that Northern remain in negations with CAF." (That not the whole quote but the whole quote is not needed)

I would say yes Northern are banking on pixie dust and genie wishes to get results as I can’t see CAF lowering the price they have asked for.

If there was more electrification projects these units may not be needed or may be cheeper.
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
So, they want them to meet emissions targets, but they won't do simple electrification projects, and they drag their feet over paying for lower emission units?

I presume they are banking on pixie dust and genie wishes to get results?
You do realise that Northern are not responsible for implementing electrification projects.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,375
Location
belfast
You do realise that Northern are not responsible for implementing electrification projects.
At the end of the day, the DfT is responsible for making decisions regarding electrification, and the DfT are also micromanaging northern.

Though why northern wouldn't take full bimodes, but order hybrids instead is something I don't get tbh. Presumably the hybrids they were looking at were Diesel-electric MUs plus a battery but without a pantograph, right? (if not please correct me). But at that point, why not make them a proper bimode so they can run electric on partially electrified routes?
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,881
But at that point, why not make them a proper bimode so they can run electric on partially electrified routes?
The justification was they were being ordered for a specific use that would mean they wouldn't work under OHLE. It's academic now though, because the plan is now dead in the water.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Though why northern wouldn't take full bimodes, but order hybrids instead is something I don't get tbh. Presumably the hybrids they were looking at were Diesel-electric MUs plus a battery but without a pantograph, right? (if not please correct me).
As described in a previous thread, the Northern 195 hybrids would have been diesel-mechanical not diesel-electric. Basically the existing drivetrain with a motor-alternator added to the diesel engine to make a parallel hybrid. No provision for OLE power.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,058
Location
Reston City Centre
At the end of the day, the DfT is responsible for making decisions regarding electrification, and the DfT are also micromanaging northern

^ this ^

We have a lot of threads where people talk about how “GWR want to eliminate their Sprinters” or “Chiltern want bi- modes” but all of it is meaningless, the Government control everything now (especially at Northern/ LNER, coincidently two of the three most struggling operators, along with First’s Avanti…)

If the Government want new trains for Northern then it’ll happen, if they don’t then it won’t, all of the commitments that Arriva signed up for (new services like Nottingham to Bradford, commitments to station staffing times, actually running trains to Brigg etc) are meaningless, history means nothing, accept that everything (infrastructure, new trains, service levels etc) is at the mercy of the Government

(I say “Government” because sometimes that means Westminster, sometimes that means Holyrood etc, before we get into semantics)
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,792
Location
The White Rose County
Wouldn't it be better than building hybrid units to do what GA have done but instead of a poxy traction carriage do it so that the power is still under the floor ?
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,375
Location
belfast
Wouldn't it be better than building hybrid units to do what GA have done but instead of a poxy traction carriage do it so that the power is still under the floor ?
What's wrong with the powerpack? it's a very flexible solution, and makes true level boarding easier.

If it was up to me Northern would order a fleet of 755/756-like trains to eliminate/strongly reduce diesel under the wires, replace sprinters (partially through moving 195s around) and improve the experience for passengers in the north.

though I can see the case that given the number of civities northern already has (class 195 and 331), a civity bimode similar to the 331 may be operationally easier
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,568
Location
"Marston Vale mafia"
What's wrong with the powerpack? it's a very flexible solution, and makes true level boarding easier.

Indeed. To me level boarding should be mandatory for all new orders, though one coach (the one with the wheelchair space) would be fine so you could do a 3-car set with the middle car low floor and the driving cars powered, like the converted Swiss "Domino" units.
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,792
Location
The White Rose County
What's wrong with the powerpack? it's a very flexible solution, and makes true level boarding easier.

Nothings wrong with it in the slightest!

Don't forget it makes trains longer, which if done up North will require platforms to be lengthened!

Also if new trains were 3 car then platforms will have to be lengthened by approximately two thirds of a carriage length.

Also on some lines this will prevent running four car trains as stations like knaresborough are only long enough for four car trains and can't be extended.

In short power packs above the floor arn't practical unless you want to eat into passenger capacity.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,375
Location
belfast
Nothings wrong with it in the slightest!

Don't forget it makes trains longer, which if done up North will require platforms to be lengthened!

Also if new trains were 3 car then platforms will have to be lengthened by approximately two thirds of a carriage length.

Also on some lines this will prevent running four car trains as stations like knaresborough are only long enough for four car trains and can't be extended.
the powerpack isn't that long, so if a slight platform overhang is possible then that should be able to fix it in most places.

Though you would probably want to go for 3 or 4 car units at least, and avoid the need for doubling up
 

InkyScrolls

On Moderation
Joined
20 Jul 2022
Messages
1,459
Location
North of England
Also on some lines this will prevent running four car trains as stations like Knaresborough are only long enough for four car trains and can't be extended.
To clarify for anyone who doesn't know the line, Knaresborough station is situated between a cliff and a tunnel; without completely resiting the station there's no way to extend the platforms.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,375
Location
belfast
To clarify for anyone who doesn't know the line, Knaresborough station is situated between a cliff and a tunnel; without completely resiting the station there's no way to extend the platforms.
Really! o_O that does sound like extending platforms won't work :D

Though for that station selective door opening might be a good shout then, if longer trains ever become necessary/desirable
 

InkyScrolls

On Moderation
Joined
20 Jul 2022
Messages
1,459
Location
North of England
Really! o_O that does sound like extending platforms won't work :D

Though for that station selective door opening might be a good shout then, if longer trains ever become necessary/desirable
SDO would be the ideal solution; the Harrogate line trains are currently limited to 3 carriage 170s for the above reason and they're frequently full and standing, even outside rush-hour. To be honest I'm surprised Northern hasn't introduced double 195s to the line, unless there's gauging issues I'm not aware of.

(Which would in theory free up the 170s for use on the Leeds - Settle - Carlisle line, if the promised linespeed improvements to 75 mph between Skipton and Carlisle ever become a reality!)
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
SDO would be the ideal solution; the Harrogate line trains are currently limited to 3 carriage 170s for the above reason and they're frequently full and standing, even outside rush-hour.
I wouldn’t say that the Harrogate line is frequently full and standing outside the peak. They are busy, sure like most routes around Leeds but frequently f&s is pushing it.
To be honest I'm surprised Northern hasn't introduced double 195s to the line, unless there's gauging issues I'm not aware of.
The 195’s are all spoken for.
(Which would in theory free up the 170s for use on the Leeds - Settle - Carlisle line, if the promised linespeed improvements to 75 mph between Skipton and Carlisle ever become a reality!)
If 170’s were ever taken off the Harrogate line (unlikely) they certainly won’t be straying onto the S&C.

They’ll most likely diagram 4 units onto the Hull - Halifax circuit as they’d be more suitable than the current 158’s diagrammed on those services and the other 2 would most likely replace the 2 Heaton diagrammed 158’s that work off Hull each day. Therefore no cost in any additional traction training (there are a hell of a lot of drivers and conductors at Carlisle & Skipton would need training) and they’d be working off their home depot of BG.
 

InkyScrolls

On Moderation
Joined
20 Jul 2022
Messages
1,459
Location
North of England
I wouldn’t say that the Harrogate line is frequently full and standing outside the peak. They are busy, sure like most routes around Leeds but frequently f&s is pushing it.

The 195’s are all spoken for.

If 170’s were ever taken off the Harrogate line (unlikely) they certainly won’t be straying onto the S&C.

They’ll most likely diagram 4 units onto the Hull - Halifax circuit as they’d be more suitable than the current 158’s diagrammed on those services and the other 2 would most likely replace the 2 Heaton diagrammed 158’s that work off Hull each day. Therefore no cost in any additional traction training (there are a hell of a lot of drivers and conductors at Carlisle & Skipton would need training) and they’d be working off their home depot of BG.
I bow to your superior knowledge - I don't work the Harrogate line but it always appears pretty full at Leeds.
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
I bow to your superior knowledge - I don't work the Harrogate line but it always appears pretty full at Leeds.
The student market between Leeds and Horsforth distorts perceptions. Still not f&s but beyond Horsforth trains are at a much more comfortable load. Since they went half hourly between Knaresborough and York last year passenger loads are far more even at the other end too.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
Indeed. To me level boarding should be mandatory for all new orders, though one coach (the one with the wheelchair space) would be fine so you could do a 3-car set with the middle car low floor and the driving cars powered, like the converted Swiss "Domino" units.
I agree that level boarding for be mandatory for all new orders, it’s a shame the 195s and 331s were not built with level boarding.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,496
Location
Over The Hill
It's just as well that this thread is in the Speculative Discussion part of the forum because there's been an awful lot of comment based on nothing more than second-hand reporting of an internal industry aspiration specific to one operator. The reality is that any acquisition of new rolling stock is utterly dependent on the willingness of government to either finance it directly or underwrite whatever deals are made with outside financiers and leasing companies.

Given the parlous state of the economy and the uncertainty around future levels of passenger demand I would fully expect government, certainly in England, to put off any decisions on new rolling stock for as long as possible. It's looking increasingly as if the current Truss administration has little appetite for meeting previously agreed environmental targets unless "someone else" can find a way to do so, preferably while making a tax-generating profit. As for replacing the Sprinter fleet as long as we continue to elect right-wing governments it would not surprise me if an element of fleet replacement will actually be achieved by non-replacement ie with significant cuts in service levels and perhaps even line closures.

It's all very well talking about ideals such as improved accessibility and avoiding the use of diesel traction as much as possible but I don't think that politicians actually care very much about such things. Perhaps what we need is a trainspotting version of Greta Thunberg!
 

Philip

On Moderation
Joined
27 May 2007
Messages
3,734
Location
Manchester
It's just as well that this thread is in the Speculative Discussion part of the forum because there's been an awful lot of comment based on nothing more than second-hand reporting of an internal industry aspiration specific to one operator. The reality is that any acquisition of new rolling stock is utterly dependent on the willingness of government to either finance it directly or underwrite whatever deals are made with outside financiers and leasing companies.

Given the parlous state of the economy and the uncertainty around future levels of passenger demand I would fully expect government, certainly in England, to put off any decisions on new rolling stock for as long as possible. It's looking increasingly as if the current Truss administration has little appetite for meeting previously agreed environmental targets unless "someone else" can find a way to do so, preferably while making a tax-generating profit. As for replacing the Sprinter fleet as long as we continue to elect right-wing governments it would not surprise me if an element of fleet replacement will actually be achieved by non-replacement ie with significant cuts in service levels and perhaps even line closures.

It's all very well talking about ideals such as improved accessibility and avoiding the use of diesel traction as much as possible but I don't think that politicians actually care very much about such things. Perhaps what we need is a trainspotting version of Greta Thunberg!

And this is why it makes sense for Northern to grab any modern stock which is available (or soon to be) to help with their plan to replace the 15x fleet.
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,792
Location
The White Rose County
the powerpack isn't that long, so if a slight platform overhang is possible then that should be able to fix it in most places.

Though you would probably want to go for 3 or 4 car units at least, and avoid the need for doubling up

The trouble there are or at least they're were plans to double up services to 6 car lengths upon both sides of the Pennines. Personally I think we these should be made up of 4 and 2 car units rather than 3 car units.

To clarify for anyone who doesn't know the line, Knaresborough station is situated between a cliff and a tunnel; without completely resiting the station there's no way to extend the platforms.

Thanks for that!

Though for that station selective door opening might be a good shout then, if longer trains ever become necessary/desirable

before the cliffe there is a level crossing at the West end of the platform Im not sure what rules and regs are but I can't see trains being allowed to sit on level crossings!

Aside from Knaresborough a lot of platforms were lengthened not so long ago such as the Calder Valley line to facilitate 6 car trains, thats obviously with SDO as these extensions only made the platforms long enough for 5 car trains. I can't see it being possible without having to extend large numbers of platforms.
 