• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Northern Unit Refurbishments and depot allocations.

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,177
Location
West Yorkshire / Birmingham
Does anyone know how the modifications to the internal door controls in the Class 333 toilets are coming along, if they are? The door on 333003 seems to be misbehaving, i.e. when you press the door close button it suddenly reopens when it finishes closing instead of locking, which meant I had to hold the door shut until it locked. Certainly having a separate door lock button would clear any doubt if this happened and would prevent people locking the toilet out when leaving it and closing the door from the inside.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,901
Does anyone know how the modifications to the internal door controls in the Class 333 toilets are coming along, if they are?
On hold as part of a proposed wider package of mods.
The door on 333003 seems to be misbehaving, i.e. when you press the door close button it suddenly reopens when it finishes closing instead of locking, which meant I had to hold the door shut until it locked.
The mechanism has gone a bit out of calibration so is detecting an obstacle where there isn't one. 195/331s do a similar thing. It just needs the door setting up again but depends if anyone has noticed it or bothered reporting it.

____________________

Auto merge Sunday 16/02:
158755 has escaped from Neville Hill up to Brodies today. First trip on the mainline for quite a long time.
 
Last edited:

150275mylords

Member
Joined
23 Oct 2024
Messages
8
Location
Garforth
On hold as part of a proposed wider package of mods.

The mechanism has gone a bit out of calibration so is detecting an obstacle where there isn't one. 195/331s do a similar thing. It just needs the door setting up again but depends if anyone has noticed it or bothered reporting it.

____________________

Auto merge Sunday 16/02:
158755 has escaped from Neville Hill up to Brodies today. First trip on the mainline for quite a long time.
158755 was in passenger service on the 14th and 15th
 

sbrignall72

Member
Joined
3 Jun 2020
Messages
773
Location
Brough
One for diligentdave any dates for when 150109, 150114,150218 will return from Wolverton and Brodies. MTIA

== Doublepost prevention - post automatically merged: ==

Just noted there is a 5N31 is for Saturday from Wolverton to Newton Heath and a 5H71 return. So one coming back this Saturday by the looks of it.
 

diligentdave

Member
Joined
20 Oct 2007
Messages
444
One for diligentdave any dates for when 150109, 150114,150218 will return from Wolverton and Brodies. MTIA

== Doublepost prevention - post automatically merged: ==

Just noted there is a 5N31 is for Saturday from Wolverton to Newton Heath and a 5H71 return. So one coming back this Saturday by the looks of it.
150114 is due out of Wolverton next week (27th or the 28th). It's not ready for the 5N31 move on Saturday.

150218 is expected to be released in March (just before it's 1st birthday in Kilmarnock). Judging by how far they have got with the final rebuild when I was there last week I would say that's optimistic.

== Doublepost prevention - post automatically merged: ==

Anyone know what’s happened to 323237?
Still being used as a training unit at Wigan.
 

3973EXL

Established Member
Joined
2 Feb 2017
Messages
2,741
150114

5H71 dep 1120
 
Last edited:

Adam0984

Established Member
Joined
18 Feb 2014
Messages
1,213
The CAF trains have more new voices, counted 3 on my 331, one for the next stop is Leeds, another Scottish sounding voice for keep your luggage with you and a 3rd voice apologising for the delay, all automated
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,901
The CAF trains have more new voices, counted 3 on my 331, one for the next stop is Leeds, another Scottish sounding voice for keep your luggage with you and a 3rd voice apologising for the delay, all automated
Was wondering when someone would mention this :D
 

FrodshamJnct

Established Member
Joined
14 Apr 2019
Messages
4,427
Location
Cheshire
The CAF trains have more new voices, counted 3 on my 331, one for the next stop is Leeds, another Scottish sounding voice for keep your luggage with you and a 3rd voice apologising for the delay, all automated

Yes just noticed the same on a 195 from Chester to Leeds.
 

Adam Evans

Member
Joined
16 Oct 2018
Messages
57
Location
Liverpool and Manchester
The CAF trains have more new voices, counted 3 on my 331, one for the next stop is Leeds, another Scottish sounding voice for keep your luggage with you and a 3rd voice apologising for the delay, all automated
Yeah I've heard a myriad of new voices travelling from Manchester to Liverpool yesterday evening. It just feels like a right mess. I'm half-tempted to send over samples of my own voice announcements just to further add to confusion as it feels a little bit like a free for all now.
 

Adam0984

Established Member
Joined
18 Feb 2014
Messages
1,213
Yeah I've heard a myriad of new voices travelling from Manchester to Liverpool yesterday evening. It just feels like a right mess. I'm half-tempted to send over samples of my own voice announcements just to further add to confusion as it feels a little bit like a free for all now.
Every station in a different voice and accent
 

reecestrains

Member
Joined
22 Aug 2023
Messages
384
Location
Leeds, West Yorkshire
DB ESG has announced that they have won the contract for the turnkey materials supply and installation of the upgrades to the Passenger Information Screens and Energy Metering on Northern Class 333s.

16 Class 333 EMUs will be upgraded at Northern’s Skipton Sidings Facility.

Each unit will be completed in three days, thanks to DB’s experience.

It is expected the work will be finished by June 2025.

== Doublepost prevention - post automatically merged: ==

This upgrade has been a long time in the coming.
 
Last edited:

JordR

Member
Joined
31 Aug 2014
Messages
234
Location
Leeds
What's "energy metering" in this context?

This is likely an end to "Welcome to the Skipton train!" and the introduction of much more waffle that the current system isn't capable of saying, e.g. don't forget your head, rain is wet etc?
 

Harvey B

Established Member
Joined
11 Mar 2019
Messages
1,241


== Doublepost prevention - post automatically merged: ==

This upgrade has been a long time in the coming.
Any idea about when this work is expected to start?

Will the new PIS be Train fx, or will it be a completley different system?

== Doublepost prevention - post automatically merged: ==

What's "energy metering" in this context?

This is likely an end to "Welcome to the Skipton train!" and the introduction of much more waffle that the current system isn't capable of saying, e.g. don't forget your head, rain is wet etc?
sadly :(. I hope i can get one to Doncaster before the old announcements go
 

reecestrains

Member
Joined
22 Aug 2023
Messages
384
Location
Leeds, West Yorkshire
Any idea about when this work is expected to start?
Very soon I would think.
Will the new PIS be Train fx, or will it be a completley different system?
Knowing Northern's habits of PIS, probably TrainFX. But we'll see when it happens.
sadly :(. I hope i can get one to Doncaster before the old announcements go
I'm sure there'll still be some units that'll have them as it's end of June they'll all be done.

I'll be fully determined to ride one to Doncaster before the older announcements are gone.
 

Adam0984

Established Member
Joined
18 Feb 2014
Messages
1,213
I very much doubt that all 16 will be done in 2 months, that's 2 a week. As soon as they're diagrammed on the Doncaster line get them ticked off as it'll get harder as more units are converted
 

reecestrains

Member
Joined
22 Aug 2023
Messages
384
Location
Leeds, West Yorkshire
I very much doubt that all 16 will be done in 2 months, that's 2 a week. As soon as they're diagrammed on the Doncaster line get them ticked off as it'll get harder as more units are converted
Absolutely, I will be monitoring very closely and when an opportunity comes up, I'm going for it no matter what it takes.

I won't be letting this slide.
 

Top