- Interesting that the north west is getting a premium brand of higher spec provision for some of its routes, whilst theres no apparent focus on longer distance routes between cities like Leeds Nottingham or Sheffield Hull.
- If the Northern franchise is capable of running longer distance/faster routes like Barrow Manchester Airport (which doesnt fit neatly into the new TPE map and will require premium trains) then I dont know why Cleethorpes Manchester Airport remains on the TPE map? If the whole idea of a TPE is because Northern dont (cant?) operate longer distance/faster routes therefore creating a separate franchise to provide that level of service then retaining two franchises, whilst giving Northern a two tier operation of their own seems confusing.
- Giving the Barton on Humber service to EMT is fair enough (operationally separate from Northerns other routes, theres a single 153 on a fairly busy Doncaster Sheffield service arriving in Sheffield around 09:25 to accommodate the need to switch Barton units)...
- ...however, nobody has suggested giving the slow Sheffield Worksop service to EMT this could have been a good route to hand to them to allow through trains from Mansfield to Sheffield (i.e. run it onto the Robin Hood services).
- Maybe the slow Worksop service will be the one to run through to Meadowhall/ Rotherham (if theres still a requirement to give the south Rotherham stations of Kiveton Park/ Bridge etc a through service) which may mean that the Sheffield - Lincoln trains are upgraded to something more suitable than the current 142s on the Scunthorpe Lincoln Adwick tour. If the service becomes first stop Worksop then thats going to be more suitable for something like a 156.
- Thinking about Barrow moving to Northern, thats going to mean that Cleethorpes will be the only diesel service operated in the Transpennine service (based on rumours/ assumptions/ hints about Scarborough/ Middlesbrough losing their Manchester services), which makes TPE South even more of a runt than it currently is.
Alderley Edge-P
iccadilly services are timed for 75mph DMUs. In the event of a 323 shortage in the evening peak a Buxton service is quite often 2 carriages instead of 4 due to a 150 being taken for an Alderley Edge-Piccadilly working
Obviously, given theres only one class of EMU west side, if there are no fit 323s then Northern will have to use a 75mph DMU, but the services arent all timed for 75mph DMUs (just looking at those around now e.g.
http://www.realtimetrains.co.uk/train/Y51289/2015/03/03/advanced - there may be some timed for a 75mph DMU at other times of the day, but then the same is surely true of the Stoke line with its scheduled 2x142 service?).
Use of OHEs really needs to be a compromise between effectively using them and meeting demand. It wouldn't be sensible to, for instance, terminate South TPE at Hazel Grove with a connecting EMU for Stockport/Piccadilly and the Airport
Nobody is talking about cutting Sheffield services back to Hazel Grove though thats a fairly extreme example to use!
However, increasing the number of DMUs on a route that will be mainly electrified like Barrow Lancaster Preston Bolton Manchester - Manchester Airport seems a poor use of scarce DMUs (especially if we think that a hundred and twenty carriages will be able to replace roughly the same number of Pacers).
Doubling the frequency of fast DMUs from Manchester Victoria to Liverpool seems to undo some of the case for electrifying that line at considerable expense.
I'm not sure if they will terminate in Manchester or whether they'll continue beyond. There isn't a requirement for them to continue beyond Manchester but it might making pathing easier for one or more to continue towards Northwich/New Mills Newtown
I take your point, but given the need to maintain existing services from Liverpool/ Southport/ Blackpool/ Glasgow/ Edinburgh etc to Manchester Airport plus additional Airport journeys (beefing up the Barrow services, any Llandudno service that may or may not happen), maintaining the existing Liverpool Norwich service *and* the need for an increased frequency from Bolton to Stockport (plus any token VTWC service to Bolton?), Id be surprised if there were many paths through 13/14(15/16) at Piccadilly for services that dont meet these criteria.
Leeds - Sheffield, you already have a stopper and InterCity service on the route via Wakefield Westgate, plus a stopper and two fast trains on the Hallam route
Always interesting to read things from your perspective...
First of all, the hourly XC service has been described (by Arriva themselves) as the busiest section on the XC network (this was in their submission for permission to route more via Doncaster services via Leeds instead), if that gives anyone from outside the area an idea of how busy the route between the two cities is even in terms of horribly packed Voyager, the service from Sheffield to Leeds is at the busy end of that scale!
Secondly, I note that you describe the half hourly 158 operated service between the cities as fast. Fast? A service that takes an hour to cover forty miles? Maybe if you are used to sedate branches it seems speedy, but it shows how neglected the route between Yorkshires two biggest cities is if a service with an average speed of 40mph can be described as fast!
It seems to me that the corridoor would be better improved by having later/earlier services and stopping more trains at some smaller stops than a massive increase in rolling stock provision
Thirdly, your solution to this is
to slow services down further so they can stop it at *more* intermediate places? Like Normanton, presumably?
Sadly a route between the large cities of Sheffield and Leeds doesnt seem to be on the agenda for improvements despite the resources being found for Barrow, Bentham, Bishop Auckland and Bridlington.
Do we really have to wait until HS2 and HS3 before we get a fast service between the cities in northern England? Is the conventional network really not capable, too clogged up with stoppers?
it provides, in the event of a tough financial settlement for DfT, the necessary grounds to get out of the commitment even if that means scrapping the ITT and starting again...
Interesting comments.
The idea that this £250m to replace Pacers is a pre-election sweetener (and that well find out after the election that theres no money so well have to go back to the drawing board) is one that Im increasingly wondering about!
I dont believe that the pendulum has swung from McNultys rationalisations to being able to afford this largesse all of a sudden! Expect it to swing back after the election is out of the way? After all, the economy is barely off life support, the public finances are in a terrible state, there are going to be some savage cuts during the next parliament.
As I pointed out in post #115, the Consultation Response document states that:
https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/407939/northern-and-tpe-stakeholder-briefing-document-and-consultation-response.pdf
This implies that it is simply the diversion of the Liverpool to Scarborough service to run via Victoria that frees up Piccadilly capacity for the three new Stockport services, not the Ordsall Chord as such
Interesting, cheers.
I
saw someone claim that the changes to the Scarborough Liverpool service would be enough for the extra three trains an hour into Piccadilly, but I found that hard to believe (one service an hour clogging up so many paths for other routes, there being sufficient spare paths over the Stockport viaduct for an extra three services an hour that cant run due to a conflict at Piccadilly), so made the assumption that the lack of reversals on the Guide Bridge- Airport corridor must also be responsible for the big jump in capacity.
If it is the case that amending one service an hour (from Guide Bridge to Oxford Road) can free up these three extra Cheshire trains then Im amazed its not been done years ago. You could have run the semi fast Calder Valley service through to Merseyside if the need for Liverpool to have a through train to Leeds was that important (extend the Buxton DMU through to Liverpool to replace the TPE service via Warrington Central).
The consultation response talks about Northern Express services being of higher quality than current stock (either new or refurbished).
The services earmarked for Express branding appear to start with Barrow-Manchester Airport (diesel) and Blackpool-Manchester Airport (electric).
That seems to mean new stock for Barrow (replacing sub-leased 185s), and an upgrade of 319s for Blackpool (at least the Airport services).
I don't see 1st class mentioned but I would suppose the new Northern would want to introduce 1st class on these services.
Anyway, there seems to be a basis for 2 types of 319 configuration - commuter and express.
But other "Express" services are not identified.
You might have thought Newcastle-Carlisle might be one, or Leeds-Carlisle, or the new Chester-Victoria-Leeds.
Liverpool-Man Airport confuses me. There appear to be 2 services, one via Newton le Willows and one via Warrington Central.
Doesn't seem right.
The electrification agenda is badly thought through.
How do you get to the 90% electric on the Chat Moss route when at least 3 services are diesel (2xTPE, 1xATW and 1xNorthern Chester-Leeds).
Barrow, Blackburn and Southport services will all be diesel on the Bolton route.
What do TPE do about new stock?
At first sight they are not obliged to acquire any more stock, but if they do so before TP North is wired they will have to get rid of it soon after.
Is that a prompt to buy IEPs (which could be used on Scottish services too)?
What is the point of the Class 442 references?
I shouldn't think a Class 68 plus 5-car 442 would perform like the 185 fleet.
There is nothing in the ITT set which says "all 319s to Northern, TP buys new electrics".
There are too many 319s, and TP does not need new electrics for possibly 5-6 years - far too long to get a meaningful quote from manufacturers.
Or have I missed something?
I think thats a fair reading of the situation, based on the only seeing part of the picture (which is all we currently know). On some lines we may see more DMUs *after electrification* than there were before electrification...
On one hand, well be swimming in 185s once gaps in the TPE line from Liverpool to Newcastle are finished, and 185s ought to be good enough for routes like Barrow Manchester Airport, yet the new Northern franchise needs to get brand new higher spec DMUs for such routes in the short term (and will presumably get their hands on most of the 185s fleet in the longer term).