Maybe they can't stand high humidity?
Probably explains why the 16:16 LIV to MIA service today has been cancelled.
Maybe they can't stand high humidity?
Probably explains why the 16:16 LIV to MIA service today has been cancelled.
According to information I received that was cancelled because of "the failure of 142001 and 142039"
Would any fleet of new rolling stock normally be expected to have have a similar percentage failure rate?
Usually yes. For example, the 350/4s which were notoriously unreliable at the start. I suspect a number of failures at the moment are to do with unfamiliarity with the stock by the fitters and drivers.
Is the total number of failures which are directly as a result of problems with the cascaded Class 319 units now with Northern Rail as a percentage of the actual units of that class that have been running in service with Northern Rail any different percentage-wise to the Class 319 units that run in other areas?
Would any fleet of new rolling stock normally be expected to have have a similar percentage failure rate?
Given that Northern chose the specific 319/3s to be delivered, it can only be something in the maintenance/service practices that hasn't yet bedded in.
By contrast, Merseyrail has it just about right - destination, next stop, silence, with extra safety information as you enter the city tunnels.
319366 is at Preston. 319379 is at Stockport.
Was it actually Northern who chose them or DfT? I heard the ones that wouldn't need C6 exams before early 2016 were chosen to keep costs down.
In contrast apparently the opposite is happening with the TPE 170s. Chiltern are taking the ones due exams first and the units are receiving the exams before entering service.
As I understood it a couple of Northern personnel got to tour the depot for a week and pick out those they thought were in the best condition.
When did 319366 last move?
I travelled on a 319 from Blackfriars - Bedford yesterday. They really are poor compared to the 377s on the same route which will be replaced by state of the art 800s soon. Grossly unfair really.
That's not a useful comparision as the 319s are 23-26 years old compared to the Electrostars that are between 6 and 10 years old. The 377s are temporary anyway and will be elsewhere in three years when the 700s arrive, 800s would be useless as they are out of gauge for the core, won't run on DC, don't have ATO and couldn't handle the passenger levels.
You might as well complain that the 150s aren't as good as the 172s.
379 is still in FCC guise and is a demic.319366 at Preston does regular training runs to Carnforth.
319379 at Stockport appears to do static training only.
Electrostars on Thameslink are between 0 and 12 years old. The 387s are between seven and zero months old where as the 377 fleet was built in two batches, 377/2 between 2002-2003 and 377/5 between 2008-2010. Electrostars on Thameslink are between 0 and 12....
.... But I do believe that the poster meant the 700s not 800s.

Tony Miles has confirmed in July Modern Railways that the Liverpool-Blackpool DMU service will be split at Preston from October (after the special Farnworth timetable finishes).
This will allow 319s to work most Liverpool SP/Lime St-Preston services.
319s will also work Liverpool-Warrington BQ services.
Tony Miles has confirmed in July Modern Railways that the Liverpool-Blackpool DMU service will be split at Preston from October (after the special Farnworth timetable finishes).
This will allow 319s to work most Liverpool SP/Lime St-Preston services.
319s will also work Liverpool-Warrington BQ services.
Will that require even more than the current 20 'ish 319s?
At least it will release Sprinters and Pacers for reinforcement of existing DMU services.