I'm sure passengers using the Ormskirk-Preston service would love to get a half-hourly to Liverpool but I'm not sure they'd be excited about the prospect of the existing Ormskirk-Preston service being operated by a 319.
Whyever not? You really don't like 319s, do you?
They are basically a 4-car electric Class 150/2, the use of which is not completely unknown on the line, and are comparable with the Merseyrail units with which they connect.
I'd rather have a 319 than a cramped, unreliable 153. Sure 153s have 2+2 seating but the pitch is inhuman.
And before you mention the South getting everything, LM are also getting some 319s. I have no particular problem with this, they are suited perfectly well to WCML local services.
Neil
--- old post above --- --- new post below ---
Whyever not? If those lines were electrified then we might actually start seeing direct services through Ormskirk and Kirkby, with 319s switching from overheard to 3rd rail at both stations. It's an absolute joke that passengers have to change at either of them at all.
ISTR that 20m Mk3-based EMUs don't fit in the Merseyrail tunnels, so this without infrastructure work is not on the agenda.
313s would fit, but it's most likely to be new stock that ends up doing this.
Neil
--- old post above --- --- new post below ---
So are you saying passengers would be excited by having a 319 running a Ormskirk-Preston shuttle or that they wouldn't be excited by the prospect of having a Liverpool-Ormskirk-Preston service?
I think they would be completely neutral to the idea of a 319 substituting for the 153, or maybe happy because the massive extra capacity would increase the chance of not having to sit next to someone.
I think they would like a through service, though as noted in my other post I don't believe this could be operated using 319s as they won't fit the Merseyrail tunnels.
I also think anyone expecting huge growth as a result of electrification will be very disappointed. In the past routes with potential for huge growth have been chosen for electrification projects. This time Northern and TPE routes which have already seen exponential growth over recent years are being electrified. That level of growth can't possibly continue post-electrification unless we see huge growth in population.
I don't know, have you seen the motorways of the North West in the rush hour?
Neil