Anyone got any idea how the refresh of the 319s is going at Wolverton, and when a refreshed example might emerge?
First one is due out at any moment. Will try and get an update tomorrow.
Northern's or GTR's? There's a STP 5M81 Wolverton C S to Bedford tomorrow morning, but is only a Q path.
I don't think 1 toilet on a 4 car unit in the North would work. With a lack of station toilets and some rural stations the on board toilets get very well used on some services. It'll probably be one accessible toilet and one non-accessible one.
--- old post above --- --- new post below ---
No but the idea is the 319s are supposed to provide much needed extra capacity to the North. With LM they got accessible 23.8m class 172 carriages to replace non-accessible 20m class 150 carriages.
On the capacity issues, 1 toilet per 4 car would presumably be enough for the Liverpool/Manchester commuter routes they're going to be on. Probably not for Settle-Carlisle, but I don't expect that will be wired soon. Don't think there are many 4 car diagrams on the initial routes, but there are also some pacers floating about so 4*20m will be a step up anyway. Would be useful if Platforms were planned to allow 8*20m for Liverpool to Manchester Airport and Liverpool to Blackpool as these are semi fast services not stopping at every village.
I don't think 1 toilet on a 4 car unit in the North would work. With a lack of station toilets and some rural stations the on board toilets get very well used on some services. It'll probably be one accessible toilet and one non-accessible one.
Interesting thought. The 319s were built with two small toilets opposite each other in the TSO. According to the Porterbrook brochure 319/3 has the same vehicle rebuilt with one standard and one "partially compliant" wheelchair toilet, and the others all retain the original arrangement. So perhaps the 319/3 arrangement will be used if this can be modified for full compliance.
The TSO is also the vehicle that would be removed if they were reduced to 3-car, so any shortened units would need a toilet installing in another vehicle (probably one of the driving trailers) or would end up without.
Won't they use the same arrangement as the 320s have received? The removal of one of the two toilets opposite each other and fitment of the new compliant toilet in another coach. This is IMO a better arrangement because a) if two toilets are deemed necessary, having them right next to each other isn't that sensible and b) it means a sensible use of space, one compliant toilet and the other one space saving.
To be honest, I think that with these 319s as the 320s they could have gotten away with simply removing the two small toilets and providing just one modern compliant toilet. The 333s have this, and I think it's sufficient and provides the right trade-off between space for more seats and toilet capacity on most routes. A second space saving toilet is a nice luxury.
Won't they use the same arrangement as the 320s have received? The removal of one of the two toilets opposite each other and fitment of the new compliant toilet in another coach. This is IMO a better arrangement because a) if two toilets are deemed necessary, having them right next to each other isn't that sensible and b) it means a sensible use of space, one compliant toilet and the other one space saving.
To be honest, I think that with these 319s as the 320s they could have gotten away with simply removing the two small toilets and providing just one modern compliant toilet. The 333s have this, and I think it's sufficient and provides the right trade-off between space for more seats and toilet capacity on most routes. A second space saving toilet is a nice luxury.
To be honest, I think that with these 319s as the 320s they could have gotten away with simply removing the two small toilets and providing just one modern compliant toilet. The 333s have this, and I think it's sufficient and provides the right trade-off between space for more seats and toilet capacity on most routes. A second space saving toilet is a nice luxury.
Clearly a 319 will add extra capacity if the DMUs are kept as more 2 car DMU workings may be able to become four car DMU workings
I got on a 6 car 185 from Lancaster(12:27) to the airport on the 12th october and it had to be terminated at oxford rd as the toilets in the first 3 cars weren't working and all had to be transferred onto an 8 car 350 that was waiting for us, it nearly made miss our connection to york but did feel sorry for the folk as it was probably a long journey from scotland without toilets,surprised TPE didnt supply nappies or bottles,lol.
That's what's happening with the 319s. Toilets ripped put and single accessible loo put in. Doubt there is any space gained tho.
I used 319215 and that is what was done in that. However it seemed to take up more space
Won't they use the same arrangement as the 320s have received? The removal of one of the two toilets opposite each other and fitment of the new compliant toilet in another coach....
To be honest, I think that with these 319s as the 320s they could have gotten away with simply removing the two small toilets and providing just one modern compliant toilet.....
Interesting thought. The 319s were built with two small toilets opposite each other in the TSO. According to the Porterbrook brochure 319/3 has the same vehicle rebuilt with one standard and one "partially compliant" wheelchair toilet, and the others all retain the original arrangement. So perhaps the 319/3 arrangement will be used if this can be modified for full compliance.
The TSO is also the vehicle that would be removed if they were reduced to 3-car, so any shortened units would need a toilet installing in another vehicle (probably one of the driving trailers) or would end up without.
I would have thought that reducing the 319s to three car would be madness considering many trains on the routes that they planned to operate are four car in the peaks now.
What's generally the maximum train length (number of coaches) that the platforms can accommodate on the routes that the 319s are due to be used on?
What's generally the maximum train length (number of coaches) that the platforms can accommodate on the routes that the 319s are due to be used on?
Key problem places are Salford Cen/Cres, Newton le Willows, St Helens Jn, Horwich and the Blackpool line stations.
Most of the rest are 4/5-car with only 3-car at Salwick.
There is a platform extension plan for some stations but only to 6x23m.
The practical limit is 8x20m coaches because that's all that will fit into Manchester Oxford Road.
Other places on NW new electric routes with 8 or more include:
Manchester Pic/Vic/Airport, Eccles, Patricroft, Edge Hill, Liverpool Lime St,
St Helens Central, Wigan NW, Clifton, Bolton, Lostock, Preston, Blackpool North, Stalybridge.
Some others can accept 8 cars in one direction way but not the other (eg Earlestown).
Key problem places are Salford Cen/Cres, Newton le Willows, St Helens Jn, Horwich and the Blackpool line stations.
Most of the rest are 4/5-car with only 3-car at Salwick.
There is a platform extension plan for some stations but only to 6x23m.
Then it would seem that 4-car stock is a reasonable compromise. Maybe SDO could be fitted without breaking the bank as an alternative to extending the few stops limited to 6 cars. It shoud certainly be cheaper than cannibalising the 319s to 3-car.
I find it interesting so many people say Northern can't have new stock because they can't afford the leasing costs but then people say Northern should run 8 car EMUs even if 6 car would be sufficient just because the 319s are 4 car and will be surplus to requirements at Thameslink
I find it interesting so many people say Northern can't have new stock because they can't afford the leasing costs but then people say Northern should run 8 car EMUs even if 6 car would be sufficient just because the 319s are 4 car and will be surplus to requirements at Thameslink
With the references in postings for the Class 319 units to run in tandem as an 8-car train, can someone remind me exactly how many of these units are scheduled to be transferred to Northern Rail and of the currently-known period that has been scheduled for this to so occur. Also what is the currently-known updating that these said units will be receiving prior to such a transfer.
With the references in postings for the Class 319 units to run in tandem as an 8-car train, can someone remind me exactly how many of these units are scheduled to be transferred to Northern Rail and of the currently-known period that has been scheduled for this to so occur. Also what is the currently-known updating that these said units will be receiving prior to such a transfer.