Northern rolling stock changes post electrification

Status
Not open for further replies.

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
then substitute for 156s on Liverpool-Blackpool using the next ones terminating at Preston until Preston-Blackpool is complete.

That was suggested on another forum and the conclusion was there's 4 diagrams on Liverpool South Parkway-Blackpool services, while running a connecting Preston-Blackpool shuttle using a single diagram won't work, so that potentially leaves only 2 units released. It could also cause a lot of inconvenience when people return from the Blackpool illuminations on late trains especially if they have an onward connection at Liverpool so may cost the rail industry a lot in taxi fares? Not to mention the more obvious losing the direct Liverpool South Parkway (for Liverpool Airport) to Blackpool service may result in a number of suitcases having to be dragged around large interchange stations.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,189
Location
Bolton
Not to mention the more obvious losing the direct Liverpool South Parkway (for Liverpool Airport) to Blackpool service may result in a number of suitcases having to be dragged around large interchange stations.

And don't forget the suitcases that are likely to end up on coaches or in cars in that case...
 

martynbristow

Member
Joined
15 Jun 2005
Messages
426
Location
Birkenhead
I have seen no reports of Edge HIll to Earlestown being delayed. When was this reported please?

I think it should all be ready onetime given the lightning progress i've seen of late. Most of the wires seem to be going up.
But I think it should already be under test if its going to be ready for December, otherwise its cutting it fine.
And major projects not overrunning :P
--- old post above --- --- new post below ---
The updates to the electrification is http://www.railforums.co.uk/showthread.php?t=60290&page=169
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
I think it should all be ready onetime given the lightning progress i've seen of late. Most of the wires seem to be going up.
But I think it should already be under test if its going to be ready for December, otherwise its cutting it fine.
And major projects not overrunning :P
--- old post above --- --- new post below ---
The updates to the electrification is http://www.railforums.co.uk/showthread.php?t=60290&page=169

Well, I suppose a lot could happen in 3 months.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,903
Location
North
That was suggested on another forum and the conclusion was there's 4 diagrams on Liverpool South Parkway-Blackpool services, while running a connecting Preston-Blackpool shuttle using a single diagram won't work, so that potentially leaves only 2 units released. It could also cause a lot of inconvenience when people return from the Blackpool illuminations on late trains especially if they have an onward connection at Liverpool so may cost the rail industry a lot in taxi fares? Not to mention the more obvious losing the direct Liverpool South Parkway (for Liverpool Airport) to Blackpool service may result in a number of suitcases having to be dragged around large interchange stations.

I think the illuminations finish in November so wouldn't be this year. Hopefully, phase 2 would be finished by 2015 illuminations.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
I think the illuminations finish in November so wouldn't be this year. Hopefully, phase 2 would be finished by 2015 illuminations.

You said before "then substitute for 156s on Liverpool-Blackpool using the next ones terminating at Preston until Preston-Blackpool is complete."

Which implied you're proposing chopping the service until at least the May 2016 timetable change: http://www.networkrail.co.uk/North_West_electrification.aspx
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,620
Location
Rochdale
They were working so hard on the wires this morning they were still going at 6am! Somewhere Huyton way. I believe the last road railer was still out and delaying trains.

Hey ho. They had things back to normal by 09:00... ish.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
They were working so hard on the wires this morning they were still going at 6am! Somewhere Huyton way. I believe the last road railer was still out and delaying trains.
Hey ho. They had things back to normal by 09:00... ish.

The work was said to be near Earlestown, so probably steelwork erection.
Wires are a fair way off there.
 

martynbristow

Member
Joined
15 Jun 2005
Messages
426
Location
Birkenhead
The work was said to be near Earlestown, so probably steelwork erection.
Wires are a fair way off there.

Yeah its really cracking on when I've seen it.
They've been doing concretes during the day when I've been out that way.
They'll not be far off with it but possibly having left some big problem till the last minute :/
 

hairyhandedfool

Established Member
Joined
14 Apr 2008
Messages
8,837
They were working so hard on the wires this morning they were still going at 6am! Somewhere Huyton way. I believe the last road railer was still out and delaying trains.

Hey ho. They had things back to normal by 09:00... ish.

RRV broke down near Earlestown this morning, so the possession could not be given back on time.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,620
Location
Rochdale
Anybody have any moving images of the 319s up here yet? I keep looking!
 
Last edited:

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Believe the plan is for two days a week initially, then four. They should start very soon.
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,810
Location
Liverpool, UK
You said before "then substitute for 156s on Liverpool-Blackpool using the next ones terminating at Preston until Preston-Blackpool is complete."

Which implied you're proposing chopping the service until at least the May 2016 timetable change: http://www.networkrail.co.uk/North_West_electrification.aspx

Merseytravel have already stated that Liverpool to Blackpool will remain diesel hauled until Preston-Blackpool is electrified. There is a huge passenger flow from south of Preston which is catered for by the hourly service.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,608
Location
Nottingham
Merseytravel have already stated that Liverpool to Blackpool will remain diesel hauled until Preston-Blackpool is electrified. There is a huge passenger flow from south of Preston which is catered for by the hourly service.

Also trains terminating at Preston from either Liverpool or Blackpool have to share the congested platform 1 and 2 island with all other services on these routes, or cross to the fast lines creating extra conflicts. Introducing two more of these would probably be unworkable.
 

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
Driver training seems to have begun today between Allerton and Crewe.

Haha... Oops! Mods - delete this.
 