Northern rolling stock changes post electrification

Status
Not open for further replies.

sd0733

Established Member
Joined
7 Nov 2012
Messages
5,182
Does that mean both 319003 & 319006 are at Wolverton or is Number 3 referring to the third one for Northern?

319003 is still out and about, was on it early this morning on the 03:21 Gatwick Airport- bedford
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
I presume tomorrow's 5M80 from Bedford to Wolverton is for a Thameslink C6 unit and not the Northern units?
 

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,582
Location
PTSO or platform depending on the weather
I presume tomorrow's 5M80 from Bedford to Wolverton is for a Thameslink C6 unit and not the Northern units?

I thought this was for Monday....?

Is this two separate moves/units then, i.e. one unit moving from Bedford to Wolverton for C6 and another unit moving from Wolverton to Allerton?

Any idea which unit for C6? I could speculate....:D
 

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
I thought this was for Monday....?

Is this two separate moves/units then, i.e. one unit moving from Bedford to Wolverton for C6 and another unit moving from Wolverton to Allerton?

Any idea which unit for C6? I could speculate....:D

This is what I'm trying to confirm. There's moves booked tomorrow and Monday - I would presume tomorrow's is C6 (or it'll be cancelled) and Monday's is Northern's.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
I presume tomorrow's 5M80 from Bedford to Wolverton is for a Thameslink C6 unit and not the Northern units?

Its units for Northern not C6.

Wolverton only do two 319 C6s at a time, currently 319005/006 are there (with Northern's 319362).

Monday's move is for Northern units only.

There was only a move on Monday when I checked but multiple are booked to go.
 
Last edited:

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
Its units for Northern not C6.

Wolverton only do two 319 C6s at a time, currently 319005/006 are there (with Northern's 319362).

Monday's move is for Northern units only.

There was only a move on Monday when I checked but multiple are booked to go.

Ah I see, makes sense, thanks for clearing that up sir! :)
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,621
Location
Rochdale
Just a seen a picture of the units for Northern lined up at Bedford. 319380 wasn't on the list before was it?

Is this our borrowed one?

I cant seem to find the list of units that are due to come up unfortunately.

380,364 and 365 appear to be the chosen few!
 
Last edited:

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
Just a seen a picture of the units for Northern lined up at Bedford. 319380 wasn't on the list before was it?

Is this our borrowed one?

I cant seem to find the list of units that are due to come up unfortunately.

Indeed, that's your borrowed one.
 

Manchester77

Established Member
Joined
4 Jun 2012
Messages
2,628
Location
Manchester
Will there be some short formed trains on Thameslink until the 387s arrive since I thought the reason why only 3 319s could transfer until December was because they had to cover for C4&6 exams?
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Will there be some short formed trains on Thameslink until the 387s arrive since I thought the reason why only 3 319s could transfer until December was because they had to cover for C4&6 exams?

Technically the 'spare' trains are being used. Leaves things a read tight. The original plan had for units heading north prior to the 387s arriving. Now its six.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,729
Location
West of Andover
Up/Down, I get confused sometimes.

(I only noticed them as we were stopped at Hemel for 10-odd minutes with a temporary train fault).
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
No rush now that Liverpool to Manchester will not be ready for December.

There still appears to be no official news from Network Rail though.

Is there any chance of running 319s on Liverpool-Wigan instead? Electrification of Liverpool-Wigan and Liverpool to Newton-le-Willows was supposed to be done concurrently.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Is there any chance of running 319s on Liverpool-Wigan instead? Electrification of Liverpool-Wigan and Liverpool to Newton-le-Willows was supposed to be done concurrently.

Word is phase 2 as a whole is delayed with the Victoria part looking unlikely for May 2015.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Northern look like they could do with some DMUs released urgently based on how many short formations they are currently reporting

Northern Rail said:
15:23 Preston to Buxton due 17:24, 16:05 Manchester Piccadilly to Rose Hill Marple due 16:36, 16:53 Rose Hill Marple to Manchester Piccadilly due 17:26, 17:05 Manchester Piccadilly to Marple due 17:30, 17:23 Manchester Piccadilly to Chinley due 18:00, 17:29 Buxton to Manchester Piccadilly due 18:27, 17:37 Marple to Manchester Piccadilly due 18:02, 17:50 Manchester Piccadilly to Sheffield due 19:07, 18:05 Manchester Piccadilly to Rose Hill Marple due 18:37, 18:49 Manchester Piccadilly to Buxton due 19:47, 18:53 Rose Hill Marple to Manchester Piccadilly due 19:25, 19:14 Sheffield to Manchester Piccadilly due 20:33, 20:46 Manchester Piccadilly to Sheffield due 22:03, 22:47 Sheffield to Manchester Piccadilly due 00:10
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,621
Location
Rochdale
Unless the pretty much pack up at Vic till next year there is no way it will take them till May or beyond. Literally there are barely any stanchions missing now. You could put the wires up easily in two weekends.

Im wondering if we will see into Vic completed despite the delays so that the TPE diversion can return again electrically hauled ex Glasgow and Edinburgh

Good news about 380 anyway.
 
Last edited:

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
Move wasn't cancelled today... 319380 arrived at Allerton 20 minutes ago. One path was cancelled because there were duplicates in the system, that's all.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,904
Location
North
Is there any chance of running 319s on Liverpool-Wigan instead? Electrification of Liverpool-Wigan and Liverpool to Newton-le-Willows was supposed to be done concurrently.

This sounds very sensible if this route is more complete than Earlestown. Why not use the first 319s on this service then substitute for 156s on Liverpool-Blackpool using the next ones terminating at Preston until Preston-Blackpool is complete. Is the flow big enough to justify through trains for a couple of years? There will be someone out there who can tell me how many DMUs this would release from December 2014.

Reading threads here, it appears that more than three 319s will be in the North by December.
 