Does that mean both 319003 & 319006 are at Wolverton or is Number 3 referring to the third one for Northern?
319003 is still out and about, was on it early this morning on the 03:21 Gatwick Airport- bedford
Does that mean both 319003 & 319006 are at Wolverton or is Number 3 referring to the third one for Northern?
I presume tomorrow's 5M80 from Bedford to Wolverton is for a Thameslink C6 unit and not the Northern units?
I thought this was for Monday....?
Is this two separate moves/units then, i.e. one unit moving from Bedford to Wolverton for C6 and another unit moving from Wolverton to Allerton?
Any idea which unit for C6? I could speculate....![]()
I presume tomorrow's 5M80 from Bedford to Wolverton is for a Thameslink C6 unit and not the Northern units?
Its units for Northern not C6.
Wolverton only do two 319 C6s at a time, currently 319005/006 are there (with Northern's 319362).
Monday's move is for Northern units only.
There was only a move on Monday when I checked but multiple are booked to go.

Just a seen a picture of the units for Northern lined up at Bedford. 319380 wasn't on the list before was it?
Is this our borrowed one?
I cant seem to find the list of units that are due to come up unfortunately.
Just seen a triple 319 heading north at Hemel Hempstead, in the up slow line.
North on the up at Hemel?
Presume he means north on the down slow heading for Wolverton...
What were the unit numbers please? Assume 364/365/380...?
Will there be some short formed trains on Thameslink until the 387s arrive since I thought the reason why only 3 319s could transfer until December was because they had to cover for C4&6 exams?
http://www.realtimetrains.co.uk/train/K97568/2014/09/15/advanced
Could this be 364,365&380 heading northwards?
Looks like the move has now been cancelled.
No rush now that Liverpool to Manchester will not be ready for December.
There still appears to be no official news from Network Rail though.
Is there any chance of running 319s on Liverpool-Wigan instead? Electrification of Liverpool-Wigan and Liverpool to Newton-le-Willows was supposed to be done concurrently.
I doubt that very much.
Is there any chance of running 319s on Liverpool-Wigan instead? Electrification of Liverpool-Wigan and Liverpool to Newton-le-Willows was supposed to be done concurrently.
Northern Rail said:15:23 Preston to Buxton due 17:24, 16:05 Manchester Piccadilly to Rose Hill Marple due 16:36, 16:53 Rose Hill Marple to Manchester Piccadilly due 17:26, 17:05 Manchester Piccadilly to Marple due 17:30, 17:23 Manchester Piccadilly to Chinley due 18:00, 17:29 Buxton to Manchester Piccadilly due 18:27, 17:37 Marple to Manchester Piccadilly due 18:02, 17:50 Manchester Piccadilly to Sheffield due 19:07, 18:05 Manchester Piccadilly to Rose Hill Marple due 18:37, 18:49 Manchester Piccadilly to Buxton due 19:47, 18:53 Rose Hill Marple to Manchester Piccadilly due 19:25, 19:14 Sheffield to Manchester Piccadilly due 20:33, 20:46 Manchester Piccadilly to Sheffield due 22:03, 22:47 Sheffield to Manchester Piccadilly due 00:10
Northern look like they could do with some DMUs released urgently based on how many short formations they are currently reporting
Where from?
Is there any chance of running 319s on Liverpool-Wigan instead? Electrification of Liverpool-Wigan and Liverpool to Newton-le-Willows was supposed to be done concurrently.