Is anyone able to Confirm 100 Percent that a 319 Class is defo coming to Liverpool this Saturday?
Anyway back on 319's Rail North gave the transport select committee this week figures for how much more rolling stock they need and how much they would like. They said they needed another 220 carriages to meet demand but they would like 460 carriages for the extra services they envisage.
Is anyone able to Confirm 100 Percent that a 319 Class is defo coming to Liverpool this Saturday?
Anything on Real Train Times?
You can't ever be 100% sure as things can happen like a unit problem, a track defect, staff sickness etc.
--- old post above --- --- new post below ---
So like I've said before more than half the 319s are needed for extra capacity at Northern before we can consider withdrawing older DMUs.
and then the ex Moorgate 313s can be released.
the 313's will be almost 42 years old so will any one want them
They'll probably have to take them if the government says so, especially if existing diesels are needed elsewhere.
They'll need wires to run them on first. When the 313s are released there's expected to be all the 319s, most(all?) of the 315s, some 365s and some 387s released as well. Assuming all CP5 electrification is now announced who'd want 313s if it meant one of the others going for scrap?
They'll need wires to run them on first. When the 313s are released there's expected to be all the 319s, most(all?) of the 315s, some 365s and some 387s released as well. Assuming all CP5 electrification is now announced who'd want 313s if it meant one of the others going for scrap?
TPE could easily soak up 60 Class 319s.
That removes your oversupply of units just like that.
While they are not swimming in power they should be able to get fairly close to matching Class 185 performance (the Class 185 appears to have 25% more power/tonne but those are engine horsepower and not axle horsepower and thus are not the same).
And since TPE electrification isn't finished right now you can actually give them a proper internal reconstruction and maybe even retraction them to get some more power and tractive effort out of them.
TPE could easily soak up 60 Class 319s. That removes your oversupply of units just like that.
TPE could easily soak up 60 Class 319s.
That removes your oversupply of units just like that.
While they are not swimming in power they should be able to get fairly close to matching Class 185 performance (the Class 185 appears to have 25% more power/tonne but those are engine horsepower and not axle horsepower and thus are not the same).
And since TPE electrification isn't finished right now you can actually give them a proper internal reconstruction and maybe even retraction them to get some more power and tractive effort out of them.
TPE could easily soak up 60 Class 319s.
That removes your oversupply of units just like that.
While they are not swimming in power they should be able to get fairly close to matching Class 185 performance (the Class 185 appears to have 25% more power/tonne but those are engine horsepower and not axle horsepower and thus are not the same).
And since TPE electrification isn't finished right now you can actually give them a proper internal reconstruction and maybe even retraction them to get some more power and tractive effort out of them.
What is the current maximum traction unit depot capacity of both Northern Rail and of First TPE that could handle such a large number of Class 319 units that you state above ?
Fairly close performance wise would not be good enough though. The 185s do a good job in coping with the demands of the TPE routes, and whenever I've been in one climbing towards Marsden / Diggle in icy & snowy weather all that extra power really pays dividends. Could the 319s really cope with the demands of the North TP without having to rework the timetables?
And it would be a downgrade passenger wise from a 185 to 319 without a serious amount of refurbishment, and not forgetting that TPE are running some 185s in twos on some paths, so replacing them with 319s would cause it's own problems as some stations would struggle with an 8 car 319 set.
Considering this massive capacity increase is one that DfT projections indicate has to occur anyway there is no massive cost - and doing it with 319s and so on that should (if the market functioned in any way at all) have lower leasing charges is likely to save money.And who would pay for this massive capacity increase on TPE?
Electrification hasn't even started yet, but what are Northern going to use if the 319s are off being refurbished?
The current displacements from Thameslink are
14x 319 by July 2015 (for Northern)
10x 387/1 by Dec 2016
62x 319 by early 2017
13x 321 by mid 2017
12x 317 by mid 2017
25-ishx 465 by late 2017
25x 377 by end of 2017 (for SE)
44x 313 by end of 2018
19x 387/1 by Dec 2018
Thameslink has no 465s do you mean 365s on the GN route?
If platforms are lengthened to accommodate 160m trains, Network Rail's borrowings will have to increase to fund the infrastructure investment. So DfT will have to increase the Network Grant subsidy to cover the on-going increase in interest charges.Well how long is there between the 319s being surplus to requirements and being needed for the newly completed TPE wiring?
There is time for a complete retraction and serious internal work.
And whilst an 80m 4-car train is not an enormous jump in capacity over a 69m 3-car train it is not negligible.
Has any work been done on accepting 160m trains at Huddersfield and other major stations?
Are the doubled up sets always the same paths or does every TPE station recieve some 6-car sets at present?
--- old post above --- --- new post below ---
Considering this massive capacity increase is one that DfT projections indicate has to occur anyway there is no massive cost - and doing it with 319s and so on that should (if the market functioned in any way at all) have lower leasing charges is likely to save money.
Thameslink has no 465s do you mean 365s on the GN route?
I think he has written 'Thameslink' rather than the entire TSGN combined franchise. See also that the 377s passing from SN to SE are also listed; so the list is for units from all three relevant 'routes'.
If platforms are lengthened to accommodate 160m trains, Network Rail's borrowings will have to increase to fund the infrastructure investment. So DfT will have to increase the Network Grant subsidy to cover the on-going increase in interest charges.
On the other hand, the TOC would presumably incur increased leasing costs, somewhat offset by reduced maintenance costs and track access charges, if it procured new-build 69m 3-car EMUs instead of refurbished and retractioned 319s. This would potentially require an increased DfT subsidy to the TOC.
Can anyone estimate the relative net subsidy costs of these two options?
Looks like at least one may move from Wolverton to Allerton on Tuesday 9th September. I'd have thought it would be too soon for 319363 to be done, given it only arrived on the 1st.
5X19 - http://www.realtimetrains.co.uk/train/K07607/2014/09/09/advanced
Looks like at least one may move from Wolverton to Allerton on Tuesday 9th September. I'd have thought it would be too soon for 319363 to be done, given it only arrived on the 1st.
5X19 - http://www.realtimetrains.co.uk/train/K07607/2014/09/09/advanced
While the only rule of thumb of 2x as much for refurbishment and 4x as much as new build. However the 69m new build vs 80m 319 also means differences in revenue with the 319 having a higher possible income while having a lower rental cost so its cost to benefit ratio will be far higher than new build.
A good point. Once the Lancashire Electrification is complete storage would be available at Allerton, Stockport, Blackpool North, and Preston. Also it is to be hoped that the sidings at Manchester Victoria would be wired. Extending the wires the short distance from Miles Platting to Newton Heath could allow storage there. Also there will be overnight storage in the bays at Preston and Wigan Wallgate.