SWT_USER
Member
Are all the 319's being de-branded at the moment? Just seen 319363 paired up with another on am ecs near London Bridge with FCC logos removed.
Are all the 319's being de-branded at the moment? Just seen 319363 paired up with another on am ecs near London Bridge with FCC logos removed.
Are all the 319's being de-branded at the moment? Just seen 319363 paired up with another on am ecs near London Bridge with FCC logos removed.
How many have been de-branded, noting 14 have been confirmed as transferring to Northern?
Most if not all of the FCC trains (319 and 377) I saw yesterday were sans branding
The Southern 377's we've got on loan at the moment are causing havoc at East Croydon when they arrive on a Brighton TL service alongside a Southern Brighton express. People not sure which one they want...too late...![]()
Isn't the new franchise retaining separate branding for what are now Southern and FCC services?
As a user from Wimbledon to Thameslink the carriages that are going 'up North' are dirty inside and out and the seats are knackered! Talk about in need of a refresh!
The 319/0s are basically in NSE condition except with FCC seat covers aren't they?
The cabs are equally disgusting with a layer of grime over everything (apart from the newish top half of the desk). Could do with a really good scrub throughout.The 319/0s are basically in NSE condition except with FCC seat covers aren't they?
The cabs are equally disgusting with a layer of grime over everything (apart from the newish top half of the desk). Could do with a really good scrub throughout.
Plan is that next Monday, 1st September, 57306 will take a 319 up north (363 comes off lease on 1st September so will be that). There'll be a stop off at Wolverton to pick up 362 and then the two units will go to Allerton. Pretty sure I saw that the wires at Allerton would go live at end of August, too.
...I can't keep up, thanks to pet136 as always...
Plan is that next Monday, 1st September, 57306 will take a 319 up north (363 comes off lease on 1st September so will be that). There'll be a stop off at Wolverton to pick up 362 and then the two units will go to Allerton. Pretty sure I saw that the wires at Allerton would go live at end of August, too.
...I can't keep up, thanks to pet136 as always...
Is it on Real Time Trains yet
Note the move next week has been postponed...![]()
Apparently due to the modification works at Allerton depot running late
You mean the 'go live' for the wiring to be juiced at the depot?
Any news on when the move is back on?
Tony Miles in September's Modern Railways says that before introduction with Northern the 319s are getting:
- internal and external repaint
- seating refurbishment
- door controls, and ability to make announcements, in each car
- PIS
Some work will be done at Wolverton but some also at Allerton.