So with Southport passengers excluded what does it look like crowding wise?
So with Southport passengers excluded what does it look like crowding wise?
Busy 4 car Sprinter at peak times sounds like just running a Class 319 would not be a disaster.
We shouldn't just assume that explosive passenger number growth is going to occur - because that way we risk getting caught out.
If 4 cars is not enough then we should discuss it once it is demonstrated to be the case.
Already demonstrated to be the case for the TPE services :P
They always arrive at Wigan from Preston with people already standing so a 40+ minute journey to Manchester would be well in breach of the 20m max standing time Dft guidance.
Future Growth does not have to be accounted for now..... it has to be accounted for in the future.
4-cars will be adequate on many services today, we can worry about lengthening when those are bursting.
319008 appears to have had its Southern logos re-applied.
Future Growth does not have to be accounted for now..... it has to be accounted for in the future.
4-cars will be adequate on many services today, we can worry about lengthening when those are bursting.
According to the sectional appendix, Salford Crescent platform 1 is 158m and platform 2 is 153m, so we're only talking about adding 7m to the shortest one e.g. converting the end ramps to usable platform space might do it (newly built platforms e.g. the recent Cambridge and Peterborough additions, have squared off ends with fencing so ramps are obviously not a requirement now)
Clifton is 172m, Bolton is 200m+, Lostock is 155m, Horwich Parkway is 142m, Chorley is 140m, Buckshaw Parkway is 150m, so accommodating limited stop 8-car 319s Manchester-Preston doesn't feel like a huge undertaking in terms of platform lengthening.
Clifton isn't served by any services which will be converted to electric operation, neither is Moses Gates, Kearsley or Farnworth. Farnworth is the one with the highest usage out of those 4 if you considering adding additional services.
.
By the time future growth has happened it is too late to say "We don't have enough capacity" and then plan for the future with the figures we have now.
I don't think that's how DfT planning works.
There will be a cap on the number of vehicles/units for the new franchise.
It will probably be more than now, but it won't be "as many as you want".
Otherwise the subsidy just rockets.
That's why they are talking about "tailoring services better to demand".
But we don't know exactly what services will operate after electrification. Some, at least, of the above stations may get through services to Wigan, Preston, or elsewhere, with a skip-stop pattern of services (similar to that to be used for intermediate stations on the Manchester / Huddersfield line. )
I don't think that's how DfT planning works.
There will be a cap on the number of vehicles/units for the new franchise.
It will probably be more than now, but it won't be "as many as you want".
Otherwise the subsidy just rockets.
That's why they are talking about "tailoring services better to demand".
^^ Now is that really reapplied or had they been covered up with a vinyl and had the vinyl covering them removed?
As it appears Thames Valley is going to need new stock.... is there any way for Northern to use up the entire fleet of 86 Cl319s?
Replacing individual Pacers with 4-car sets might do it I suppose....
Maybe they should fund a special addon scheme like the hull one, specifically for Pacer replacement. (Marple or somesuch)
Hunts Cross to Trafford Park electrification would remove the last diesel hauled local stopping trains out of Liverpool Lime Street.
Hunts Cross to Trafford Park electrification would remove the last diesel hauled local stopping trains out of Liverpool Lime Street.
The services calling at intermediate stations between Bolton and Salford Crescent already go to Wigan. AIUI the proposal for skip-stopping the Huddersfield route was only supposed to be necessary prior to electrification.
That's assuming the Halton curve and route to Chester is electrified. It will be interesting to see which is the first to be electrified.
Hunts Cross to Trafford Park electrification would remove the last diesel hauled local stopping trains out of Liverpool Lime Street.
It also would release a lot of DMUs for various different roles.
About 6 diagrams, from the local service only, plus perhaps some peak strengthers. Half the trains are (or will be) running through onto the Hope Valley so have to remain as DMUs.
I don't think its dependent on the Halton Chord being done. There is no connection between the two.
Would it only be about 6 diagrams or would that be the minimum number for a half hourly Cheshire Lines service? I'm sure I see more than 6 sets of units on a daily basis on the Liverpool to Warrington and Manchesters. They run past the bottom of my garden and I use them on a very regular basis.
Apologies, you did say some peak strengtheners. still would have thought more than 6 diagrams covered the route though.