Class377/5
Established Member
- Joined
- 19 Jun 2010
- Messages
- 5,594
6 car operation on the Bolton line is rare now the Scottish portion workings no longer exist.
The question is where are you going to get the extra funds for Network Rail to lengthen platforms they haven't included in their CP5 plans? Salford Crescent was only recently lengthened to allow 6 car 185s. I think only Blackrod and one platform at Leyland would need lengthening to allow 6 car 319s. If it's 8 car 319s then most platforms need doing. Or you could arrange for EMUs with SDO to be used and not lengthen any platforms? Or alternatively without platform extensions use 2 x 3 car EMUs and have the rear unit locked out of use north of Horwich Parkway?
Question of funding should b something Rail North should be looking into to fund actual improvements. Perhaps local authorities should look for business to chip in to a transport fund or at least get bigger business on the route to give something. London has done this, in fact so has Manchester with the Metrolink Airport Line.
Rather than always complaining no-one is giving funding, perhaps people need to realise they need to push to get extra funding to improve local services. Its happened before in the shape of the Metrolink. Seems rather lazy of many on here to just complain but happy to sit back and do nothing.
I don't think we assume if the franchise operator wants to run 8 car EMUs then Network Rail will automatically arrange the provision. Weren't the 350/1s supposed to be used to lengthen SWT services but didn't happen as a platform lengthening program wasn't approved?
The 450/1 (what became the 350/1) were ordered with the SRA permission on the basis of longer platforms until they got the bill for platform lengthening and chickened out.
If 3 car EMUs were sourced then there's no need to do that. DfT are trying to fit square pegs in to round holes by sending 319s North and Porterbrook are trying to prove there's a solution to turn the square pegs in to round ones.
Maybe if the 377/5s were sent North, a car could be removed to lengthen most of the 377/3s and the North would then have 3 car EMUs with corridor connectors - ideal for 6 car operation.
The 377/5 are spoken for as are the 377/3. Of course the ugly truth of much more expensive leasing costs for new built has been overlooked in your suggestion.