Northern rolling stock changes post electrification

Status
Not open for further replies.

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
No, in a word!
Although Northern Liverpool drivers (or more likely driver instructors) may need to route learn Crewe in order to facilitate practical handling on 319s due to delays with the OHLE on the western half of the Chat Moss route.

Northern crews already work via Runcorn (on ECS/parly from Chester).
I'm not sure you can describe the Chat Moss electrification as "late" yet.
The wires from Crewe have only been up for 50 years...
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
The electrification between Earlestown East Jn and (what is to become) Bootle Branch Jn OHNS is about two months behind.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
A meeting. The original commissioning date was planned to be Sept 2014.
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
A meeting. The original commissioning date was planned to be Sept 2014.

Looks like I had good reason all along to be a bit worried about the lack of progress in certain areas!

Going into Manchester from St Helens Junction today, there still appears to be no work on the Sankey Viaduct or any structures at Earlestown, although yesterday I can confirm a number of mast bases are now situated on the West-South curve (Liverpool to Warrington Bank Quay).
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,493
Location
DTOS A or B
Is 377213 in the fleet yet, if not it and a n other have been delivered this afternoon.


http://www.realtimetrains.co.uk/train/X48946/2014/08/02/advanced
 
Last edited:

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
The NR annual report was out last week which has performance reports on all projects. According to that report there were no slippages anywhere except liverpool-Leeds line speed improvements had slipped from March to August.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,196
Location
Bolton
The NR annual report was out last week which has performance reports on all projects. According to that report there were no slippages anywhere except liverpool-Leeds line speed improvements had slipped from March to August.

Oh, I didn't realise the project included any line speed improvements between Manchester and Leeds!? Chat Moss used to be 75 throughout didn't it? Bits are already up to 90 - I understand more to come?
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,814
Location
Liverpool, UK
No, in a word!
Although Northern Liverpool drivers (or more likely driver instructors) may need to route learn Crewe in order to facilitate practical handling on 319s due to delays with the OHLE on the western half of the Chat Moss route.

What delays with wiring on the line between Earlestown to Edge Hill?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
What delays with wiring on the line between Earlestown to Edge Hill?

The "completion" date (GRIP stage 6) that is being measured by the DfT/ORR is December 2014.
The NR project plan was to finish in September to allow running in and (no doubt) crew training on the 319s.
Looks like, as for Phase1, they will finish "just in time" for the December date.
Naturally, it puts more pressure on the rest of the NW wiring programme.
Phase 2 also includes Ordsall Lane-Victoria, which might finish first.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
The 319s need new pantographs fitted before they are allowed on the newly wired Chat Moss route but apparently they can be changed in 24 hours if they've not already been swapped.
 

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
From WNXX for those not on there, works at Wolverton for 362 will include a refresh. DfT told Northern nothing should be done to the units until the next franchise, but it seems Northern have managed to lobby for a minor cosmetic refresh now. Then will go north from Wolverton behind 57306.
 
Last edited:

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I thought that was always the plan limited works such as, unplating guard controls, debranding, deep clean, new seat covers, etc...
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
according to rail magazine only 14 units are being cascaded to northern

Do you mean so far announced or that is it? What about Hazel Grove to Preston, Stalybridge to Blackpool North and a whole host of other routes that will need EMUs in the next 2-3 years? :s
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,801
Location
Epsom
TSGN are planning to move the dual voltage 377s off what is now Southern and use them on what is currently FCC that they are taking over; that will presumably release a load of 317s for the north west?
 

petersi

Member
Joined
24 Apr 2012
Messages
453
TSGN are planning to move the dual voltage 377s off what is now Southern and use them on what is currently FCC that they are taking over; that will presumably release a load of 317s for the north west?
The 317s and 321s were always going to be cascaded. This will release some 365s
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
And also air con fitted

No, aircon is a future possibility when the size of the eventual Northern fleet is agreed.
14 units with minimum upgrade is to get Northern up to the 2016 new franchise date.
Anything beyond that is up to the bidders after the ITT is out in December.
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
No, aircon is a future possibility when the size of the eventual Northern fleet is agreed.
14 units with minimum upgrade is to get Northern up to the 2016 new franchise date.
Anything beyond that is up to the bidders after the ITT is out in December.

Heard originally on the NW-sparks website that they were going to be fitted.
 