Fixed at 5. The new GN Moorgate metro design is said to be 6-car and the Crossrail stock is 9-car. The 378s have always been fixed formation, it's just that the formation has been extended as the Overground sparks effect has increased patronage.

Sorry, I'm getting the terminology mixed up. All MUs are a fixed formation, whereas a train is considered to be a fixed length where MUs are not coupled in regular service. Which will apply to the future Thameslink, Crossrail and Moorgate fleets but not the SWT Class 707.

The future fleet for London Overground is an example of both: the 30 units assigned to Lea Valley service will couple in service, but the 15 on Romford-Upminster, Goblin and Watford DC will not.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AM9

Veteran Member
Joined
13 May 2014
Messages
16,020
Location
St Albans
Normally electrification has been done on lines with potential for significant growth. North West electrification and TransPennine electrification is in areas which have seen exponential growth without electrification over the last 10 years. So it's not possible to compare it with previous schemes, these are likely to expose the 'electrification sparks growth' as an old wives tale.

The sparks effect is genuine and however much you think that traffic has grown in south Lancashire between the two PTE areas, the roads are still full, the UK economy is still (slowly) recovering and if we believe it, the 'Northern Powerhouse' will certainly need a bit more than a few more 156's pumping out PM10s and NOXs to move increasing numbers around. Even in the south we are bombarded with TV reportage on how the North is held back by slow, under-capacity and unreliable rail services both into and out of cities and across the Pennines. So if that's all a lie, then maybe your assertion that the sparks effect won't do anything for NW rail travel is credible.

Yes without the 319s electrification wouldn't be done. Electrification was an alternative to an order of brand new DMUs when DfT realised they would be spare EMUs as a result of Thameslink and they were proposing ordering new DMUs for Northern, TPE and FGW.

That was then. What has been authorised is electrification of all the major lines in the NW, Electrification of at least one trans-Pennine route out to the ECML, electrification of the Windemere branch and electrification of the GWML and some of it's tributaries. All of that work is heavy investment for decades, maybe over 100 years, not just the life of some DMUs. If they had been purchased, in 30 years time there would be all the same clamour for their replacement, at a similar cost (suitably escalated for inflation) all over again, whilst the wires installed this year will still be doing their job at no extra cost save for routine maintenance. It's refreshing that the DfT are taking such a forward-thinking view rather than making a typical short-term fix to appease the noisiest objectors until after the next General Election.

The December 17 timetable for Chat Moss is set to be:
* 3tph Liverpool to Wigan - 1tph continuing to Preston/Blackpool
* 2tph Liverpool to Yorkshire/North East service via Victoria - alternate services running non-stop between Lime St and Victoria
* 1tph Liverpool to Manchester Airport stopping service.

I think transformation of services will happen as a result of the Ordsall Chord opposed to electrification, that is the one thing which will allow a complete recast for the Manchester area with more services. Indeed most of the TPE improvements are set to occur at least 3 years before Manchester-York electrification.

I think that the services will be free to evolve, with the availability of more serviceable EMUs over the next five years on newly electrified routes. You are correct that the Ordsall Chord will improve access for trans-pennine services, but that will soon be constrained by the capacity of the line from Huddersfield and Leeds. The capacity of that line with its gradient challenges will only improve when electified. HS3, if it happens at all will be the mechanism for that. For sure nobody would propose that diesel trains are used on that, so to provide through services west of Manchester, those trains will need some wires to draw power from.

I think you're wrong in the case of Chat Moss. DfT thought Chat Moss should be electrified over the CLC for 2 reasons:
1. Chat Moss could be used as a diversionary route for WCML services to reach Manchester and Liverpool if it was electrified.
2. They thought it would help with overcrowding on the CLC line as there would be more Manchester-Liverpool services. However, so far this hasn't proved to be the case despite the CLC line now having as many services as it will have in December 2017.

1) Electrification projects the size of the Chat Moss line are major capital investments, and every benefit must be extracted from them. If they form part of a diversionary route as well as allowing for growth of local/regional passenger traffic between two major cities then that's a bonus. If you think that the electrification was all about saving the cost of a few rail replacement buses, they why was the re-instatement of four tracks between Roby and St Helens Junction included? Your conspiracy theories about DfT's real intentions don't seem to stand examination.
2) Your 'proof' assertion once again is based on there not being a seismic change in travel patterns in less than 3 months after services improved. Ergo, electrification doesn't work!, - they should have listened to you and bought a lot of new DMUs instead. I'm inclined to think that this is another of your complaints about not getting new trains, especially on the lines that you use the most.

It's a bit like the line through Stone being electrified. It's wasn't primarily because of loadings on local services, it's primarily to allow an improved Intercity services on the WCML.

So what you feel about one scheme definitely applies to all others, mmmm.
--- old post above --- --- new post below ---
The future fleet for London Overground is an example of both: the 30 units assigned to Lea Valley service will couple in service, but the 15 on Romford-Upminster, Goblin and Watford DC will not.

I was referring to the existing 378s which have always been fixed length (but the length has grown over years. On the 707s, yes you are right, but I think that there has been a general trend recently to exploit 5-car sets that spend most of the time in that form, i.e. the 377/6 and 377/7s.
The 707s will have a very large crush loading, something that SWT may well exploit to save costs.
 
Last edited:

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
So what you feel about one scheme definitely applies to all others, mmmm.

No I'm comparing one line with one line. The West Coast diversionary route was a key reason for Chat Moss electrification, like it was for Stone.

The sparks effect is genuine and however much you think that traffic has grown in south Lancashire between the two PTE areas, the roads are still full, the UK economy is still (slowly) recovering and if we believe it, the 'Northern Powerhouse' will certainly need a bit more than a few more 156's pumping out PM10s and NOXs to move increasing numbers around. Even in the south we are bombarded with TV reportage on how the North is held back by slow, under-capacity and unreliable rail services both into and out of cities and across the Pennines. So if that's all a lie, then maybe your assertion that the sparks effect won't do anything for NW rail travel is credible.

What I'm saying we've seen exponential growth without electrification. Since the introduction of 185s passenger numbers on TPE routes have increased by 100%. Will electrification result in further growth of over 100% over the next 10 years? If not then how can it be claimed electrification sparks growth if growth slows down post-electrification. Had Manchester-York/Blackpool/Windermere been electrified by 2006 would people be claiming the exponential growth is down to electrification?

One reason why a civil servant claimed the BCR for replacing Pacers is poor is because the use of old Pacers isn't preventing passenger growth as you might expect. Growth doesn't just happen as a result of electrification. Incidentally Patrick McLoughlin re-confirmed a commitment to withdraw Pacers today, I think the first time it's been mentioned since the election.

That was then. What has been authorised is electrification of all the major lines in the NW, Electrification of at least one trans-Pennine route out to the ECML, electrification of the Windemere branch and electrification of the GWML and some of it's tributaries.

That sounds like a David Cameron type statement. Major lines in the North don't include Manchester-Warrington-Liverpool, Manchester-Sheffield, Manchester-Holyhead and Manchester-Cardiff in your opinion?

why was the re-instatement of four tracks between Roby and St Helens Junction included?

Maybe because DfT wanted a headline Liverpool-Newcastle service in under 3 hours to run via Chat Moss?

Your 'proof' assertion once again is based on there not being a seismic change in travel patterns in less than 3 months after services improved. Ergo, electrification doesn't work!

I never made any such claim. I said electrification and a cascade of 319 (together with the consequences of the 170s going to Chiltern) resulted in some services getting extra capacity when they didn't necessarily need it and other services which desperately need extra capacity not getting anything. Do you think it's better to provide for potential passengers than real passengers?

they should have listened to you and bought a lot of new DMUs instead.

Considering DfT have finally admitted it is not possible to provide extra capacity and Pacer replacement by electrification alone and are requiring the winner of the next Northern franchise to deliver a minimum of 120 new self-powered vehicles (or alternatively new carriages hauled by self-powered locos) and it was originally proposed Northern should get 130 extra diesel carriages for extra capacity by December 2012, I'm not sure what your point is. If those 130 carriages had been delivered already we wouldn't be worrying about new emission standards for DMUs, no open production line for DMUs suitable for UK use and the problems caused by Chiltern poaching the 170/3s would have been less severe.

Electrification could still have occurred as a long term solution with the DMUs an immediate solution.

I'm inclined to think that this is another of your complaints about not getting new trains, especially on the lines that you use the most.

At the moment we don't know which lines will get the new trains in the North and we also don't know which lines may get cascaded Turbostars if Northern bidders take up that option, so I don't know if the lines I use most will get new or newer trains.
 

Philip C

Member
Joined
21 Feb 2013
Messages
407
It's a bit like the line through Stone being electrified. It's wasn't primarily because of loadings on local services, it's primarily to allow an improved Intercity services on the WCML.

I'm missing the point re. "line through Stone". Could you clarify please?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Manchester Airport-Liverpool services were all booked as 2 car Sprinters, mainly 156s.
Manchester Victoria-Liverpool services was rarely 4 car except at peak times. Off-peak services were mainly 2 car 142s and 2 car 150s.
Wigan-Liverpool was the one route which could see 4 car workings all day. It's also the route which saw 4 car 156s so you could argue 4 car 319s are less comfortable with smaller carriages and higher density seating.
What introducing 319s has done has ensured all those services go up to 4 car all day whether they have 50 passengers, 150 passengers or 250 passengers. Hence some services have a lot of empty seats.
If Northern had received additional diesel carriages the majority of them probably wouldn't have gone on to Chat Moss. The extra carriages have gone on to Chat Moss simply because it's been electrified, while other Northern services which urgently need extra capacity continue to get the same number of carriages due to Northern having to loan 6 x 156s to TPE so that Chiltern passengers can enjoy improved services.

This sounds as though you disagree with the original decision to wire Chat Moss rather than the CLC.
I agree nobody has ever explained why they made that decision, but it's unarguable that the Chat Moss gives you more network benefit than the CLC does, because of its lack of connections.

Where would you put the 319s then?
The Chat Moss services, like most of Northern's DMU lines, only gets 2-car trains because that's all Northern has.
Even the Wigan line only had one of its four trains doubled up (never the one you are on).
In my experience the busiest trains out of Lime St are the Blackpools, and they are still pottering round with single DMUs.
Eventually the 319s will work all over the NW, maybe even to Huddersfield/Selby.
The only other current locations for them would be to augment/replace the 323s south of Manchester, or the Leeds local services.
Until Northern has enough to play around with, the best they can do is replace the DMUs on new lines.
It looks like being 2017 before they will have scope to optimise the electric network, and that will be in the new franchise.
In fact, I suspect the DfT is expecting "something completely different" from the bids now in progress, to integrate the three current separate electric networks.
Northern are marking time just now, really, till 2017.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
I'm missing the point re. "line through Stone". Could you clarify please?

The reason that line was electrified was to provide a diversionary route for electrified services on the WCML.

The reason why Chat Moss was chosen ahead of other routes in the North was similar as it allows WCML services to access both Manchester and Liverpool via alternative fully electrified routes. Virgin used to drag Pendolinos running London-Scotland via Manchester during engineering works between Wigan and Crewe, now they don't need to.
--- old post above --- --- new post below ---
This sounds as though you disagree with the original decision to wire Chat Moss rather than the CLC.
I agree nobody has ever explained why they made that decision, but it's unarguable that the Chat Moss gives you more network benefit than the CLC does, because of its lack of connections.

I think the decision to wire Chat Moss first was wrong and probably the only reason it was done first is because DfT wanted TPE to get EMUs for extra capacity not DMUs and then decided the easiest way of doing that was diverting Scottish services and wiring the eastern part of Chat Moss. Then once the eastern part was done and it was only logical to do the western part.

A decision was made at some point that North TPE services to/from Liverpool would switch to Chat Moss. However, with Manchester-York electrification being delayed that could result in 6 years of TPE running DMUs on Chat Moss, which provides another reason why it would have appeared more sensible to wire other lines first.

I think Manchester-Bolton-Blackpool would have been a better first choice as it would have switched a greater number of services to electric. Then Gospel Oak should have been done simultaneously as that way it would have released 172s which Chiltern could then take on, without Chiltern having to nab 170s from another operator who still needed them.

However, the underlying problem is a need for more DMUs was identified and the alternative to avoid ordering new DMUs wasn't a solution that could solve capacity problems in a satisfactory time frame.

The Chat Moss services, like most of Northern's DMU lines, only gets 2-car trains because that's all Northern has.

I don't agree with that. The PTEs have made decisions about which services should be strengthened to 4 car and which should remain as 2. The Liverpool-Manchester Airport services weren't considered busy enough by 2 different PTEs to prioritise strengthening them to 4 cars, yet the majority of Southport-Manchester Airport services got strengthened to 4 cars.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
There aren't enough trains for them to strengthen everything they want and they have to justify putting the resources wherever brings maximum return for their constituents.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
I think the decision to wire Chat Moss first was wrong and probably the only reason it was done first is because DfT wanted TPE to get EMUs for extra capacity not DMUs and then decided the easiest way of doing that was diverting Scottish services and wiring the eastern part of Chat Moss. Then once the eastern part was done and it was only logical to do the western part.

Well, we are where we are.
My view of the choice of Chat Moss is that Andrew Adonis, when he decided to fast track electrification schemes, realised that politically he had to authorise a northern route as well as the GW (also the GW into Wales for similar reasons).
When he asked Network Rail what northern scheme would deliver quick results on the big picture, they said Chat Moss for Manchester-Scotland.
Network Rail (and its predecessors) had already designed that route at least once since the original WCML scheme, and probably never imagined that the CLC or Bolton routes would get looked at.
The WCML diversionary capability won't be the basis of the business case, it's just a bonus.
You also seem very ready to take the PTE's view of the world.
Network Rail and HMG, fortunately, have to take a wider view of the network.
How that will pan out under Rail North we will soon see.
How much did they pay into the electrification kitty?
 

Philip C

Member
Joined
21 Feb 2013
Messages
407
The reason that line was electrified was to provide a diversionary route for electrified services on the WCML.

I understand what you are driving at, however I'm not sure that you are historically correct.

When the Stone-Norton Bridge line was electrified in the 1960s it was as an integral part of the Manchester/Liverpool to London via the Trent Valley/West Midlands route. Initially there was a semi-fast two-hourly EMU (AM10=Cl.310) which left Piccadilly at five past the odd hour and was non-stop between Stoke and Stafford en route to Birmingham NS. Then there was a two-hourly stopping EMU (AM4=Cl.304) leaving Piccadilly at thirty-five minutes past the even-hour which terminated at Stafford having called at Wedgwood, Barlaston and Stone between Stoke and Stafford (but not at Norton Bridge). Finally there were a few Piccadilly-Euston trains routed that way (the 0720 [which I remember using once] and the 1415 Pullman service). I ought to add that there were a few more 'bib & bobs' in the peaks.

At that time the West Country trains, such as they were, were still running via Shrewsbury and Hereford and so the semi-fast EMU (114") and the two-hourly loco-hauled Piccadilly-Crewe-West Midlands-Euston provided for Manchester-Birmingham traffic (98" to New St.). In those days there was a lot of loco-hauled (incl. electric hauled) freight about on the North Staffordshire main line and much of that would have gone via Stone.

Diversions via Stone were, of course, possible; but (1) the normal Piccadilly-Euston trains via Hixon only comprised a two-hourly service for much of the day (the last service via Hixon left Piccadilly at 1830!), (2) the infrastructure was new and would not have required line closures, (3) we were still in an era when work on one line didn't imply closure of both, (4) diversion via Crewe was an obvious option and (5) the fact that the route via Alsager wasn't electrified made electrification of the Stone-Norton Bridge section irrelevant in the rerouting of trains from North Wales, Liverpool, Preston etc. between Crewe and Stafford.

In short I conclude that the Stone-Norton Bridge section was a logical element of the electrification of the whole route from Cheadle Hulme to Stoke and beyond. It would have been conceivable not to have electrified this route at all and relied on the Wilmslow-Crewe route, but electrifying the North Staffordshire Line logically required both outlets (at Colwich and Norton Bridge) to be wired so that all Manchester-Stoke and beyond services could cease being steam/diesel. Any diversionary benefits will have been both small and incidental.

If can point me towards any documents supporting another interpretation of what was done I'd be most interested.


On the issue of Chat Moss versus Warrington Central electrification I can only speculate that it is the prioritisation of the Standedge route (vis-a-vis the Hope Valley) and the desirability of rationalising train pathing in the Piccadilly-Ardwick-Slade Lane Junc. area that has led to the choice. I regard the rerouting of the Airport-Scotland services to be, at most, a marginal benefit. The Anglo-Scottish diversion route is only of any real benefit for the limited time that routes via Westhoughton or Chorley are not under wires. I have been interested to see that diversions to Liverpool have been effected via Eccles and not via Warrington BQ/Earlestown. Is this solely due to the location of the works or is this truly the preferred option? Thus, in the context purely of Manchester/Liverpool it might have been as logical to electrify the CLC as the LNWR route - but, I'd contend, it to be the Trans-Pennine factors that swung it in favour of Chat Moss.

Something will surely be done to upgrade services on the CLC before too long.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Assuming you mean the route via Hixon?
Before WCML electrification this route carried next to no passenger traffic.
Nearly everything via Stoke (not much) was routed via Stafford and Stone.
My understanding for wiring and upgrading the North Staffs system was because of the salt subsidence between Sandbach and Crewe on the Wilmslow route.
This was very bad in the early 60s (long sections of 20mph) and getting worse.
Also the fastest time between London and Manchester was obtained by running via Hixon and Stoke.
The Harecastle Tunnel diversion was also built for the same reason.
Somehow, they, or nature, fixed the subsidence and Crewe-Sandbach is now 90mph.
It's difficult to believe now, but before wiring several Euston-Manchester trains carried Liverpool portions which were detached at Crewe.
The increased frequency afterwards meant that all trains could be segregated and take the optimum route.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
How much did they pay into the electrification kitty?

Not sure anyone technically has, Northern will have to pay for it over the next couple of decades through higher access fees charged by Network Rail, same way FGW will be doing for Great Western electrification. Though I suppose smaller and less expensive upgrades have been recouped through higher access fees for a single control period. Downside of course from TOCs perspective is they often have to pay increased fees for several years before the work is completed and they can actually get financial benefit.
 
Last edited:

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,320
The December 17 timetable for Chat Moss is set to be:
* 3tph Liverpool to Wigan - 1tph continuing to Preston/Blackpool
* 2tph Liverpool to Yorkshire/North East service via Victoria - alternate services running non-stop between Lime St and Victoria
* 1tph Liverpool to Manchester Airport stopping service.

.

That will effectively be a worsening of capacity between Liverpool & Manchester until Trans Pennine electrification is complete, because what is now a 4 coach 319 will be replaced by a 3 coach 185 with about 100 fewer seats.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,020
Location
St Albans
No I'm comparing one line with one line. The West Coast diversionary route was a key reason for Chat Moss electrification, like it was for Stone.

Where was it explicitly stated? 'Key' does not mean 'only' or even 'main' wrt Chat Moss.

What I'm saying we've seen exponential growth without electrification. Since the introduction of 185s passenger numbers on TPE routes have increased by 100%. Will electrification result in further growth of over 100% over the next 10 years? If not then how can it be claimed electrification sparks growth if growth slows down post-electrification. Had Manchester-York/Blackpool/Windermere been electrified by 2006 would people be claiming the exponential growth is down to electrification?

'Exponential' is your word, I hadn't used it at all. Electrification doesn't have to produce dramatic growth because it is a long term investment unlike repacing diesels in like-for-like schemes. 185s are great stop-gaps because they are so overpowered that the gradients on the Pennine routes can be tackled with ease. They are wasteful compared with electric traction though, plus pollution can no longer be considered insignificant even away from city centres. If there are routing benefits to the Chat Moss electrification, then so much the better. Most rail routes don't exist in a vacuum.

One reason why a civil servant claimed the BCR for replacing Pacers is poor is because the use of old Pacers isn't preventing passenger growth as you might expect. Growth doesn't just happen as a result of electrification. Incidentally Patrick McLoughlin re-confirmed a commitment to withdraw Pacers today, I think the first time it's been mentioned since the election.

'A civil servant claimed' is a bit unofficial, presumably nameless.

That sounds like a David Cameron type statement. Major lines in the North don't include Manchester-Warrington-Liverpool, Manchester-Sheffield, Manchester-Holyhead and Manchester-Cardiff in your opinion?

Patience is a virtue. The major lines in the south with real passenger volumes weren't all electrified in one decade. If the passenger numbers are there, or electrificaztion supported lines that did have them then the budget will be found. I have no allegance to David Cameron, I'm just taking a national view, not a 'support your local railway' stance.

Maybe because DfT wanted a headline Liverpool-Newcastle service in under 3 hours to run via Chat Moss?

Maybe not. Speculation is OK, but I assume from it that you don't actually know.

I never made any such claim. I said electrification and a cascade of 319 (together with the consequences of the 170s going to Chiltern) resulted in some services getting extra capacity when they didn't necessarily need it and other services which desperately need extra capacity not getting anything. Do you think it's better to provide for potential passengers than real passengers?

Yes you are right, you said:
"They (DfT) thought it would help with overcrowding on the CLC line as there would be more Manchester-Liverpool services. However, so far this hasn't proved to be the case...."
So once again, you have written off the case for adjacent lines helping with overcrowding after less than 3 months experience. Electrification is a 50-100 year life investment, so it's a bit daft to expect lightning results, unless this is just a postulation for this thread.
Do you think that it's better to plan ahead or just do firefighting?

If those 130 carriages had been delivered already we wouldn't be worrying about new emission standards for DMUs, no open production line for DMUs suitable for UK use and the problems caused by Chiltern poaching the 170/3s would have been less severe.

1) They weren't delivered but unfortunately the electrification programme hit a few problems, in part caused by unreliable ground conditions along the lines.
2) We are where we are. If they were purchased, we should be worrying about their emissions, not the standards, unless your desire to have new DMUs overrides all considerations of diesel pollution.
3) Chiltern didn't 'poach' the 170s, - it was a commercial deal. They weren't anybody's to poach because they are owned by the ROSCO. The ROSCO probably looked at the state that Northern and their current leased stock was in 3-4 years ago and decided that Chiltern would be a better keeper of theirs over the next few years.

Electrification could still have occurred as a long term solution with the DMUs an immediate solution.

Why do today what we can put off until tomorrow.

At the moment we don't know which lines will get the new trains in the North and we also don't know which lines may get cascaded Turbostars if Northern bidders take up that option, so I don't know if the lines I use most will get new or newer trains.

Wait and see if they actually materialise and in what quantities.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
That will effectively be a worsening of capacity between Liverpool & Manchester until Trans Pennine electrification is complete, because what is now a 4 coach 319 will be replaced by a 3 coach 185 with about 100 fewer seats.

The Victoria 319 carries very little east of Newton le Willows, like the Pacers before it.
Merging it with the Airport service keeps the same 3tph via Chat Moss after the 2nd TPE service is diverted.
DfT has said the 2 TPE services should share the St Helens Jn and Newton le Willows stops, so those two stations will still have a Victoria service.
Then there's the new Chester-Victoria-Leeds service, and where to terminate the Llandudno in Manchester.

On the wider debate on Chat Moss v CLC, the DfT wanted a fast timing between Manchester and Liverpool, and journey time reductions between Leeds and Liverpool.
They already have 32 minutes LIV-MCV with more to come via Stalybridge and with TP wiring.
None of that would be possible via CLC, Oxford Road and Ardwick.
Liverpool-Earlestown was also being upgraded for W12 freight (Olive Mount Curve etc) and combining the projects made a lot of sense.

Wiring Hunts Cross-Old Trafford would only net you 2tph local DMUs.
Wiring Chat Moss will net 3tph DMU, gets you well on the way to Wigan/Blackpool and gives you a "free" Manchester-Scotland electric service and WCML diversionary route.

Manchester-Blackpool was not authorised until later, and has significant planning problems over Phase 1/2 (Farnworth, Chorley, Blackpool, lots of bridges).
There are good reasons why the electrification phasing is as it is.
It's just a pity the TP project is not going on in parallel.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Where was it explicitly stated? 'Key' does not mean 'only' or even 'main' wrt Chat Moss.

I said:

It's a bit like the line through Stone being electrified.

And your response was:

So what you feel about one scheme definitely applies to all others, mmmm.

As you can't be bothered to read my post properly and keep arguing the same invalid point I can't be bothered to read the rest of your latest post. I'll just presume it contains a further number of invalid points.
--- old post above --- --- new post below ---
That will effectively be a worsening of capacity between Liverpool & Manchester until Trans Pennine electrification is complete, because what is now a 4 coach 319 will be replaced by a 3 coach 185 with about 100 fewer seats.

I forgot to add the Liverpool-Warrington Bank Quay service which remains. I also think the new Chester-Leeds service will call at Newton-le-Willows.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,240
'A civil servant claimed' is a bit unofficial, presumably nameless.

The Permanent Secretary's advice to his minister was publicised because the Pacer replacement didn't stack up, and the rules required the S of S to formally override his civil service advice.

The two letters were published on DfT website, and are about as official as you can get, and have been copied verbatim in certain rail magazines, they were mentioned in this forum at the time:

From PS:
https://www.gov.uk/government/uploa...ile/407753/dft-permanent-secretary-to-sos.pdf

From SofS:
https://www.gov.uk/government/uploa...ile/407780/dft-sos-to-permanent-secretary.pdf

However the advice does not explicitly mention passenger growth, as stated by jcollins, that may have come from reading between the lines...
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
However the advice does not explicitly mention passenger growth, as stated by jcollins, that may have come from reading between the lines...

Can't copy and paste from the pdf but it does say there are good reasons why the analysis may underestimate the BCR including reputational impact of Pacers with withdrawal helping to attract new passengers. (Paragraph 2 page 2) Yet he didn't want to presume it would happen when the BCR was calculated.
 
Last edited by a moderator:

AM9

Veteran Member
Joined
13 May 2014
Messages
16,020
Location
St Albans
I said:



And your response was:

As you can't be bothered to read my post properly and keep arguing the same invalid point I can't be bothered to read the rest of your latest post. I'll just presume it contains a further number of invalid points.

Oh dear.
It seems that others with more local knowledge than me also agree that the Stone line wiring was for totally different reasons than those stated by you so the comparison is irrelevant. I bow to their knowledge.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Oh dear.
It seems that others with more local knowledge than me also agree that the Stone line wiring was for totally different reasons than those stated by you so the comparison is irrelevant. I bow to their knowledge.

I'm not arguing with their reasoning for wiring Stone. I'm arguing with your statement:

So what you feel about one scheme definitely applies to all others, mmmm.

I said nothing that could even hint at that and your statement is nothing but complete and utter rubbish. I compared one line to one line and nothing more. If I said there's similarities between Euston to Glasgow services and Kings Cross to Edinburgh services would you conclude that I actually think every service in the UK is similar to Euston to Glasgow?
 
Last edited by a moderator:

LeylandLen

Member
Joined
28 Oct 2013
Messages
779
Location
Leyland Lancs
Just saw a rake of 319s passing through Crewe n/b presumably heading for Allerton.
5Z20 dep Wolverton 1515 eta Allerton 1925. ? Unable to get any numbers , sorry Looked to be 2x 4 units
 
Last edited:

158722

Member
Joined
8 Nov 2009
Messages
831
Just saw a rake of 319s passing through Crewe n/b presumably heading for Allerton.
5Z20 dep Wolverton 1515 eta Allerton 1925. ? Unable to get any numbers , sorry Looked to be 2x 4 units

319374 & 319383 would be the obvious pair, based on arrival dates.
--- old post above --- --- new post below ---
Just saw a rake of 319s passing through Crewe n/b presumably heading for Allerton.
5Z20 dep Wolverton 1515 eta Allerton 1925. ? Unable to get any numbers , sorry Looked to be 2x 4 units

319374 reported on this, no second unit with it however.
 
Last edited:

CJ

Member
Joined
18 May 2009
Messages
214
Location
Stockport
Thought i'd do a count on the number of 319/3s that are now currently with Northern [as of 7th June 2015]:

  • 319361*, 319362*, 319363*, 319364*, 319365*, 319366^, 319367*, 319368*, 319369*
  • 319371*, 319374*, 319379^
  • 319380*, 319382*, 319386*
Total: 15
* = refurbished into new Northern Electrics livery.
^ = (un)refurbished and still in First Capital Connect livery [these are reported to be used for driver training purposes].
----

Here are the rest of the 319/3s [as of 7th June 2015]:

  • 319370^, 319372*, 319373*, 319375^, 319376^, 319377^, 319378^
  • 319381^, 319383^, 319384^, 319385^
Total: 11
* = refurbished into new Thameslink livery.
^ = (un)refurbished and still in First Capital Connect livery.

----

I'm unsure out of the remaining 9 unrefurbished which ones are currently at Wolverton and which ones are staying with Thameslink/going to Northern.
 
Joined
8 Dec 2007
Messages
476
I'm unsure out of the remaining 9 unrefurbished which ones are currently at Wolverton and which ones are staying with Thameslink/going to Northern.

My research and details have these additional 4 to remain at Thameslink:
319370, 381, 384, 385.

At Wolverton [for Northern] are:
319375 and 319376 - arrived 6th May.
319377 and 319378 - arrived 25th May.
319383 - arrived 6th April [and due out soon].

This is open to correction by anyone who might know more.
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,810
Location
Liverpool, UK
My research and details have these additional 4 to remain at Thameslink:
319370, 381, 384, 385.

At Wolverton [for Northern] are:
319375 and 319376 - arrived 6th May.
319377 and 319378 - arrived 25th May.
319383 - arrived 6th April [and due out soon].

This is open to correction by anyone who might know more.

Reports state that 319372 has been repainted into Thameslink livery.
 

158722

Member
Joined
8 Nov 2009
Messages
831
As well as 319373, which has been detailed by CJ.

Has it been decided which units are to be transferred to LM?

319013, 216, 429 & 460 have been quoted elsewhere for LM.

319220 was due out from Wolverton, but not seen any info on whether it did run and indeed, what colour it has emerged in.

370, 372, 373, 381, 384, 385 are the six staying with TSGN for now.
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,493
Location
DTOS A or B
220 is at cauldwell in the new grey tsgn livery, still has high back seats. Didnt see whats they did with the toilets.
 