I figured this needed its own thread.
There's hardly much distance under wires covered as part of most diagrams up there, just the Newcastle - Morpeth part of the Morpeth - Carlisle and the few per day direct Darlington - Newcastle via Durham.
Buxton has been shown on Stakeholder Presentations for the first 8 4 car Battery units, which I think is perfect for them, plenty of time under the wires between Hazel Grove and Manchester (especially on the diagrams that do a mini-trip to Hazel Grove before going to Buxton). It looks like there are about 5 Buxton diagrams (hard to figure out with the peak time strengthening, which wouldn't be needed with fixed length 4 cars).
I think Windermere (and by extension Barrow[1]) are pretty clear contenders for Multi-Mode units, Windermere - Manchester Airport is 92 miles, only 10 of which don't have wires[2], and Barrow is 69 of 98 miles Electrified), which would free up 195s to cascade 158s (e.g. Wigan - Leeds) onto 150/156 diagrams to go to scrap.
The Southport services are prime for multi-mode trains, it already has them (they just need to not break down every day), I could easily see a 1 for 1 replacement of 769 by MMU (if they last into the 2030s)
In addition I think Sheffield-Leeds via Wakefield Westgate, with wires until Fitzwilliam / South Kirkby Junction (20 miles of 39 electrified) is in for a shot, but I think that depends on platform capacity issues at Leeds being dealt with so longer trains can be used.
[1] Future of this service probably depends on how the Whitehaven tunnel gets dealt with, that already has its own speculative thread.
[2] They shuttle back and forth to Oxenholme for 2 hours before going back, but they've got diesel engines if the battery drops too low and can top it up at Oxenholme if 60 miles without a charge is too far.
Anyone else got any ideas for good contenders for early replacement with multi-mode trains?
Why would the North East need the MMU's quite early on?They have said new trains would arrive in the North East by 2030/31.Will the North East get more 158s or the new MMUs?
That’s an email I got back from them with regards this question in May.
There's hardly much distance under wires covered as part of most diagrams up there, just the Newcastle - Morpeth part of the Morpeth - Carlisle and the few per day direct Darlington - Newcastle via Durham.
Buxton has been shown on Stakeholder Presentations for the first 8 4 car Battery units, which I think is perfect for them, plenty of time under the wires between Hazel Grove and Manchester (especially on the diagrams that do a mini-trip to Hazel Grove before going to Buxton). It looks like there are about 5 Buxton diagrams (hard to figure out with the peak time strengthening, which wouldn't be needed with fixed length 4 cars).
I think Windermere (and by extension Barrow[1]) are pretty clear contenders for Multi-Mode units, Windermere - Manchester Airport is 92 miles, only 10 of which don't have wires[2], and Barrow is 69 of 98 miles Electrified), which would free up 195s to cascade 158s (e.g. Wigan - Leeds) onto 150/156 diagrams to go to scrap.
The Southport services are prime for multi-mode trains, it already has them (they just need to not break down every day), I could easily see a 1 for 1 replacement of 769 by MMU (if they last into the 2030s)
In addition I think Sheffield-Leeds via Wakefield Westgate, with wires until Fitzwilliam / South Kirkby Junction (20 miles of 39 electrified) is in for a shot, but I think that depends on platform capacity issues at Leeds being dealt with so longer trains can be used.
[1] Future of this service probably depends on how the Whitehaven tunnel gets dealt with, that already has its own speculative thread.
[2] They shuttle back and forth to Oxenholme for 2 hours before going back, but they've got diesel engines if the battery drops too low and can top it up at Oxenholme if 60 miles without a charge is too far.
Anyone else got any ideas for good contenders for early replacement with multi-mode trains?