But we've never interworked a heavy rail with a metro service, actually no Tyne and Wear tried with 2 services per hour and a full compliment of metro services and guess what happened shortly after, one of the heavy rail services per hour got kicked off the line as Metro couldn't keep to timings. There is no point putting a light rail service up there, it should be heavy rail or kept as DMU. It should be electrified just as much as Stalybridge but Stalybridge isnt likely to be done either. It is only a 10 mile (if that) extension of the wires to facilitate through services to keep Victoria clear barely a complex or expensive task. It would not be a hpurly or half hourly limb Rochdale to Manchester would remain at 4tph but go to 2 EMU, 2 DMU which would be the same service level at least as any Stalybridge - Manchester Vic service
Am surprised no-one else is mentioning electrifying through Victoria to Ashbrys. Where it wouldn't be difficult to add two more platforms on the freight line to vic and open this up to passenger usage, for both pushing services through vic, it would keep them on the correct side of the lines, rather than running to stalybridge from chat moss. This would also provide diversion opportunities away from Piccadilly for the 'East Manchester' lines, should there be problems, track work, or work for putting in HS2 platforms on the NE of Picc...
4Track to guide bridge anyone?
I think the idea of electrifying to Stalybridge (and my poo pooed idea of Rochdale) is strong enough as it frees up space in Manchester Victoria. There currently are no westbound bays even though some are planned, there still won't be as many as say Leeds and Manchester Piccadilly and it makes sense especially on what can very busy lines at times to run some services crsoo-city
Well I have enjoyed reading the comments over the last few days and I do agree that re-instating the 4 tracks between Ashburys and Guide Bridge would be very helpful. When I used to work at Guide Bridge in the early 70's all 4 platforms were in use, pkus a real Stcokport to Stalybridge service exsisted. Also al 4 tracks were wire up for overhead lines, admitedly on the old Woodhead 750v DC system.
If the 4 tracks were re-instated and wired up with the Miles Platting to Ashburys link as well, then you will have a good alternate route into Manchester. Also if they ever electrify the south east Manchester lines, (ex Sheffield & Midland line) then an alternate destination would be available at Victoriam if Piccadilly was congested.
Regarding the comments over the suggested electrification through to Rochdale, I feel that is makes sense. If you then combine it with the Manchester to Southport services, via Bolton or Atherton & Wigan, and those lines where also electrified, then you would have a very good through Victoria service, freeing up platforms at Victoria. Which are in short supply since they messed it up with the Metrolink and MEN Arena works.
Sometimes when I have been travelling back from Victoria to Bolton, I have arrived on the right platform and have a choice of 3 trains on that platform, with no one to ask which trian is for where, or any notices, or signage to help you. I often have to wait to see the driver get in and then ask them where the train is going to get on the right one. It can be very annoying, especially when you are told you are on the Bolton train and it pulls out the wrong way and you end up going to Rochdale, which happened to me once.
I do worry that any other developments will cull a Stockport to Stalybridge. Don't forget that any service will have to cross upto four tracks and many services to both stop and then proceed. A very wasteful operation. I would have to get the whole range of options looked at to serve the areas looking at rail, bus, tram, tram-train. However, there is an option. When the line towards Ashton Moss North Junction goes under the M60, I would suggest bringing it left so it goes parallel to the M60 and then joins the line at Ashton Moss North Junction but facing Stalybridge. This offers direct services but without the damage to paths that going through Guide Bridge could bring.
Well I have two comments about this. First at this time there is NO Stockport Stalybridge service, apart from one train each Saturday. There is no service in the other direction AT ALL. Plus although there are trains through Guide Bridge to Stalybridge, as far as I am aware none actually stop at Guide Bridge. This means that all passengers from the South East Manchester area (the Hadfield, Marple, Hyde and New Mills passengers) all have to trabel through Guide Bridge into Piccadilly, then travel all the way back again through Guide Bridge, to get to West Yorkshire. How daft is that. By having a link from Stockport, through Guide Bridge to Stalybridge, it would not only give a time saving to them, there might also be a financial benefit.
Secondly, during the 70's when I used to work at Guide Bridge, there was an hourly service each way between Stockport & Stalybridge, I know I used it. That also crossed four tracks at Guide Bridge, while there was a greater freight traffic, Woodhead was still open then, with no difficulty that I observered. All that is needed is good timetable planning.
A simple way of solving this problem, is to stop all Trans Pennine services at Guide Bridge, cut back the Stockport service to Guide Bridge. Looking at Google Earth recently, the space were the two sourtherly platforms were taken out (one is the southern face of the old island platform) is clear and therefore both the tracks and platforms could be replaced. Not as long as they used to be, and these could now be used for all local services to Hadfield, Rose Hill and New Mills. The space where the old station buildings were, now they have been demolished could be used to put a bay platform in for reversing a Guide Bridge to Stockport service. This would eliminate any crossing of the reinstated four track line, plus it is possible for the line to not impinge upon the four tracks at all, although a connection would be beneficial.
Just a few ideas for your consideration.
"Pedant mode on."
I believe the one train a week is early Friday morning.
"Pedant mode off"
That's something I've never understood. Surely trains/ staff are at a premium on weekdays - what does the unit/staff do the rest of the week?
If it was a weekly service that I had to run, I'd tag it on to another duty on a Saturday or Sunday, first thing or last thing, rather than 09.22 - 09.49 on a Friday...
Odd.
It used to be a Saturday. A group of enthusiasts adopted it and started using it regularly. So, to prevent the service appearing to be used and therefore "needed", they changed days!!
It used to be a Saturday. A group of enthusiasts adopted it and started using it regularly. So, to prevent the service appearing to be used and therefore "needed", they changed days!!
Surely, by that logic, it was a profitable service?
Look at it this way: The line directly connects two quite busy areas of the Manchester suburbs with good long distance and local services from each end.
As things stand, people have to travel via Manchester in order to connect between one lot of these services and the other.
A regular direct link as opposed to one train a week in one direction only would surely be much better used than the previous service was before it got chopped back to Parliamentary status?
It would also reduce congestion slightly in central Manchester.
They would have nothing to lose by at least trying it as an experimental service for 12 months would they? ( Assuming they could get the diagramming done with the present rolling stock situation, of course ).
If I was going to divert a service along that route, I would suggest the Chester - Knutsford - Piccadilly one might be ideal for one per hour - send it to Stalybridge instead
I think regional, TPE-style services would do better than local ones
I can see the logic, but the trouble is you'd need to cross every line at Stockport to get from the Altricham one to the Stalybridge one, which could cause some potential for delays on other services.
The advantage of a stand alone 153 shuttle is that it could work independently of existing services, so avoid tinkering.
Well I have two comments about this. First at this time there is NO Stockport Stalybridge service, apart from one train each Saturday. There is no service in the other direction AT ALL. Plus although there are trains through Guide Bridge to Stalybridge, as far as I am aware none actually stop at Guide Bridge. This means that all passengers from the South East Manchester area (the Hadfield, Marple, Hyde and New Mills passengers) all have to trabel through Guide Bridge into Piccadilly, then travel all the way back again through Guide Bridge, to get to West Yorkshire. How daft is that. By having a link from Stockport, through Guide Bridge to Stalybridge, it would not only give a time saving to them, there might also be a financial benefit.
Secondly, during the 70's when I used to work at Guide Bridge, there was an hourly service each way between Stockport & Stalybridge, I know I used it. That also crossed four tracks at Guide Bridge, while there was a greater freight traffic, Woodhead was still open then, with no difficulty that I observered. All that is needed is good timetable planning.
A simple way of solving this problem, is to stop all Trans Pennine services at Guide Bridge, cut back the Stockport service to Guide Bridge. Looking at Google Earth recently, the space were the two sourtherly platforms were taken out (one is the southern face of the old island platform) is clear and therefore both the tracks and platforms could be replaced. Not as long as they used to be, and these could now be used for all local services to Hadfield, Rose Hill and New Mills. The space where the old station buildings were, now they have been demolished could be used to put a bay platform in for reversing a Guide Bridge to Stockport service. This would eliminate any crossing of the reinstated four track line, plus it is possible for the line to not impinge upon the four tracks at all, although a connection would be beneficial.
Just a few ideas for your consideration.
That's something I've never understood. Surely trains/ staff are at a premium on weekdays - what does the unit/staff do the rest of the week?
If it was a weekly service that I had to run, I'd tag it on to another duty on a Saturday or Sunday, first thing or last thing, rather than 09.22 - 09.49 on a Friday...
Odd.
The problem I have is that the Stockport - Guide Bridge line covers a big passenger flow, it would be even bigger if pepole got off their arsed and built a Heald Green Jcns - Cheadle Hume line (services to Manc Airport able to avoid Manc). Just how much re-moddeling round Levensume and Heaton Chappel would be needed to move some platforms round, then sending stuff up to Guide Bridge wouldn't have to cross 4 tracks, could just diverge off the fast lines and that would be the end of it, would also put everything in the right place for when the busy 2 track from Heald Green crashes into a very busy 4 track from Stockport, that IMO should be 6 track through Longsight as a priority, with re-opening Mayfeild and a 10track station throught but thats for a different thread. But me plans for that wouldn't need much extra viaduct, just to steal some sidings through Longsight, would need more viaduct after Ardwick to preserve 2 tracks for the E lines, would be combined with a flyover between the Guide Bridge Lines to land between the Through Lines and Mayfeild Lines. Approaching Picc in this order Left to Right.
Airport Lines feed directly into Mayfeild and diverge for the through platforms.
Slow Lines feed into Platforms 9 - 12, easy access to 5 - 9, diverge to meet airport lines to access through platforms
Fast Lines as is feeding directly into 5 - 9, easy access to 1 - 4 and 9 - 12
East Lines as is, proberbly needing to be slew onto a new section of viaduct in part before paving over the car park and having 3 shiney new platforms in the Car Park (Extend the multi-story to compensate), and this isn't stealing potential HS2 space, that would have to pave over the Mayfeild Insustrial space to the south of mayfeild, on a viaduct over the A635, of course leaving space for a GSJ for a new road from the A635 to meet up with the M67 (ie. finish the M602). I'd also be directly connecting it to Victoria via Phillips Park, no services would terminate from the West into Victoria, all would run through to terminate at Piccadilly's East Platforms, hence the extra 3.
With HS2 and all potential platforms that would make Piccadilly slightly larger.
Start with 14
+3 platforms on the east
+2 platforms (15 & 16)
+4 platforms in Mayfeild
+ up to 10 platforms on HS2
33 Platforms for Manchester Piccadilly? anyone? Confuse the hell out of everyone by badly numbering them![]()
Could it be used for long distance trains? I know there are some open access ideas but they sound pie in the sky, due to needing diesel but then also tilt to keep time and be allowed on the fast lines out of Euston.
But regional - for example: Birmingham NS to Leeds, calling at Wolverhampton, Crewe, Stockport, Stalybridge, Huddersfield and Leeds.
How would that journey time compare with the current route via Derby, which is a flat 2 hours?
I've seen BHM to Stockport at 1h16. Stalybridge - Leeds is 43mins. And then God knows what Stockport to Stalybridge would be at linespeed, non-stop, 10 mins? So with the TPE improvements, this could be 2 hours too.
It could help speed up Birmingham - Manc trains by taking some stops off, and surely linking Hudds/Leeds and Crewe would open up a lot of journeys and connections. You could run it to York too.
Make it regular and you lose the Enthusiast market, since there'll be no "novelty" any more...
To be realistic, if the 27 minute journey time could allow an hourly service with one unit, then I'd suggest a half hourly service with 153s timed to connect with TPE services from Yorkshire at Staleybridge. That ought to be often enough to encourage people to avoid central Manchester.
However, I can't see one unit managing it hourly, I can't see two units being freed up and I can't see anything less frequent being that attractive to passengers. For anything less frequent I'd suggest the only way for the line to pay would be for longer distance services to go via the line (since people would be reluctant to change onto an infrequent service).
It shouldn't be too difficult to build in a suitable pathing allowance to the Chester - Stalybridge and use the extensive pointwork arrangements just outside Stockport in a form of dynamic looping to avoid delaying main line services though should it? ( Or have they reduced it all to a simple ladder crossing these days? )
True, but then we are back to trying to source additional rolling stock aren't we? Plus, I suspect a shuttle may not attract as many people to use it as a through service would.
Thinking about this a little but with sensible small improvements what would be the journey time for Stalybridge -> Stockport -> Wilmslow -> Manchester Airport?
Nothing wrong with suggesting additional rolling stock. Many of the ideas floated are going to struggle to see the next Control Period, never mind this one. Whilst PPM's are not popular, and anything that uses some form of tarmac despised, they should not be dismissed because they go against the grain of what you usually associate with Heavy Rail.
Difficult at Wilmslow. It'd involve running south out of the station, stopping on the main line, then reversing back north to gain the Styal line for the airport.
It's an idea but it depends on which provides the best connectivity for passengers. Would Stalybridge win because of its current connections to Man Vic? Would Guide Bridge be popular as a stop with up to two minutes added to trains stopping there? Could TPE's alternate with some stopping at Stalybridge or Guide Bridge?
.
I don't think Chester / Northwich line passengers would be impressed with that idea. They were not pleased when services were diverted via Stockport (with increased journey time) when Altrincham - Manchester was converted to Metrolink.I agree it would need to be half hourly, and it would also need to have a decent start and finish time as well.
If I was going to divert a service along that route, I would suggest the Chester - Knutsford - Piccadilly one might be ideal for one per hour - send it to Stalybridge instead; for the other per hour I wonder about running Rose Hill Marple to Stockport instead of Piccadilly?
Avoids messing around with the long distance pattern and provides direct local links for Denton and Reddish South - which is essential if one is to develop the local market.
.