Could make Blaenau Ffestiniog more of an isolated operation?
Rebecca Maxwell, of NWEAB, said the electrification sum could be even less and was a small amount to pay for the potential economic benefits for the region and the whole of Wales
I can't see the north Wales coast line being electrified instead of a south Newport M4 being built. The situation on the Newport section of the M4 is now quite 'desperate' with frequent queues building up for many miles - thus making the whole of south Wales less desirable for investment.
Whilst I would like to see the north Wales Main Line go electric, it must surely be a lower priority than the M4 in south east Wales
Agreed.
I think that Rebecca Maxwell is overegging "the potential economic benefits for ...
the whole of Wales" - I suspect that the M4 relief would be of more benefit to people in the north than electrification to Holyhead will be to people in the south.
I get annoyed when people come up with these kind of "x would be cheaper than y" comparisons though - as if the two are in direct competition and with the aim of solving the same problem. Much like the "a line to Upper Ambridge would be cheaper than HS2" kind of arguments.
I suspect a lot will depend on how much of what was supposed to be done in CP5 ends up being done in CP6. Right now I'd have to say CP6 is going to be filled up with over-running or pushed back CP5 work.
Agreed - I think we're going to have a dose of de ja vu when the CP6 announcements are made, with promises of doing various schemes that should already have been up and running. Ambitions beyond that are limited!
It's complicated - there's a very strong, unavoidable business case for Crewe to Chester electrification, but it destroys an already terrible business case for the entire route to Holyhead being wired.
The business case can be made 'less bad' but it needs additional trains to run, problem is there's probably not the demand for more trains.
The last figures I've looked at have Crewe to Holyhead BCR at 0.55:1, but Chester is anything from 4:1 to 6:1 depending on a few additional miles, overlap/run off protections and other bits and pieces needing done at the same time
Interesting to get this kind of information from an "insider".
Every time the Crewe - Chester line gets mentioned, someone brings up the cost of dealing with all the low bridges (and how it'd be cheaper to just build a brand new line, than try to upgrade the existing one), so good to see someone in the know state that the business case looks rather decent.
Given that, rather that Carwyn Jones' "it could be done in the next 5 years" fantasy, do it once the already planned NWCL resignalling is completed. This electrification isn't suddenly going to leap higher up the list than the SWML and Valleys projects, neither of which have particularly firm end dates at the moment.
True.
Easier to excite people with promises of more schemes than deal with the nuts and bolts of funding/ delivering schemes already promised?
Officially the WG still want an hourly service from north wales to Cardiff which will have to be DMU operated. It doesn't help to make the business case to wire west of Chester does it?
True.
If we assume that the current frequency along the coast of two to three trains an hour continues (currently hourly from Manchester, bi-hourly from Birmingham, bi-hourly from Cardiff, not quite every couple of hours from London but with a distinct "flow") then roughly only half the services would be converted to EMU.
Would Cardiff Bay accept a reduced service on their flagship line (to justify the electrification), or prefer an hourly Cardiff service along the coast (even if it scuppers the case for wiring)?
Wish Bob were here to debate this!
Could the order for 100 new trains for the North be hybrid as there will be lots of partly under-the-wires services and moreso as electrification progresses?
120 carriages, so roughly thirty or forty
trains, as far as I understand it?