70014IronDuke
Established Member
- Joined
- 13 Jun 2015
- Messages
- 4,068
Interesting that two x ageing 4-4-0s (and two footplage crew) were seen as more suitable than one LN - one wonders if the crews, reluctant to lose a regular piloted turn, had something to do with this. "Very difficult keeping time with the one locomotive, guv, honest."I have unearthed my copy of that wonderful book Train Ferries of Western Europe by Patrick Ransome-Wallis (Ian Allan, 1968); it is pure chance that I found it today after it had been missing for fifteen months. Before the war it had been intended to use Lord Nelsons, but as they had little in reserve two 4-4-0 were used, usually an L and an L1, via Tonbridge. Post-war a Merchant Navy or a Light Pacific was used, the latter usually piloted by an L1. From June 1959 an electric was used and the train ran via Canterbury and Chatham. Pre-war it was 96 minutes down and 100 up for 400 tons via Tonbridge. The electric took 89 1/2 down and 110 up via Chatham, but with 850 tons.
Interesting too that while a single MN could manage, the light pacific needed a pilot. I'd have thought the original MNs would be just as prone to slipping as an unrebuilt light pacific. IT also begs the question, why didn't they allocate an MN once rebuilt to do the job?
Were Stewarts Lane Brits ever put on the job in the 50s? Does the book mention these? I suspect they would have been less prone to slipping than the original Bulleids.



