• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Next exciting reopening

Status
Not open for further replies.

Clayton

On Moderation
Joined
15 Apr 2018
Messages
259
We’ve had the Borders, which will be next exciting reopening? Ideally through miles of exotic countryside. I know a lot of people here are against them but it’s good fun to hope!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Train Maniac

Member
Joined
28 Sep 2018
Messages
466
Bicester to Bedford (East West Rail) with construction starting in December
Bristol to Portishead is as good as confirmed
All year round services from Okehampton to Exeter (Not entirely sure if still definitely happening or not)
 

Clayton

On Moderation
Joined
15 Apr 2018
Messages
259
Bicester to Bedford (East West Rail) with construction starting in December
Bristol to Portishead is as good as confirmed
All year round services from Okehampton to Exeter (Not entirely sure if still definitely happening or not)
EWR and Okehampton would probably do me! A lot more than we hoped for 20 years back.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,310
Location
Yorks
HS2 doesn't excite me that much because it won't take me anywhere I can't already go.

Now if they re-opened the lines to Fowey or Padstow, that would be very exciting as I have to get the bus currently. Keswick would be another one in a similar vein, or any of the South coast branches (Lyme Regis, Seaton, Swanage etc).
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,276
Location
East Midlands
I've learnt that it's not time to get excited about any re-opening until all** the contracts are awarded and the work is underway.

**Even though some contracts have been awarded and £billions spent it still looks highly likely HS2 will be cancelled, the relevant 'noises' are getting louder all the time and political situation looks very bad for this project.
 

AndyW33

Member
Joined
12 Aug 2013
Messages
541
HS2 doesn't excite me that much because it won't take me anywhere I can't already go.

Now if they re-opened the lines to Fowey or Padstow, that would be very exciting as I have to get the bus currently. Keswick would be another one in a similar vein, or any of the South coast branches (Lyme Regis, Seaton, Swanage etc).
Swanage is already open, of course, with mainline connection.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,035
HS2 doesn't excite me that much because it won't take me anywhere I can't already go.

Now if they re-opened the lines to Fowey or Padstow, that would be very exciting as I have to get the bus currently. Keswick would be another one in a similar vein, or any of the South coast branches (Lyme Regis, Seaton, Swanage etc).

There's an argument that by building HS2 (especially with the talk of the UK being carbon neutral by 2050) that the case for more reopenings goes up as more people use rail for long distance travel and so rail becomes accepted as a more acceptable mode of travel for people to use.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,310
Location
Yorks
There's an argument that by building HS2 (especially with the talk of the UK being carbon neutral by 2050) that the case for more reopenings goes up as more people use rail for long distance travel and so rail becomes accepted as a more acceptable mode of travel for people to use.

Well, it would be a nice thought.

However, the much commented on doubling of passengers in recent years hasn't achieved much in that respect.
 

DPWH

Member
Joined
8 Sep 2016
Messages
244
Reopenings, and new lines are indeed "exciting" as the OP says.

If you read railfuture website, they are a membership organisation, pushing for lots of reopenings.

What strikes me is if you read Network Rail RUS however you see that professional rail engineers are focused more on getting more efficiency from the existing network rather than extending it. It already goes most places it needs to go. And Network Rail have a pretty good idea of what needs to be done to do that, and in which order. Things like extra tracks, electrification, station remodelling, resignalling, and fly-overs. Lower than expected funding could set these projects back, but they'd still basically be done in the same order.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,035
Well, it would be a nice thought.

However, the much commented on doubling of passengers in recent years hasn't achieved much in that respect.

That's possibly down to needing to catch up on past investment & trying to keep pace with growth.

You also have to remember that it wasn't that long ago that things like zero growth franchises or back a bit further the thought of managed decline were part of the perception of the government for the railways. That's quite a massive cultural shift to where we are with HS2, East West Rail, Trans Pennies Upgrade, Northern Powerhouse Rail, etc.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,310
Location
Yorks
That's possibly down to needing to catch up on past investment & trying to keep pace with growth.

You also have to remember that it wasn't that long ago that things like zero growth franchises or back a bit further the thought of managed decline were part of the perception of the government for the railways. That's quite a massive cultural shift to where we are with HS2, East West Rail, Trans Pennies Upgrade, Northern Powerhouse Rail, etc.

And yet, the pace of reopenings remains glacial. Governnments are keen on providing warm words about such things, but rarely cough up the cash. I don't see HS2 making a ha'porth of difference to this situation.

Maybe HS2 will lead to a slew of reopenings. I'll believe it when I see it.
 

TBY-Paul

Member
Joined
9 Feb 2013
Messages
340
One that would make a significant difference to the rail network, both as National and Local Route, is the Leamside line, even Network Rail and the Regional Authority recognise the need to do it.
 

Rob F

Member
Joined
17 Dec 2015
Messages
453
Location
Notts
It’s green already - lots of trees - and will stay that way.
It must be lovely to be so certain of everything and be able to see into the future with such crystal clear clarity.

I hope you are wrong.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,672
And I'm still hoping to collect one day !

Well the bet was over 8 years ago with SELRAP, and for me to pay out needed the line open for traffic before 2030, so there’s 10 years, 6 months and 17 days to go. Not that I’m counting ;)

(In any event, they didn’t take me up on it)
 
Status
Not open for further replies.

Top