ayrshire_voyager
Member
- Joined
- 16 Nov 2009
- Messages
- 74
First day back at work for 1000's and signal failure meltdown at Glasgow, trains cancelled at a whim. Seems the engineering work done over Xmas isnt up to scratch, or is it a coincidence ?
Surely yesterday was the first day back for 1000's or was the route not open yesterday?
In anycase, after a tripping the surge protection failed causing extensive damage to signalling components....so yes, a coincidence.
apologies it should be on a whim![]()
Scotland certainly endured some of the worst of the weather