Bletchleyite
Veteran Member
I'd expect 23m.
I'm curious to know whether a train comprising five loco hauled carriages will offer less capacity than a doubled up class 185. I'm also wondering whether TPE have chosen to operate sets of five carriages because they feel that it sufficiently satisfy demand or whether that is the limit for a class 68 crossing the Pennines.
...the new carriages will initially operated T&T.![]()
I'm curious to know whether a train comprising five loco hauled carriages will offer less capacity than a doubled up class 185. I'm also wondering whether TPE have chosen to operate sets of five carriages because they feel that it sufficiently satisfy demand or whether that is the limit for a class 68 crossing the Pennines.
All this speculation yet nothing has been revealed internally....
23m minimises the amount of platforming lengths to just Yarm, if we go for 26m then Warrington, Liverpool parkway, seamer, Chester le street and possibly st helens will all need lengthening as will Newcastle also need some rethinking over it's platform use
23m minimises the amount of platforming lengths to just Yarm, if we go for 26m then Warrington, Liverpool parkway, seamer, Chester le street and possibly st helens will all need lengthening as will Newcastle also need some rethinking over it's platform use
TPE will no longer be serving Warrington Central or Liverpool South Parkway by the time these trains are delivered - both Liverpool services will be on the Chat Moss line.All this speculation yet nothing has been revealed internally....
23m minimises the amount of platforming lengths to just Yarm, if we go for 26m then Warrington, Liverpool parkway, seamer, Chester le street and possibly st helens will all need lengthening as will Newcastle also need some rethinking over it's platform use
TPE will no longer be serving Warrington Central or Liverpool South Parkway by the time these trains are delivered - both Liverpool services will be on the Chat Moss line.
But diversions will be non-stop surely, so platform lengths will not matter?Every likelihood of the CLC remaining a diversionary route when the Chat Moss is closed, as happens at the moment (although usually it is the other way round).
All this speculation yet nothing has been revealed internally....
23m minimises the amount of platforming lengths to just Yarm, if we go for 26m then Warrington, Liverpool parkway, seamer, Chester le street and possibly st helens will all need lengthening as will Newcastle also need some rethinking over it's platform use
1) You can't have through passenger access on a train longer than the basic unit (like current Voyagers on Anglo Scottish services: extra costs of manning 2 shops, no hot food in one of the units, no comprehensive ticket inspections without double-manning each job).Why? What's wrong with an electric-hauled LHCS set that will be internally exactly the same as one of the EMUs except for having a locomotive on one end?
A gentle reminder.
Can we please stay on topic, there are a number of threads available covering a number of related topics which have taken this thread away from its purpose.
Can I ask that we make use of those and stay on topic!
Thanks
Info coming from elsewhere is saying the driving trailers will be built last and the new carriages will initially operated T&T.Whether that will be as a 4 car train or using a coach from another set is not indicated.
I'd expect 23m.
In terms of the cost of fuel and I'm guessing track access charges that would be sheer lunacy. Not to mention loco availability as you would obviously need two loco's per train.
But diversions will be non-stop surely, so platform lengths will not matter?
Platform lengthening's had been announced as part of the franchise so I would expect at least Chester le St and Yarm to be tackled. Malton would also need another rebuild as would seamer. There are no doubt others.
Currently CLC trains diverted via the moss stop at NLW vice WAC with buses linking the two. There's also the link via WBQ to Chester as a connection. No reason why chat moss diversions via CLC won't use WAC...
Second Spanish rolling stock win confirmed
NEW trains for Transpennine Express are to be built by the Spanish firm of CAF, after no bids were received from a manufacturer with a British base.
TPE said the deal was 'great news', but the RMT said the decision to choose a Spanish builder was a 'sad indictment' of the railways.
The order for two new fleets is the second to be made by FirstGroup for Transpennine Express. It has already signed a contract for 19 five-car trains, to be supplied by Hitachi.
The latest deal completes First's rolling stock commitments on Transpennine and involves two more fleets, consisting of 12 five-car Civity UK intercity electric trains financed by Eversholt Rail and 13 five-car intercity trains financed by Beacon Rail Leasing.
The contracts are a second recent British win for CAF, which is already providing new trains for Northern. The firm has also built the new fleet of trams for Midland Metro in Birmingham.
Transpennine Express said the new fleets will provide an extra 13 million seats a year -- enough to fill Old Trafford stadium more than 150 times.
In total, 44 new trains are now set to come into service on Transpennine Express by 2019.
TPE managing director, Leo Goodwin said: “This is great news for our customers and we are delighted to have concluded the deals that will bring much needed and much wanted extra carriages across our network.
“This will enable us to transform the customer experience over the life of our franchise and our three new train fleets will form a key part of this improvement.
“Whether travelling to work, for business or leisure, our services are going to offer more seats, improved connectivity and a higher standard of comfort. The on-board experience will be second to none and we will provide customers with a real alternative to the car and congested road network.”
The news of the latest orders received an unenthusiastic reception from the RMT. The union's general secretary Mick Cash said: "It is a sad indictment of our railways that, at a time when our steel-making and manufacturing industries are in crisis, these new trains are not being built here in Britain.
"With the pressures on our railways, and the constant demand for extra capacity, the Government should embark on some joined up thinking and make serious efforts to use these opportunities to protect UK steel making and our manufacturing base."
Did Bombardier even bid for these? This is why I utterly despite the unions in this country. This has nothing to do with workplace issues and everything to do with political grand standing.
According to TPE no manufacturer with a British production line was interested in building the new EMUs. While for Northern Bombardier offered a new EMU but not a new DMU or DEMU, meaning the only manufacturers to offer both types of trains which Northern needed were CAF and Stadler.
Also have the RMT realised that Bombardier Derby build aluminium trains not steel trains?
Looks like the RMT found something to complain about as usual....This is why I utterly despite the unions in this country. This has nothing to do with workplace issues and everything to do with political grand standing.
The unions are an example of how to turn any story into an agenda piece. No matter how good. I am sure they will complain when Hitachi wins work for Europe and builds them here.
The point is valid. 1000's of steel workers are at risk of being sacked yet we cant use some of their product to make trains in our own country.
1000's of steel workers are at risk of being sacked yet we cant use some of their product to make trains in our own country.