WatcherZero
Established Member
- Joined
- 25 Feb 2010
- Messages
- 10,272
Im starting to think First are playing a game of chicken, holding off two bidders as long as possible in the hope that one will cave in to pressure and offer a lower price. They would have had to include quotes as part of their bid so the only reason for a delay is if their quibbling over specification/delivery dates or trying to force a better deal than their original quotes from the manufacturers.
Last edited:
