Network Rail has announced the installation of 38 new toilets at London Bridge station:
We are carrying out a £4.8m project at London Bridge station to add a further 38 toilets to improve the experience for all passengers.
It’s unclear what side of the gatelines these are, but regardless I’m left questioning how they are managing to spend £4.8 million on this project? Commercial toilet installations for around 10 toilets is normally in the high tens of thousands or just into the hundreds of thousands. I struggle to see so much more is being spent on this.We are installing more toilets to meet passenger demand.
The new toilet facilities will be a mixture of female units (23 including ambulant, family accessible and standard), male units (12 including standard, accessible, ambulant) and 3 unisex toilets: accessible, accessible with baby change and gender neutral.
The new toilets use state of the art technology to reduce cost, CO2e emissions and water consumption.