ASharpe
Member
I would argue the definitive source is the routing guide and related documents.
I'm happy to go with whatever looks the most favourable to me at the time.
I would argue the definitive source is the routing guide and related documents.
Not sure if this has been mentioned, but I have noticed a few customers coming through Croydon with the new format tickets, looks as if some TVMs on London Overground have been updated.
For the benefit of those with KnowledgeBase access, the brief mentioned upthread can be found in the "Ticket Stock and Literature" section.
Was quite impressed to see the new ticket design has finally been mentioned in this month's Rail News paper. They seemed to be talking about it like it was some kind of new thing...
It was also disappointing to note that if an Advance fare had more than one reservation, the ticket was printed in the old format, so with two reservations that would be on three separate coupons, despite there being plenty of room on the new layout.
Has there been any publicity for passengers anywhere? Seems to be a fairly major change.
I was quite worried the first time I got one of the new tickets. If there is any publicity it doesn't seem to have hit West Yorkshire.
....Speaking of which, attached is the first example I've seen of a PRIV issue. Note the huge letter "D" in the upper orange band. Is this an error (was a symbol intended, like for Railcard and Child tickets?), or was "D" intended? - If so, what could it mean?
I've seen nothing to indicate how a Priv issue should look nor what symbol signifies the pass. According to the last brief I saw, all TVMs are to be done first with an "aim" to get other machines done "eventually", so either all the TVMs are already done, or the left hand doesn't know what the right hand is doing. Anyone care to place a bet on which is true?
Note the huge letter "D" in the upper orange band. Is this an error (was a symbol intended, like for Railcard and Child tickets?), or was "D" intended? - If so, what could it mean?
I've seen no publicity anywhere, and I've been looking quite carefully. Admittedly most of my travels are in the London and Southeast area, where not much has changed so far. Still the only examples I've seen are from one of the Willesden Junction Cubic FasTIS machines, as I illustrated a while ago.
Speaking of which, attached is the first example I've seen of a PRIV issue. Note the huge letter "D" in the upper orange band. Is this an error (was a symbol intended, like for Railcard and Child tickets?), or was "D" intended? - If so, what could it mean?
It means "Discounted" (in a non-common way, i.e. not a defined railcard).
This is NOT how Northern's machines have been doing it. Either one or two reservations on an advance and you get them all on one coupon. Three reservations and you get a ticket and in place of any actual reservations it says to consult the reservation coupon. Then a second coupon can detail up to three reservations. Journeys with four reserved legs are too rare for me to have made one to collect yet!
Walk-up tickets never have a reservation printed on the ticket.
If there's no precise design layout standard, how will staff be able to detect counterfeit tickets?
I don't think that it looks that bad. However the lack of consistency between the different TVM brands isn't very good.
The lack of descenders is also not very pretty.
It was also quite helpful to not have the any permitted wording, stops people claiming "but it says any route is permitted " when they are miles away from a permitted or even a reasonable route.
"any permitted route" is still better than "ANY PERMITTED", though a change to a more DaveNewcastle-esque "any Permitted Route" might be helpful
How about "Permitted Routes Only"? Gets rid of the "any" in the phrasing which is what may cause the issue?