You’re right! It looks like the Overground orange!The Lioness line is orange not yellow!
You’re right! It looks like the Overground orange!The Lioness line is orange not yellow!
Why would I want to fiddle around with a phone, when I could just passively listen to an audible service update?Do we even need service update announcements at all? Now that essentially everyone has a smart phone, is this not a better way of disseminating information, especially as station and train announcements are only as accurate as the member of staff broadcasting them, which in turn depends on a range of factors.
It’s rather convenient that it’s possible for service update announcements to be linked to a measuring routine, which in turn can be led to someone’s bonus. Very easy to have loads of PAs going out, as is nowadays the case on TFL, rather harder to actually deliver useful information.
Why would it be anything more than a one-off cost?The only thing that will be updated regularly on this vanity project will be the cost. > > > > It will increase.
No it wouldn't. Names are far, far easier to remember than numbers. The meaning doesn't matterIt's high time to admit that line names are completely archaic as a concept, mean essentially nothing, and do away with all of them. They are just noises used to refer to the routes and hold no meaning to the majority of people. Rename the Underground lines U1-U11 and combine Thameslink, XR and Overground into S1-S8. DLR lines can be D1-D3(?) and there aren't enough tram routes to justify numbering them.
I mean, which is easier to remember is personal preference so TfL could never get that right. I was fine with the German-style system when I was in Berlin but everyone's brain is different. I agree that the meaning doesn't matter (in fact that was the second bit of my post) but here and elsewhere there has been a lot of complaining on that frontNo it wouldn't. Names are far, far easier to remember than numbers. The meaning doesn't matter
BECAUSE history repeats itselfHow do you make that out given that it's CapEx (capital expenditure), not OpEx (operating expenditure)?
Not sure "line" needs to be included for any of them. None of the Underground lines have "line" at the end.In the key to Lines, Mildmay is missing the word ‘line’
No, it literally isn't. There's all sorts of proper research over the years showing thatI mean, which is easier to remember is personal preference
It depends on which section of the Overground. The core section of the Windrush/ELL is as frequent as central London tube services. New Cross Gate to Sydenham has the same frequency as the Met line's Uxbridge branch (excluding the 2tph Southern services to London Bridge and Victoria). I think the Mildmay is every 7-8 minutes between Willesden Junction and Stratford as well as it splits into 15 mins on the Richmond/Clapham Junction branches.I do feel Liz Line is far more akin to Thameslink in its service pattern & utility than the Overground lines.
You are spot on. Both Windrush and Mildmay lines operate through Canonbury, my local station, at 7-8 min frequency for most of the day most days.It depends on which section of the Overground. The core section of the Windrush/ELL is as frequent as central London tube services. New Cross Gate to Sydenham has the same frequency as the Met line's Uxbridge branch (excluding the 2tph Southern services to London Bridge and Victoria). I think the Mildmay is every 7-8 minutes between Willesden Junction and Stratford as well as it splits into 15 mins on the Richmond/Clapham Junction branches.
I’m assuming it’s because of the poor choice of names and them being new. They need ‘line’ to show that that is what they are referring to.Not sure "line" needs to be included for any of them. None of the Underground lines have "line" at the end.
I guess that the precedent was set by the Elizabeth line. I may be wrong but l seem to recall that the old East London line always had the word line including (that is dragging my mind back 20ish years though).I’m assuming it’s because of the poor choice of names and them being new. They need ‘line’ to show that that is what they are referring to.
I guess that the precedent was set by the Elizabeth line. I may be wrong but l seem to recall that the old East London line always had the word line including (that is dragging my mind back 20ish years though).
Ok, TY. I was in London since 86.Ex. Wapping resident here from 2002-2004. Only ever said "East London" on tube maps.
If the names are irrelevant they could have just been given numbers, O1, O2 etc instead of the political virtue signalling that has emerged
Plenty of people opposed and still oppose the Elizabeth line naming, if that name isn't immune from criticism i don't understand why these should be. Surely politically motivated namings shouldn't be something that happens in either direction. I don't want some tit for tat stuff with a future Tory mayor inventing the "Enterprise line" and "Individual responsibility line"
In the key to Lines, Mildmay is missing the word ‘line’
Frankly if that's the worst thing people have to complain about...In the key to Lines, Mildmay is missing the word ‘line’
It's high time to admit that line names are completely archaic as a concept, mean essentially nothing, and do away with all of them. They are just noises used to refer to the routes and hold no meaning to the majority of people. Rename the Underground lines U1-U11 and combine Thameslink, XR and Overground into S1-S8. DLR lines can be D1-D3(?) and there aren't enough tram routes to justify numbering them.
Failing that, any names for the Overground lines are objectively useful and they (or some more linguistically satisfying modification) will become part of common usage as quickly as Elizabeth line did. Objections on the basis of "it costs too much" or "the new names aren't the current names/don't make much sense/don't jive with my personal views/looked at me funny" can be countered with "no it didn't" and "who really cares".
Frankly if that's the worst thing people have to complain about...
Why would it be anything more than a one-off cost?
== Doublepost prevention - post automatically merged: ==
No it wouldn't. Names are far, far easier to remember than numbers. The meaning doesn't matter
How, in this instance, will history repeat itself? The lines have now been named. It is highly unlikely any of them will ever be renamed - the last time a Tube Line was renamed was when the Morden-Edgware LIne became the Northern Line, 84 years ago.BECAUSE history repeats itself
And when it does, the cost always goes up.
The Hammersmith & City rebranded/separation of 1990 was probably the most recent major change, previously being the Metropolitan Line on maps and stations, with the East London Line going orange a minor eventHow, in this instance, will history repeat itself? The lines have now been named. It is highly unlikely any of them will ever be renamed - the last time a Tube Line was renamed was when the Morden-Edgware LIne became the Northern Line, 84 years ago.
The carriage displays now show where the trains are calling at. I'm pretty sure that's new, right? Didn't see it before the renamings.
If the other suburban routes in London ever come undcer TfL control they will be added to the map and presumably get their own names, but that will be a similar process to the addition of the Anglia lines to the Overground a few years ago. (And necessary to indicate that they will have, finally, become fully integrated with TfL's fares system)
And seeing as virtually nothing on the line terminates in the City (of London) anymore, probably should have had shorter or new name.The Hammersmith & City rebranded/separation of 1990 was probably the most recent major change, previously being the Metropolitan Line on maps and stations, with the East London Line going orange a minor event
Just expressing a personal opinion, which I realise isn’t that popular these days unless it conforms to the leftist woke agenda. Just because I don’t agree with you doesn’t make me wrong and you can’t make assumptions about what I do and don’t like.Bet that you loved the Elizabeth line name though....
A little rude if you don’t mind me saying. I was expressing a personal opinion, it’s not a question of dealing with it or not. I don’t like the names, in the same way I didn’t like a pacer, it’s Just an opinion.Railways in London have names. The fact you don't like them is neither here nor there. Some people wouldn't have liked whatever was chosen. So deal with it
Eh?!BECAUSE history repeats itself
And when it does, the cost always goes up.
Are you serious, this is a discussion about names of metro line names, - no need to bang your anti London drum.... unless it conforms to the leftist woke agenda.
Theirs going to be so many named lines if everything local in London gets moved into overground. Which is why I believe if there has to be names , they'll have to be some kind of actual geographical relation for each name, even if something silly like "Surrey Quays line" , not just a bunch of dedications to various special interest groups that don't have any exclusive relation to the line. Yes I'm aware the Jubilee line and Elizabeth are examples too, but only one was named at a time making publicity easier rather than whole spate of them at onceAnything other than 'Hayes line', 'Bexleyheath line', 'Shepperton line' etc.,
Railways in London having names is a fact, not an opinion. Whatever was chosen would have annoyed someone, that is also a fact. I also at no point have said I liked the names either, but a sensible process was gone through to choose them and that's fine. I don't like some of them at all eitherThis relates to both of you. I was commenting about a railway decision and implementation of it, whereas both of you were attacking me for my opinion. This is happening too often in the UK today. We seem to want to remove free speech because our views don’t conform to what are loud voices as shouting.
Long live democracy (and the Elizabeth Line)… but sadly probably not in the uk.