giblets
Member
Maybe a stupid question, but will the HOOP be required for HS2, or would that be done manually?
Is there only going to be one of these "HOOP" trains then?
I'm pretty sure when they were first announced the order was to be for two.
HS2 will be able to use standard equipment from standard European contractors, so will actually be cheaper than most routes, thanks to not needing special UK equipment...
The MPs were already assuming all the jobs/equipment would be British.
Made me wonder what the UK content of HS1 was, beyond concrete and steel...
Don't tell the MPs HS2 will probably be the French LGV design (track, electrification, signalling, trains).
The MPs were already assuming all the jobs/equipment would be British.
Made me wonder what the UK content of HS1 was, beyond concrete and steel...