• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

New Lines needed

Status
Not open for further replies.

Pinza-C55

Member
Joined
23 May 2015
Messages
1,035
I think a simple rule of thumb for which lines "might" be viable would be to consider the ones which closed latest.
Richmond to Darlington for instance which hung on till 1968 and had 2 fair sized traffic centres at Catterick and Croft Spa, springs to mind.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,251
Location
Yorks
I think a simple rule of thumb for which lines "might" be viable would be to consider the ones which closed latest.
Richmond to Darlington for instance which hung on till 1968 and had 2 fair sized traffic centres at Catterick and Croft Spa, springs to mind.

Or indeed, Brighton - Tonbridge, closed in 1969 and 1984.
 

simonw

Established Member
Joined
7 Dec 2009
Messages
1,398
The Fleetwood, Wisbech, Ashington, Coalville, Portishead, and other lines with track in place should be the prioty. As much as I want to see a line through Louth, that money could reopen several other lines where the track is almost ready.

Certainly Portishead will see the existing track removed and the trackbed rehabilitated and new track laid.

I would assume the same would apply for most reopenings where the track has been out of use for sometime.
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,657
The Fleetwood, Wisbech, Ashington, Coalville, Portishead, and other lines with track in place should be the prioty. As much as I want to see a line through Louth, that money could reopen several other lines where the track is almost ready.

Having track in place doesn't mean that the reopening is going to be cheap. Some of these lines need major restorative work for them to provide feasible passenger services. We must not forget the impact HS2 will have on the network and there will need to be openings for that.
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,713
Unlike the Straits of Dover that is shallow, I thought there is a deep north/south trench in the Irish Sea that prevents tunnelling.

All the reinstatements I have mentioned in North Yorkshire have positive benefit cost ratios, unlike HS2 that is negative, so don't include these in your worthless fantasy high speed constructions. My lines are short distance, high volume commuters routes that will take hundreds of thousands of car journeys off roads annually.

HS2 has a positive BCR - latest business case published in November 2015 gives it 2.2 - I would be genuinely interested to see the BCRs for the north yorkshire schemes you mention.
 

Howardh

Established Member
Joined
17 May 2011
Messages
9,770
The line's already there and working - but it's run by a heritage railway.
Rossendale - Bury - Haywood - Victoria as a commuter line Rossendale to Bury and then fast to Manchester. Even though it's the *long way round* I'm sure it would be faster and more comfortable than the tram and very popular with commuters. And bring British Rail back to Bury!
Shortly that train would be able to get to Oxford Rd and Piccadilly (and beyond...airport springs to mind) but by that stage it becomes a curvy "S" journey, but even so might be preferable than crawling through Manchester centre on a tram?

But, of course, you have to convince Transport For Gtr. Manchester that the money spent (wasted IMO!!) on a tram from the centre to the Airport wasn't wasted. Complete barmpot idea<( - but that's for another thread!!
 
Last edited:

GrimsbyPacer

Established Member
Joined
13 Oct 2014
Messages
2,254
Location
Grimsby
HS2 has a positive BCR - latest business case published in November 2015 gives it 2.2 - I would be genuinely interested to see the BCRs for the north yorkshire schemes you mention.

The 2009 ATOC report says reopening Ripon to Harrogate is BCR 0.6.
But North Yorks council want to open it as a through line, ie Leeds to Darlington avoiding York, this will increase the BCR greatly, and if HS2 is to use the ECML north of York then this line is essential for TPE & freight.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Total w***ers.

And with that statement you've shown you really need to grow up.

Thankfully and rightly transport priorities are dictated on what will benefit the most people per £spent and not on the desires of the crayonistas on these boards. But by making the statement you did you've shown you clearly don't have the maturity to engage in such discussions in a grown up fashion.
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,713
The 2009 ATOC report says reopening Ripon to Harrogate is BCR 0.6.
But North Yorks council want to open it as a through line, ie Leeds to Darlington avoiding York, this will increase the BCR greatly, and if HS2 is to use the ECML north of York then this line is essential for TPE & freight.

Thanks - A BCR less than 1 means the benefits are less than the cost. Surely York is the biggest market in the area so not sure why you would want to avoid it and cant see it having much of an impact on the BCR.

While I understand why people want to see rail reopenings there needs to be a degree of realism - very few schemes with a BCR less than 1.5 are going anywhere.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
I know it's Hogmanay, but some of the posters have started on their tipples early, given the suggestions :lol:

There are so many new (old) lines that are needed (again) and thankfully some are on their way. The Varsity Line linking Oxford and Cambridge is in progress, at least from Oxford to Bedford by 2019. We remain to see what will happen East of Bedford.
East-west railways are needed in Hertfordshire and in many other places in the country.
Maldon (Essex) and Haverhill (Suffolk) are without rail links.
It is impossible to go from Norwich to King's Lynn directly by train.
North and North West Norfolk are poorly served.
East Lincolnshire is poorly served; a line needs to connect Skegness with Grimsby.
North Devon is poorly served, apart from the excellent preserved railway from Taunton to Minehead. A line needs to connect central Cornwall with Exeter via Launceston and Okehampton.
The old line Carmarthen to Aberystwyth needs reinstating ... and so on.

Your list of urgently needed lines generally all appear to be through relatively empty parts of the country.

It would be possible to get from Norwich to King's Lynn directly by train - the fact that Anglia/ National Express East Anglia/ Greater Anglia haven't bothered with such a service maybe tells you that they don't think it'd be with bothering with ought to tell us something though?

I reckon the greater need is for new new lines. Several lines in to London and other large conurbations are full, and longer distance trains with only a few stops conflict with all-stations trains. Whether new high speed routes are the best answer may be debateable, but something new that offers a far greater capacity increase than merely upgrading existing routes is certainly necessary, when you consider the continually rising numbers of passengers and the expected increase in the total population.

Agreed

Let's remember most of the beeching cuts were actually enacted by the subsequent Labour government. And BR had started cutting lines before that. There was a general consensus that the railways were on the way out. Hindsight's a wonderful thing.

My view is that many of the closures were sensible, a lot were marginal and in hindsight shouldn't have happened, and a fair few were plain nuts. The main line closures and drastic cutting in urban areas would be in the latter group.

Agreed.

Why shouldn't they? Railways should be a public service at affordable prices that everybody can use not just the well heeled.

As a top band taxpayer before retirement, I objected to paying taxes for hospital treatment for smokers and drunks, the war in Iraq and foreign aid to countries that have a space programme but had to pay taxes.

I also paid/pay rail subsidy in my taxes even though my nearest decent railhead is 30 miles away. Why shouldn't I have a reinstated rail link subsidised by those who have had a good local service for years already such as in and around London and other big cities?

Railways are be a public service at affordable prices that everybody can use not just the well heeled.

That doesn't mean that every village in the UK has a right to one though. Heavy rail works best in urban areas, places with high population density, significant flows of people all day long, that kind of thing.

London and other cities can justify this. Towns with around fifteen thousand people can't always.

There always seems to be money for acres of tarmac with lights blazing twenty four hours a day to 'facilitate' rush hour traffic

As you say, more unnecessary tarmac with additional maintenance costs, snow clearing, carriageway lighting and unnecessary land take.

I've heard many reasons on this Forum for why rail is better than road, but I've never seen people get worried about the enormous cost of lightbulbs before :lol:

Total w***ers

You're a charmer... :lol:

This £1billion could have been used to reinstate railways between Northallerton and Harrogate (White Rabbit Line), York-Market Weighton-(Beverley) (Minster Line) and Skipton-Earby-(Colne)

What's the fascination with Skipton to Colne?

Other than "because it was on a 1960s map"...

north and north west Norfolk simply don't have the population to support reopening any closed lines

That's it - if we have new lines then they need to be in relatively built up areas.

a slash and burn policy based on 'sexed up' statistics and dubious political patronage

I love a good conspiracy theory... don't forget to mention "The Establishment" though ;)

To take the OP's suggestion about new lines and not reworking the same old story about re-opening rural lines in the middle of nowhere I suggest the following:

1 Outer London orbital - roughly following the M25 with interchanges with all lines entering London to reduce the need for cross London journeys and open up new travel opportunities

<snip> </snip>

3 Outer Manchester orbital roughly following M60 again to allow improved travel across Greater Manchester

1) Rail has a very high share of the travel into central London market and as you say Crossrail 2/3 are being developed to meet future demand. However, outside that market rail's market share is tiny. The London overground inner orbital service shows there is huge unmet demand for journeys that dont go into central London. The M25 supposedly carries more people a day than the whole national rail network - making journeys that are presently difficult to make by rail. A new outer orbital railway even if took only about 5% of journeys presently on the M25 would be one of the busiest in the country. It would also free up capacity on rail services into central London as those who presently travel into and out of London again would be diverted to it, reducing or delaying the need for very expensive capacity upgrades on these lines.

<snip> </snip>

3) M60 is one of the UK's busiest motorways clogged up with very short distance trips - Highways England would love to close many of the junctions on it to remove some of those trips and improve safety (huge amount of weaving traffic due to the short distance between junctions). A orbital railway would allow large number of trips which again are not very difficult by rail

The two orbital motorways are certainly busy - the trouble is that there are thousands of different journeys being made by them - heavy rail works best with large volumes.

Maybe there are some areas where light rail could link heavy rail hubs (e.g. Manchester Airport to Stockport), but the relative failure of "outer orbital" lines like Watford to St Albans, Stockport to Guide Bridge doesn't encourage me. You'd need to go closer in to work better (e.g. London Overground).

Unsurprisingly I agree re: "new lines and not reworking the same old story about re-opening rural lines in the middle of nowhere though" :lol:

The Fleetwood, Wisbech, Ashington, Coalville, Portishead, and other lines with track in place should be the prioty

Agreed re Ashington and Portishead. Simple commuter lines into nearby cities - no pretentions about some megascheme.

As I have said previously, I would rather crawl on my hands and knees than use a bus. If I can't travel by car or train then I will not travel. Many think the same way.

Such an enlightened attitude...

There are many who think the same way of heavy rail too - which is an inconvenient truth to a few people...

Thankfully and rightly transport priorities are dictated on what will benefit the most people per £spent and not on the desires of the crayonistas on these boards

Agreed :lol:
 

simonw

Established Member
Joined
7 Dec 2009
Messages
1,398
The line's already there and working - but it's run by a heritage railway.
Rossendale - Bury - Haywood - Victoria as a commuter line Rossendale to Bury and then fast to Manchester. Even though it's the *long way round* I'm sure it would be faster and more comfortable than the tram and very popular with commuters. And bring British Rail back to Bury!
Shortly that train would be able to get to Oxford Rd and Piccadilly (and beyond...airport springs to mind) but by that stage it becomes a curvy "S" journey, but even so might be preferable than crawling through Manchester centre on a tram?

But, of course, you have to convince Transport For Gtr. Manchester that the money spent (wasted IMO!!) on a tram from the centre to the Airport wasn't wasted. Complete barmpot idea<( - but that's for another thread!!
Why do you say the link to the airport is a waste of money?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
How many times does it have to be said, the Metrolink airport line was not built for travel between the city centre and the airport.
 

simonw

Established Member
Joined
7 Dec 2009
Messages
1,398
How many times does it have to be said, the Metrolink airport line was not built for travel between the city centre and the airport.
That has always been my understanding as well, hence my question above.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,898
Location
North
HS2 has a positive BCR - latest business case published in November 2015 gives it 2.2 - I would be genuinely interested to see the BCRs for the north yorkshire schemes you mention.

I am rather sceptical about HS2 being 0.4 and then jumping to 2.2.

I was Chair of the committee that commissioned benefit/cost analysis of the Ripon-Harrogate reinstatement in 2005. The best option was 1.3:1.

Reinstatement of Harrogate-Ripon-Northallerton is better for being a through/available diversion route and early calculations, but not yet verified by consultants until enough funding is found, suggest BCR of 3.5-4.0.

ATOC looked at it in 2009 and calculated 4.6 but I think that is too optimistic.

Minster Line and Skipton-Colne BCRs were on respective websites but from memory were in excess of 2.0.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,251
Location
Yorks
HS2 has a positive BCR - latest business case published in November 2015 gives it 2.2 - I would be genuinely interested to see the BCRs for the north yorkshire schemes you mention.

Hmm. Didn't they have to 'amend' the BCR methodology for HS2 as it wasn't good enough using the original calculation. Such flexibility is sadly lacking for smaller projects it seems.
--- old post above --- --- new post below ---
I love a good conspiracy theory... don't forget to mention "The Establishment" though ;)

Oh, I think it probably gives the Establishment at the time too much credit to put it all down to conspiracy. Certainly there was a feeling at the Department of Transport that the network had to shrink, and to hell with the consequences (as well as bothering to check whether the cuts were actually making the savings promised).

There was also an element of incompetence too, in terms of a Government whose judgement was blinded by faith in motor transport and boffins who could come up with a handy statistic to support their existing prejudices.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,597
Location
Nottingham
That has always been my understanding as well, hence my question above.

It (Metrolink Airport route) is intended to link areas of southern Manchester to the airport and also to the city centre. The train is always going to be quicker for anyone travelling between the city centre and the airport, so will take the vast majority of that passenger flow, and that was well understood when preparing the business case for it. In that sense it's not much different from the Metrolink routes to Ashton or Didsbury.
 

Howardh

Established Member
Joined
17 May 2011
Messages
9,770
Why do you say the link to the airport is a waste of money?

Because there's a perfectly good rail link, and bus routes too. If there was a need for a tram to Sth. Manchester, I can't find a reason to extend it to the airport. If there is a good reason (for the cost of doing it) then tell me!!
 

Philip C

Member
Joined
21 Feb 2013
Messages
407
Because there's a perfectly good rail link, and bus routes too. If there was a need for a tram to Sth. Manchester, I can't find a reason to extend it to the airport. If there is a good reason (for the cost of doing it) then tell me!!

1. The line between the City Centre and Wythenshawe brings rail connectivity to a vast residential area in a manner which was both fundable and for which a business case could be established.

2. The line gives far better connection (from Wythenshawe) to areas such as Salford Quays & Trafford Park than available by the bus network.

3. Provision of peak-time bus operation into the city centre can be unreliable.

4. Stopping short of the Airport, itself a large and growing area of employment, would have been a complete nonsense. Why wouldn't you provide connection into the UK's third busiest airport with all the onward services (air, rail & bus)? Quite apart from any other consideration the economics of lines with traffic attractors at both ends are vastly to be preferred.

If this brief list isn't enough then please contemplate the following suggestions:

1. West Midlands has long proposed a line from Birmingham to its Airport via Chelmsley Wood. Presumably you are either against the idea in its entirety or feel it should stop one field short of the airport!

2. Had the Heathrow Main Line connections been built first, then you would have opposed the extension of the Piccadilly Line beyond Hounslow?
 
Last edited:

Howardh

Established Member
Joined
17 May 2011
Messages
9,770
1. The line between the City Centre and Wythenshawe brings rail connectivity to a vast residential area in a manner which was both fundable and for which a business case could be established.
Never said it didn't - was a great idea.
2. The line gives far better connection (from Wythenshawe) to areas such as Salford Quays & Trafford Park than available by the bus network.
It does.
3. Provision of peak-time bus operation into the city centre can be unreliable.
Use the tram
4. Stopping short of the Airport, itself a large and growing area of employment, would have been a complete nonsense. Why wouldn't you provide connection into the UK's third busiest airport with all the onward services (air, rail & bus)? Quite apart from any other consideration the economics of lines with traffic attractors at both ends are vastly to be preferred.
Because one at the terminus at Wythenshawe, it would be so easy to jump onto a bus for the final leg. Most in S.Manchester don't live within walking distance to a tram stop, so would either use the bus to the airport or a combination of bus/tram.
If this brief list isn't enough then please contemplate the following suggestions:

1. West Midlands has long proposed a line from Birmingham to its Airport via Chelmsley Wood. Presumably you are either against the idea in its entirety or feel it should stop one field short of the airport!
is there already a train link to the airport? If there is, use that, if not, build the tramline.

2. Had the Heathrow Main Line connections have been built first then you would have opposed the extension of the Piccadilly Line from beyond Hounslow?
Yup.

Not against extending tram lines - the more the merrier, BUT they have to be paid for/subsidised and where connections already exist or exist and can be improved then I feel there are more immediate uses for the taxpayer's (ie me) money.

But I did say the argument's for another thread - what about my original proposal to bring the Rossendale line back under BR?
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,713
I am rather sceptical about HS2 being 0.4 and then jumping to 2.2.

I was Chair of the committee that commissioned benefit/cost analysis of the Ripon-Harrogate reinstatement in 2005. The best option was 1.3:1.

Reinstatement of Harrogate-Ripon-Northallerton is better for being a through/available diversion route and early calculations, but not yet verified by consultants until enough funding is found, suggest BCR of 3.5-4.0.

ATOC looked at it in 2009 and calculated 4.6 but I think that is too optimistic.

Minster Line and Skipton-Colne BCRs were on respective websites but from memory were in excess of 2.0.

All BCRs are calculated in the same way (or should be), I dont recall seeing a BCR for HS2 of 0.4 - it has always been greater than 2 for the whole Y network. The latest Skipton-Colne BCR I saw on the website was 1.5 and the Harrogate Ripon ATOC report quoted previously in this thread was 0.6
--- old post above --- --- new post below ---
I am rather sceptical about HS2 being 0.4 and then jumping to 2.2.

I was Chair of the committee that commissioned benefit/cost analysis of the Ripon-Harrogate reinstatement in 2005. The best option was 1.3:1.

Reinstatement of Harrogate-Ripon-Northallerton is better for being a through/available diversion route and early calculations, but not yet verified by consultants until enough funding is found, suggest BCR of 3.5-4.0.

ATOC looked at it in 2009 and calculated 4.6 but I think that is too optimistic.

Minster Line and Skipton-Colne BCRs were on respective websites but from memory were in excess of 2.0.

Hmm. Didn't they have to 'amend' the BCR methodology for HS2 as it wasn't good enough using the original calculation. Such flexibility is sadly lacking for smaller projects it seems.
--- old post above --- --- new post below ---

The approach used for HS2 is the same as for all other transport schemes - new values of time that are coming out in April will boost any transport scheme with high numbers of commuters which will tend to benefit urban rail schemes more than other transport projects
--- old post above --- --- new post below ---
Yup.

Not against extending tram lines - the more the merrier, BUT they have to be paid for/subsidised and where connections already exist or exist and can be improved then I feel there are more immediate uses for the taxpayer's (ie me) money.

But I did say the argument's for another thread - what about my original proposal to bring the Rossendale line back under BR?

With 19,000 people employed at Manchester Airport it is a key destination for local people and is ideally served by trams and local buses hence why it is served by Metrolink.

Dont know how easy it would be to rebuild the line from Bury into Manchester - possibly easier than bringing back British Rail!
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,597
Location
Nottingham
Yup.

Not against extending tram lines - the more the merrier, BUT they have to be paid for/subsidised and where connections already exist or exist and can be improved then I feel there are more immediate uses for the taxpayer's (ie me) money.

But I did say the argument's for another thread - what about my original proposal to bring the Rossendale line back under BR?

Your're suggesting that Manchester Airport doesn't need a tram line because it already has trains.

But you're also suggesting that Bury should have a train link when it already has trams.

Some inconsistency?
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,713
Yup.

Not against extending tram lines - the more the merrier, BUT they have to be paid for/subsidised and where connections already exist or exist and can be improved then I feel there are more immediate uses for the taxpayer's (ie me) money.

But I did say the argument's for another thread - what about my original proposal to bring the Rossendale line back under BR?

With 19,000 people employed at Manchester Airport it is a key destination for local people and is ideally served by trams and local buses hence why it is served by Metrolink.

Dont know how easy it would be to rebuild the line from Bury into Manchester - possibly easier than bringing back British Rail!
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Because there's a perfectly good rail link, and bus routes too. If there was a need for a tram to Sth. Manchester, I can't find a reason to extend it to the airport. If there is a good reason (for the cost of doing it) then tell me!!

One of the purposes of the Metrolink airport line was to give access for people in the relatively deprived area of Wythenshawe to employment opportunities in and around the airport.

The airport contributed to the cost of the line because, as a planning condition for being allowed to build the second runway, it had agreed to strive to increase the proportion of passengers and staff who use public transport for their ground journey to the airport.
 

simonw

Established Member
Joined
7 Dec 2009
Messages
1,398
It (Metrolink Airport route) is intended to link areas of southern Manchester to the airport and also to the city centre. The train is always going to be quicker for anyone travelling between the city centre and the airport, so will take the vast majority of that passenger flow, and that was well understood when preparing the business case for it. In that sense it's not much different from the Metrolink routes to Ashton or Didsbury.

Not sure why you quoted my post as it wasn't me who challenged the reason for building the line.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,589
Location
Scotland
A new rail terminal would obviously be needed due to different Irish gauge so through running into Ireland would not happen.
Surely you'd run standard gauge trains through to new platforms at an existing terminal in Dublin?
 

40907

Member
Joined
17 Nov 2014
Messages
53
Reinstated lines that would provide alternative routes and capacity between major population centres include:

-The former Midland line through the Peak District, effectively linking the East Midlands with the Stockport/Manchester conurbation.

-The Woodhead route from Sheffield to Manchester.

40907
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,713
The two orbital motorways are certainly busy - the trouble is that there are thousands of different journeys being made by them - heavy rail works best with large volumes.

Maybe there are some areas where light rail could link heavy rail hubs (e.g. Manchester Airport to Stockport), but the relative failure of "outer orbital" lines like Watford to St Albans, Stockport to Guide Bridge doesn't encourage me. You'd need to go closer in to work better (e.g. London Overground).

:

I agree in part with your comment on orbital motorways but linking medium sized urban centres by rail would cover a small percentage of those trips and as there are a few million a day of them, as I said just attracting 5% to rail would mean a heavily used rail line.

The problem with Watford-St Albans, Bedford to Bleatchly and to a lessor extent the old Stockport to Stalybridge services is that they are infrequent, stop at every little hamlet on the way and dont provide very good connections with main line services. From memory the old Stockport - Stalybridge line was reasonably well used with people connecting at both stations on to longer distance services but not for local trips.

London overground shows what can be done with high frequency services and integrated ticketing - interested to know what percentage of trips on this line interchange with other routes and modes.
--- old post above --- --- new post below ---
Surely you'd run standard gauge trains through to new platforms at an existing terminal in Dublin?

Not sure where a tunnel portal would surface in Dublin. Both Connolly and Heuston stations are on fairly constrained sites and the latter is not well located so I think you would need a completely new station somewhere
--- old post above --- --- new post below ---
Reinstated lines that would provide alternative routes and capacity between major population centres include:

-The former Midland line through the Peak District, effectively linking the East Midlands with the Stockport/Manchester conurbation.

-The Woodhead route from Sheffield to Manchester.

40907

I agree with the Midland Main line - I seem to recall that operation Rio seemed to highlight reasonable demand from Leicester etc to Manchester and would restore links between Derby and Manchester
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,589
Location
Scotland
Not sure where a tunnel portal would surface in Dublin. Both Connolly and Heuston stations are on fairly constrained sites and the latter is not well located so I think you would need a completely new station somewhere.
If you're spending £15B plus on a tunnel that will never repay its capital costs, you could spare a few hundred million for low-level platforms at Heuston or Connolly.
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,713
If you're spending £15B plus on a tunnel that will never repay its capital costs, you could spare a few hundred million for low-level platforms at Heuston or Connolly.

Fair comment :D - although not aware of any rail line in the UK in the modern era that has covered its capital costs!
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,574
Location
Brighton
I agree in part with your comment on orbital motorways but linking medium sized urban centres by rail would cover a small percentage of those trips and as there are a few million a day of them, as I said just attracting 5% to rail would mean a heavily used rail line.

The problem with Watford-St Albans, Bedford to Bleatchly and to a lessor extent the old Stockport to Stalybridge services is that they are infrequent, stop at every little hamlet on the way and dont provide very good connections with main line services. From memory the old Stockport - Stalybridge line was reasonably well used with people connecting at both stations on to longer distance services but not for local trips.

London overground shows what can be done with high frequency services and integrated ticketing - interested to know what percentage of trips on this line interchange with other routes and modes.

Indeed. The primary problem with Watford to St Albans is the frequency. Resolve that, and you'll get much better usage, though still not "heavy" usage. To achieve that you need to make the interchanges better, and to achieve that means moving St Albans station south a few hundred metres to London Road (which might also enable the curvature through the current station site to be eased, increasing fast line speeds). I am confident that were that to happen and the bus routes modified to account for it to create a proper interchange then usage would explode. Watford, Luton and St Albans are major employment centres in their own right, and there is a huge amount of commuter traffic between all of them that currently has little choice but to use the roads. I have a suspicion that a relocated St. A. station may even justify a 3tph or even 4tph peak service on the Abbey line.

If you could then remove the need to change at Watford by linking it to the Croxley link with a dive-under to enable a single journey to the major employment centres in West Watford...well.

With regard to the problems pathing "express" services...would it be economical to widen the stations and put the platform roads on loops, or would we have to suffice with flighting?
 
Last edited:
Status
Not open for further replies.

Top