swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,283
In these days of health and safety crap everywhere why is a genuine risk like the bottleneck at the end of the gated platforms at KX being overlooked?
Sorry if this has already been posted but the mad rush and bottleneck are not safe after / before going on a 91 or HST set because of the sheer number of people.
The final rebuilt station layout is completely different, the concourse will be round the side, and the present gateline will be about 90% exit only.
What I'd suggest is stupid is that they've introduced some gates in advance when they should have awaited the full rebuild.
Numbers wise, there are no more passengers get off an ECML set, than arrive on similar length long distance trains at Paddington, Waterloo or Liverpool St.
--- old post above --- --- new post below ---
As it as been previously stated in post gates have to be set to accept all tickets for a period of time, once that period as passed be prepared for invalid tickets to be rejected.
They didn't at Waterloo IIRC. They were set up correctly the day they started.
Last edited: