• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

My idea for a new DMU order for rural lines

Status
Not open for further replies.

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,672
The Paisley Canal is an interesting one. Whenever the infrequent freight service traverses the line they have to turn the power off!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,749
Location
Nottingham
It would mean dual voltage stock would be needed for most branch lines due to them joining mainlines at some point? For example, if Manchester to Holyhead/Llandudno gets AC electrification then Helsby will have AC electrification but Helsby-Ellesmere Port is a branch line.

Indeed. DC electrification of a branch becomes totally pointless if the main line is electrified with AC.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
The Paisley Canal is an interesting one. Whenever the infrequent freight service traverses the line they have to turn the power off!

Wouldn't like to see that on the Mid-Cheshire line then. The freight to the Tata Chemicals' Winnington works runs at a slower speed than passenger trains and runs close to the peak times for passenger trains - there's two return workings daily - a departure from the Winnington works to the Derbyshire Quarries at around 8:30am and an arrival at the Winnington works at around 5pm. And that's not the only freight on the line.
 
Last edited by a moderator:

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,368
Most of the savings in that light rail study relate to the provision of telephone poles as supports and using trolleywire esque connections anyway.

No reason you couldn't apply that with 25kV.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Most of the savings in that light rail study relate to the provision of telephone poles as supports and using trolleywire esque connections anyway.

No reason you couldn't apply that with 25kV.

Would there by a maximum speed you can do with such overheads though?

Just thinking about my own local line if the trains reach 75mph on one section where there's a big gap between stations and with a minor track upgrade and electrification and the associated faster acceleration it could probably have something like a 323 running at it's top speed of 90mph.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Wouldn't like to see that on the Mid-Cheshire line then. The freight to the Tata Chemicals' Winnington works runs at a slower speed than passenger trains and runs close to the peak times for passenger trains - there's two return workings daily - a departure from the Winnington works to the Derbyshire Quarries at around 8:30am and an arrival at the Winnington works at around 5pm. And that's not the only freight on the line.
I imagine that electrification of the Mid-Cheshire would be done to a standard (including gauge clearance works) that would allow electrically hauled freight trains to use it as far as Hartford Junction (e.g. for Trafford Park to Mossend Yard workings, to avoid going round via Wilmslow and Crewe) and include the Middlewich branch and the Heaton Norris to Guide Bridge line (to enable freight traffic between Stockport and Crewe to be routed this way, freeing up paths on the WCML between Wilmslow and Crewe).
Would there by a maximum speed you can do with such overheads though?

Just thinking about my own local line if the trains reach 75mph on one section where there's a big gap between stations and with a minor track upgrade and electrification and the associated faster acceleration it could probably have something like a 323 running at it's top speed of 90mph.
Conventional catenary could be used on the high speed section with trolley wire on the sub-60mph sections to reduce cost.
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
low cost or not I think wiring up a route say the WHL would never happen owing to the remote nature of such a huge pjrt of it! We've all seen a 66 come to the end of its life where it landed after derailing in an area with no road access, now swap that derailed 66 for a (underailed) cl317, suitably refurbed for the purpose and with a panto fitted which has just brought the wires down in a long single section?
Whoever is running Scotrail by then will have a big problem on there hands.

As to an rural DMU, I like the idea of the onboard facilities but agree with others 3 or 4 coaches for certain and SDO as a must. I still favour the idea of a 2nd Gen Pacer, crash worthy but using again a bus boddy supplied by any of the main manufacturers out there with the abilitty to have a panto fitted in future.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,368
West Highland Line or Far North line could both be single end fed from Inverness if required, the low power demands of the route allowing you to make use of the permitted voltage drops in 25kV systems to get away with it, especially if you use autotransformers to step up the voltages on the northern systems.

With the rather low incidence of overbridges and tunnels on both routes, using appropriately specced equipment the cost would probably be far below average.
(And as to masts blocking views on the WHL.... there are rarely impressive views on both sides of the train at once right? just have the masts on the "less scenic" side at any particular point.
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
hadnt thought of that Edd, would be a case for that but still leavs you relient of diesel if summit goes wrong though.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Conventional catenary could be used on the high speed section with trolley wire on the sub-60mph sections to reduce cost.

You could do that but then it could be seen as short sightedness in the future if the same line needs more capacity/express services. I think 10 years ago we would have said that would be adequate for Chat Moss but not now there are plans for Scottish services and TPE services to use it.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
low cost or not I think wiring up a route say the WHL would never happen owing to the remote nature of such a huge pjrt of it! We've all seen a 66 come to the end of its life where it landed after derailing in an area with no road access, now swap that derailed 66 for a (underailed) cl317, suitably refurbed for the purpose and with a panto fitted which has just brought the wires down in a long single section?
Whoever is running Scotrail by then will have a big problem on there hands.
The Alps are criss-crossed by electrified lines running through more remote/inaccessible areas than any in Scotland. One even goes up the north face of the Eiger to the Jungfraujoch!
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,128
Location
Redcar
The freight to the Tata Chemicals' Winnington works runs at a slower speed than passenger trains and runs close to the peak times for passenger trains - there's two return workings daily - a departure from the Winnington works to the Derbyshire Quarries at around 8:30am and an arrival at the Winnington works at around 5pm. And that's not the only freight on the line.

The key word was 'infrequent' obviously on lines where there are regular freight moves the Paisley Canal method wouldn't be appropriate.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,749
Location
Nottingham
As I understand it the freight terminal on the Canal line is not actually in use but there may be a use for it in the future. Hence the only current need to switch the power off is for engineering trains, which would probably be going to possessions on the route that needed the power turning off anyway. If the terminal is revived and needs frequent trains then money might be spent on improving the clearances.
 
Status
Not open for further replies.

Top