The Paisley Canal is an interesting one. Whenever the infrequent freight service traverses the line they have to turn the power off!
It would mean dual voltage stock would be needed for most branch lines due to them joining mainlines at some point? For example, if Manchester to Holyhead/Llandudno gets AC electrification then Helsby will have AC electrification but Helsby-Ellesmere Port is a branch line.
The Paisley Canal is an interesting one. Whenever the infrequent freight service traverses the line they have to turn the power off!
The Paisley Canal is an interesting one. Whenever the infrequent freight service traverses the line they have to turn the power off!
Most of the savings in that light rail study relate to the provision of telephone poles as supports and using trolleywire esque connections anyway.
No reason you couldn't apply that with 25kV.
I imagine that electrification of the Mid-Cheshire would be done to a standard (including gauge clearance works) that would allow electrically hauled freight trains to use it as far as Hartford Junction (e.g. for Trafford Park to Mossend Yard workings, to avoid going round via Wilmslow and Crewe) and include the Middlewich branch and the Heaton Norris to Guide Bridge line (to enable freight traffic between Stockport and Crewe to be routed this way, freeing up paths on the WCML between Wilmslow and Crewe).Wouldn't like to see that on the Mid-Cheshire line then. The freight to the Tata Chemicals' Winnington works runs at a slower speed than passenger trains and runs close to the peak times for passenger trains - there's two return workings daily - a departure from the Winnington works to the Derbyshire Quarries at around 8:30am and an arrival at the Winnington works at around 5pm. And that's not the only freight on the line.
Conventional catenary could be used on the high speed section with trolley wire on the sub-60mph sections to reduce cost.Would there by a maximum speed you can do with such overheads though?
Just thinking about my own local line if the trains reach 75mph on one section where there's a big gap between stations and with a minor track upgrade and electrification and the associated faster acceleration it could probably have something like a 323 running at it's top speed of 90mph.
Conventional catenary could be used on the high speed section with trolley wire on the sub-60mph sections to reduce cost.
The Alps are criss-crossed by electrified lines running through more remote/inaccessible areas than any in Scotland. One even goes up the north face of the Eiger to the Jungfraujoch!low cost or not I think wiring up a route say the WHL would never happen owing to the remote nature of such a huge pjrt of it! We've all seen a 66 come to the end of its life where it landed after derailing in an area with no road access, now swap that derailed 66 for a (underailed) cl317, suitably refurbed for the purpose and with a panto fitted which has just brought the wires down in a long single section?
Whoever is running Scotrail by then will have a big problem on there hands.
The freight to the Tata Chemicals' Winnington works runs at a slower speed than passenger trains and runs close to the peak times for passenger trains - there's two return workings daily - a departure from the Winnington works to the Derbyshire Quarries at around 8:30am and an arrival at the Winnington works at around 5pm. And that's not the only freight on the line.