Between 15 and 30 min delays out of Euston on VT services tonight. Incoming trains delayed by signal problems near Crewe. Not a great week for WCML
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Rugd1022

Member
Joined
19 Feb 2010
Messages
565
Location
Rugby
Track curcuit failure south of Stafford too this afternoon, but trains were being talked past signals in good fashion so the delay wasn't too bad.
 

Antman

Established Member
Joined
3 May 2013
Messages
6,840
Also delays of 30 minutes in the Wigan area due to a trespasser
 

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
Was bad Sunday afternoon too... Points failures at Hanslope Junction and Ledburn Junction, as well as a TCF at Canton Junction.
 

voyagerdude220

Established Member
Joined
13 Oct 2005
Messages
4,263
Also issues between Motherwell and Glasgow Central, I think in the Newton area.
Southbound Scotrail's 1C52 18:39 Ayr to Edinburgh got stuck outside Motherwell for over an hour, with Virgin's 20:10 Glasgow Central to Crewe also over an hour late.
 

68000

Member
Joined
27 Jan 2008
Messages
832
There have been a few incidents today affecting WCML traffic in Scotland

1. Points failure at Uddingston Junction after overnight works meaning all traffic diverted via Bellshill (hopefully fixed tonight)

2. Freight train got stuck for a while on the incline towards Bellshill (now fixed)

3. Points failure at Newton this evening (now fixed)
 

eMeS

Member
Joined
12 Jun 2011
Messages
954
Location
Milton Keynes, UK
Was bad Sunday afternoon too... Points failures at Hanslope Junction and Ledburn Junction, as well as a TCF at Canton Junction.

For an ignoramus, what's a "TCF"? Thanks.

I certainly noticed the odd running yesterday pm at Wolverton with the UP Fast being host to slow moving passenger trains, and with Voyagers & Pendolinos running on the UP Slow. Down traffic seemed more normal.
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,552
Location
Somewhere
It stands for Track Circuit Failure generally used when a track circuit is showing occupied when it shouldnt. Its a bit of a misnomer really as the signalling is doing its job. ie its detected there is a problem and gone into its default state.

Should be track circuit showing occupied when clear (SOWC) or showing clear when occupied (SCWO) if you really wan't to get into semantics.
 
Last edited:

Boodiggy

Member
Joined
8 Nov 2012
Messages
642
For an ignoramus, what's a "TCF"? Thanks.

I certainly noticed the odd running yesterday pm at Wolverton with the UP Fast being host to slow moving passenger trains, and with Voyagers & Pendolinos running on the UP Slow. Down traffic seemed more normal.

There is a 50 TSR north of the station on the up fast so that is why trains will be passing by slowly.

The reason trains were diverting on to the slow lines was due to S&T working on points at Ledburn Junction
 

elementalpat

Member
Joined
7 Nov 2011
Messages
81
Seems the wires have gone down again in the northern stretch of the WCML at Lockerbie.

Bad weeks for the WCML so far.

Just curious as then upgrade was done several years ago, were any works done for this part as this area seems quite prone to issues recently.
 

Muzer

Established Member
Joined
3 Feb 2012
Messages
2,784
It stands for Track Circuit Failure generally used when a track circuit is showing occupied when it shouldnt. Its a bit of a misnomer really as the signalling is doing its job. ie its detected there is a problem and gone into its default state.

Should be track circuit showing occupied when clear (SOWC) or showing clear when occupied (SCWO) if you really wan't to get into semantics.
A failure is a failure, IMHO. Do you also object to the term "fail-safe" because if it fails safe, it hasn't really failed? The track circuit is not detecting trains. It is not doing its job. It HAS failed in a manner which is safe, but nevertheless it is still not operating as a track circuit. It has failed.
 

carriageline

Established Member
Joined
11 Jan 2012
Messages
1,897
Some part of the circuit has failed, be it a relay, track side module, cable, IBJ, part of the rail.


Sent from my iPhone using Tapatalk
 

thenorthern

Established Member
Joined
27 May 2013
Messages
4,711
There was a failure this morning as well, London-Manchester via Stoke trains were diverted via Stafford which added quite a bit on. I think it was something to do with signalling.
 

voyagerdude220

Established Member
Joined
13 Oct 2005
Messages
4,263
I notice that a train has broken down this morning, between Penrith and Oxenholme Lake District, causing a few trains to be delayed by over an hour. I don't know which train has broken down though.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,076
Location
Redcar
Would this be the one that was sat in the sidings at Carlisle at approx 1130ish? An eight car 350 no less!
 
Status
Not open for further replies.

Top