They've spent 20B already for a half built phase 1 and prep works for phase 2. Even with the hyper NR costs these days that could have provided plenty of enhancements around our major cities. It would be interesting to see whether the Northern Mayors would have wanted the money spent on HS2 or given to them for local transport improvements. The other wider issue here is how DafT have allowed this project to just spiral so far out of control despite its being filled with an army of consultants.
The problem isn't really DafT, rather it's the is it isn't it from the top.
For example, the 6 month review process whilst Johnson looked at it won't have helped (for example we could have been 6 months further through the build process, and the reduced costs due to inflation and other factors).
I've asked before, and been met with radio silence, since the HS2 budget was set what costs have spiralled?
Yes Euston had doubled, but if everything else is more or less on track that means that costs have gone up by about 5% overall. Even if all the other costs have gone up by an average of 5%, total costs would still only be up by about 10%.
== Doublepost prevention - post automatically merged: ==
When you account for the topography, is it really that much less? The ballast looks to be twice as wide as the final width, I think the perspective and confirmation bias may be playing tricks here. Also worth pointing out a fair amount of that first half looks to be on viaducts, which take up inherently less land than tunnelling but were politically unfavoured if tunnels were an option.
I thought a very similar thing when I saw it. Compare for example the width of the dual carriageway near the start of the video.
Likewise when you see vehicles driving along sections of it, they are tiny compared to the width of the route.