More Delay for HS2, and how should we proceed?

Status
Not open for further replies.

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,652
From what I understand, you would not be able to increase the total number of London to Manchester services due to the Crewe to Manchester line being at capacity. In effect the current London to Manchester via Crewe service would switch to HS2, but the other current two Manchester services would have to remain on the WCML for the entire length.
You will need to make good use of Chelford loops, it happens now with a Macclesfield engineering block.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MarkLong

Member
Joined
20 Sep 2016
Messages
106
If The Manchester leg of HS2 is scrapped then is there still any point in building it at all.

Frankly, I think it should be either built in full as it was originally intended (which includes reinstating the now cancelled Leeds branch), Or it should be scrapped and cancelled altogether.
It can be built in phrases, as Japan's HSR network started from a single line connect their two biggest city and then gradually expanded in the next 60 years, and still in expansion. The critical things is not propose something and cut it back like what Tory gov in HS2, instead choose a practical approach by build things incrementally.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
It can be built in phrases, as Japan's HSR network started from a single line connect their two biggest city and then gradually expanded in the next 60 years, and still in expansion. The critical things is not propose something and cut it back like what Tory gov in HS2, instead choose a practical approach by build things incrementally.
London - Birmingham by itself is a lot of money and work for just London - Birmingham, HS2 was packaged with London - Birmingham / Manchester / Leeds to make full use and get a good business case.

If it was at the drawing board I'd have Manchester with through platforms and a Liverpool - Manchester - Leeds section included instead.
 

Tezza1978

Member
Joined
22 May 2020
Messages
312
Location
Warrington
Seems PM face a lot of pressuare from people urge him not to cut phrase 2 of HS2.

On Sam Coates Sky: 'Earlier there were reports of a HS2 announcement this week. Now that’s a lot less clear and I’m told is just be in the context of the Autumn Statement in November And I’m told not to expect even guidance on IHT at Tory conference …'
Implies that he has seriously underestimated the strength of anger within his own party and from business leaders and is desperately scrabbling around and may change course.
Read some speculation that in the news that the potential scrapping of Euston has gone down worse than all of it - as in undermines the entire business case of the project and its future usefulness

If I were a betting man....I wonder if the compromise may be to proceed with Euston and 2A and then kick the Manchester leg into the "under review" box under the table and leave it for the next Parliament to look at again?

Which makes it very easy for Labour to reinstate the whole route.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
If I were a betting man....I wonder if the compromise may be to proceed with Euston and 2A and then kick the Manchester leg into the "under review" box under the table and leave it for the next Parliament to look at again?
IIRC Manchester isn't through Parliament yet. I wouldn't be surprised if Rishi repackaged it into NPR.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,412
Location
Taunton or Kent
This is what Jay Foreman, a well known Youtuber on Maps and travel networks, predicts about HS2:


My HS2 prediction: The government will commit to Euston but scrap Manchester. They just want to scare us that they might scrap Euston (which EVERYONE understands is staggeringly stupid) so that when they “only” scrap Manchester, we all think “Oh well that’s not so bad then.”
 

Skie

Established Member
Joined
22 Dec 2008
Messages
1,238
Even when it was first announced the Manchester bit of the route looked tenuous and caused plenty of headscratching. The recent 'leak' of WCML revenue confirmed that some of the modelling to support that route was, at best, niave. The dogleg it did for the airport (which I think isn't even guaranteed) and the massive amount of tunnelling involved just looked ripe for someone to poke holes in, especially when it disadvantaged Liverpool and had no provision to be anything but a terminus.

Hopefully HS2 gets to Euston and Crewe, and a sensible next government can come up with a sensible East to West scheme that benefits all of the northern cities and ties in at Crewe (and possibly a line in the East)
 

Parjon

Member
Joined
27 Oct 2022
Messages
519
Location
St Helens
Read some speculation that in the news that the potential scrapping of Euston has gone down worse than all of it - as in undermines the entire business case of the project and its future usefulness
In fact, the "business case" was undermined when the Leeds branch was mutilated and then canned. It relied on nebulous contortions of "new connections" but carried a BCR of 4. Whereas its western neighbour was always in negative territory due to the platinum plated planned spend.

I suppose it would only rub salt into the wounds that had Liverpool been included the BCR would have gone to 3... perhaps even more so knowing factoring in the snide decision to move prematurely to P95, solely to lock the city out, and its role in present day budgetary woes...
 

heathrowrail

Member
Joined
18 Nov 2022
Messages
222
Location
Newbury
The biggest waste of money for a 15-20 minute gain. The same time saving could have been achieved by reopening the New North Mainline, replacing Chilterns loco hauled services with GWR IETs, adding more tracks, higher line speeds and electrification to the Chiltern line.
 

Sad Sprinter

Established Member
Joined
5 Jun 2017
Messages
3,186
Location
Way on down South London town
Even when it was first announced the Manchester bit of the route looked tenuous and caused plenty of headscratching. The recent 'leak' of WCML revenue confirmed that some of the modelling to support that route was, at best, niave. The dogleg it did for the airport (which I think isn't even guaranteed) and the massive amount of tunnelling involved just looked ripe for someone to poke holes in, especially when it disadvantaged Liverpool and had no provision to be anything but a terminus.

Hopefully HS2 gets to Euston and Crewe, and a sensible next government can come up with a sensible East to West scheme that benefits all of the northern cities and ties in at Crewe (and possibly a line in the East)

But I've heard it repeated multiple times a terminus would be perfectly fine as trains could reverse in and out quite quickly. It wasn't a claim I ever brought though.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,280
The biggest waste of money for a 15-20 minute gain. The same time saving could have been achieved by reopening the New North Mainline, replacing Chilterns loco hauled services with GWR IETs, adding more tracks, higher line speeds and electrification to the Chiltern line.
No it couldn't, at least not if there is a desire to still serve the intermediate stations. Can you imagine the disruption caused by adding tracks to the Chiltern Line while still running trains?
 

Sad Sprinter

Established Member
Joined
5 Jun 2017
Messages
3,186
Location
Way on down South London town
Surel
No it couldn't, at least not if there is a desire to still serve the intermediate stations. Can you imagine the disruption caused by adding tracks to the Chiltern Line while still running trains?
Surely he means reopening the old through roads in places. Can't imagine that would be too difficult. Gerrards Cross has been sadly lost though of course.
 

heathrowrail

Member
Joined
18 Nov 2022
Messages
222
Location
Newbury
No it couldn't, at least not if there is a desire to still serve the intermediate stations. Can you imagine the disruption caused by adding tracks to the Chiltern Line while still running trains?
Plenty of old through roads that could be reopened, adding new tracks where possible to add capacity would be a short term pain for long term gain. As happened with the GWML electrification and redoubling of the Cheltenham to Swindon line.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
I suppose it would only rub salt into the wounds that had Liverpool been included the BCR would have gone to 3... perhaps even more so knowing factoring in the snide decision to move prematurely to P95, solely to lock the city out, and its role in present day budgetary woes...
It always seems a bit strange that Liverpool gets snubbed, Virgin Trains was great for Manchester and Birmingham but it seems mad that it is still 1tph (until the 807s finally enter service).

Really we should have had a high-speed line from Liverpool to Leeds built at the same time as HS2 to just north of Crewe and East Midlands Parkway.
higher line speeds
I don't think there is much speed left to eek out of Chiltern. And you still end up at Marylebone.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,995
Location
Surrey
The biggest waste of money for a 15-20 minute gain. The same time saving could have been achieved by reopening the New North Mainline, replacing Chilterns loco hauled services with GWR IETs, adding more tracks, higher line speeds and electrification to the Chiltern line.
Absolutely but BoJo wanted a vanity project not an upgraded railway line there not much good for photo ops. The deeper issue is how HS2 will starve all other more worthy transport infrastructure projects.
 

Noddy

Established Member
Joined
11 Oct 2014
Messages
1,642
Location
UK
Plenty of old through roads that could be reopened, adding new tracks where possible to add capacity would be a short term pain for long term gain. As happened with the GWML electrification and redoubling of the Cheltenham to Swindon line.

You mean that completely truncated electrification scheme despite years of cancellations and delays on the route, and the speed increase between Kemble and Swindon that was widely reported and then never happened?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,652
The biggest waste of money for a 15-20 minute gain. The same time saving could have been achieved by reopening the New North Mainline, replacing Chilterns loco hauled services with GWR IETs, adding more tracks, higher line speeds and electrification to the Chiltern line.
Nope. Where is the capacity at Paddington and Birmingham and how do you release capacity on the WCML? You also decimate the Chiltern ridership and revenue as you close it multilple times over several years to do all that.
 

Snex

Member
Joined
20 Jun 2018
Messages
443
London - Birmingham by itself is a lot of money and work for just London - Birmingham, HS2 was packaged with London - Birmingham / Manchester / Leeds to make full use and get a good business case.

If it was at the drawing board I'd have Manchester with through platforms and a Liverpool - Manchester - Leeds section included instead.

Must say, have to agree with this with it extended through to York on the ECML. It's all good building connections to London but when it takes nearly the same time to Manchester from Newcastle as it does London and it's half the distance as the crow flies then it probably should be sorted. It's not as if we're talking about small cities like Aberdeen to Inverness either.

Would also speed up Leeds / York / Newcastle down to the West Midlands which is as equally as painful currently.

Nottingham and Sheffield would arguably benefit with improvements on the Midland Mainline rather than a dogleg via Birmingham.
 

jfowkes

Established Member
Joined
20 Jul 2017
Messages
1,268
Absolutely but BoJo wanted a vanity project not an upgraded railway line there not much good for photo ops. The deeper issue is how HS2 will starve all other more worthy transport infrastructure projects.

HS2 was first conceived of under Labour in 2009 (BJ was Mayor of London) and received royal assent in 2017 (BJ was Secretary of State for Foreign and Commonwealth Affairs). I don't really think he has much to do with it.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
The biggest waste of money for a 15-20 minute gain. The same time saving could have been achieved by reopening the New North Mainline, replacing Chilterns loco hauled services with GWR IETs, adding more tracks, higher line speeds and electrification to the Chiltern line.
That wouldn't do anything for the north or levelling up.
It would just be a faster way of getting to Birmingham.
Widening existing routes doesn't work either, because of the urban destruction en route.
 

Parjon

Member
Joined
27 Oct 2022
Messages
519
Location
St Helens
London - Birmingham by itself is a lot of money and work for just London - Birmingham, HS2 was packaged with London - Birmingham / Manchester / Leeds to make full use and get a good business case.

If it was at the drawing board I'd have Manchester with through platforms and a Liverpool - Manchester - Leeds section included instead.
While reaching Leeds via Manchester was the latest eventual intention (I will save which players were lobbying for this to another day, if there is a point) but why would you go all the way inland and further north to loop back down and arrive in Liverpool.

The geography in connecting us directly was never difficult, the financials even less so. As the developers of the WCML understood

== Doublepost prevention - post automatically merged: ==

That wouldn't do anything for the north or levelling up.
It would just be a faster way of getting to Birmingham.
Widening existing routes doesn't work either, because of the urban destruction en route.
HS2 won't do anything for "the north" and certainly doesn't level anyone up. So saving the money seems like a much better option.
 
Last edited:

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
Fundamentally we had major problems with a disconnect with people never really being able to agree what HS2 was actually for. Nebulous "adding capacity" is all well and good, but isn't that helpful.

Personally I would have preferred the inverse S to the Y, even if we ended up with single ended stations and autoreverse.
All trains stop at all stations on the high speed line.

London, Birmingham, Manchester, Leeds and then on to Newcastle.

As it is, Sheffield demanded the eastern leg be broken to maintain its dominance over Rotherham, and after that there was no point building it at all.
 

matacaster

On Moderation
Joined
19 Jan 2013
Messages
1,646
Location
Huddersfield
The reason that they wanted to build the Birmingham to London bit of HS2 was to increase the size of the land n commuter in belt. People have been moving farther out from London to places like Milton Keynes and bletchley for ages as london property prices became unaffordable. They wanted to get to London in a similar time as they went further out. So Birmingham becomes doable for commuters provided it's high-speed. London sucks in more and more investment and has all the crown jewels. Compare the number of theatres, museums and other attractions to any other region. Working from home has pricked that bubble a bit.
Salford wasa bit of a dump, look what happened when a,few london-based BBC staff were moved there. Salford quays was changed to become like pet of London.

I do not believe that there any real desire to get HS2 to Leeds or Manchester, these sections were just aspirations provided the money hadn't run out by then to appease northern voters. West Country passengers didn't even get that consideration. Journey times to anywhere else than London are rubbish. Look at pretty much the whole of cross country services, Sheffield to leeds by any route etc.

== Doublepost prevention - post automatically merged: ==

Fundamentally we had major problems with a disconnect with people never really being able to agree what HS2 was actually for. Nebulous "adding capacity" is all well and good, but isn't that helpful.

Personally I would have preferred the inverse S to the Y, even if we ended up with single ended stations and autoreverse.
All trains stop at all stations on the high speed line.

London, Birmingham, Manchester, Leeds and then on to Newcastle.

As it is, Sheffield demanded the eastern leg be broken to maintain its dominance over Rotherham, and after that there was no point building it at all.
Perhaps some extra Manchester to London capacity could be created by relinking it to MML via Peak District, some additional 4-tracking and axing some commuter services. Remember it's not about speed!
 
Last edited:

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,995
Location
Surrey
Nope. Where is the capacity at Paddington and Birmingham and how do you release capacity on the WCML? You also decimate the Chiltern ridership and revenue as you close it multilple times over several years to do all that.
Trans Pennine upgrade has multiple closure for years ahead so on your basis by the end of it there will be no passengers left to help pay for it. Umm I think not otherwise there is no point undertaking the project in the first place.

== Doublepost prevention - post automatically merged: ==

HS2 was first conceived of under Labour in 2009 (BJ was Mayor of London) and received royal assent in 2017 (BJ was Secretary of State for Foreign and Commonwealth Affairs). I don't really think he has much to do with it.
Yup fair point but final sanction to go ahead came from BoJo is what I should have explained.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
Perhaps some extra Manchester to London capacity could be created by relinking it to MML via Peak District, some additional 4-tracking and axing some commuter services. Remember it's not about speed!
It's not "about" speed, but the route actually has to be fast enough to be somewhat attractive to the population.

Spending three hours to get to Manchester instead of ~1hr50 via HS2 Phase 1 is not going to go down very well.

At 3 hours people will start to wonder if it is really preferable to driving, or tolerating overcrowding on the existing service.
And good luck getting permission to "axe" commuter services - which will be used by far more people than a slow drag via the MML to London.
 

MarkLong

Member
Joined
20 Sep 2016
Messages
106
It's not "about" speed, but the route actually has to be fast enough to be somewhat attractive to the population.

Spending three hours to get to Manchester instead of ~1hr50 via HS2 Phase 1 is not going to go down very well.

At 3 hours people will start to wonder if it is really preferable to driving, or tolerating overcrowding on the existing service.
And good luck getting permission to "axe" commuter services - which will be used by far more people than a slow drag via the MML to London.
Plus if you upgrade Hope Valley Line into 125mph then the cost would be equally scare off the Treasury.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
Plus if you upgrade Hope Valley Line into 125mph then the cost would be equally scare off the Treasury.
The cost would likely be higher than a new line to finally sort out the Buxton/Hope Valley line mess once and for all!
 