Christchurch is reportedly 28hrs behind. Only rumoured though.
Well I could mention last Christmas at Finsbury Park - have you forgotton? Did the Daily Mail make that up?
But let's not fool ourselves that all negative coverage is unwarranted.
Regardless, there will still be the headlines under the fare rises banner, with reference to the problems LAST Christmas.
If dammage to Lamington Viaduct is as bad as currently thought then the job will I assume be stopped on the Scottish end of the WCML for a while, an ideal target for journos. Other than that ful creddit to all for by and large a smooth and productive festive period.
I'm afraid 'Man does job competently' isn't news.
If dammage to Lamington Viaduct is as bad as currently thought then the job will I assume be stopped on the Scottish end of the WCML for a while, an ideal target for journos. Other than that ful creddit to all for by and large a smooth and productive festive period.
We are dealing with a railway network that's rapidly approaching 200 years old, built by a vast array of different companies, with different engineering approaches, some of it was built to very different gauges, things will go wrong, now the issues at Finsbury Park drifted from being a problem with physical railway to being a planning and preparedness problem, but ultimately, it was slower than expected progress which was the underlying problem, and not being able to accurately predict progress on engineering projects is a recurring problem which is not at all easy to crack, whether it's an overnight or weekend possession, or a bigger Christmas or Easter project.
The reality of the situation is this - no matter how many ground surveys and core samples you take, no matter how much planning and preparation you put into engineering works, something will catch you out or slow you down.
I have often wondered, and sometimes questioned, how the timetable for a job - any job - is established.
The coverage last year was well over and above what was justified or appropriate, and it contributed to what can only be described as a clusterf**k of epic proportions.
I don't really understand why they can't employ transport or railway correspondents who actually understand the situation and relay accurate information to their readers, the imbeciles, one of whom can't get the abbreviation correct for the Department for Transport, pass on incorrect information or fail to explain the issues, cause passengers to become confused and in turn angry, creating a self perpetuating problem.
Yes, thanks Joseph Locke, I know a bit about it - we had programmers on the management group at Northampton.
My point is this: "Job running late - naughty contractors"!
Maybe not. What about:
"Job running late - programme wrong!"
I don't really understand why they can't employ transport or railway correspondents who actually understand the situation and relay accurate information to their readers, the imbeciles, one of whom can't get the abbreviation correct for the Department for Transport, pass on incorrect information or fail to explain the issues, cause passengers to become confused and in turn angry, creating a self perpetuating problem.
And so ultimately they produce "A Programme" for the works which the orange-clad staff on the ground have to adhere to, somehow, and inevitably fall behind of! So in my opinion there are two facets to the "Falling behind schedule" thing - maybe we should consider the competence of the programme WRITER as well.
Newspapers all over the country will be polishing up their template stories. You know the one the one generated by the Clichés R Us App that begins.
"Angry/furious/outraged/disgusted rail commuters were angry/furious/outraged/disgusted when their journey to work was cancelled/delayed/slightly late following improvement works to the railways during the Christmas break. Insert passenger name here - insert age - insert Facebook status".
Don't forget the following editorial principles:
(Under no circumstance ask passengers whether they have looked outside the window during their week's break, watched the news or read a paper mentioning the storm damage. Don't ask them about the long shifts that PW and S&T staff have been putting in to make sure that as far as possible everything is back in place for the start of service and whether they would like the job.
Under no circumstances ask them when else they would like the work to be done)
(Don't forget to interview the local MP - capture every voter schmoozing expression of sympathy and promise that heads will roll for this.)
(If you have the faintest idea of how railways work disqualify yourself from this assignment)
Perhaps Forum Members might like to name and shame the most inept rail related stories they come across.
It needs someone of Alan Williams (esque) stature or Roger Ford .
Also, on the subject of railway employees not receiving praise when they get it right, (and they get it right most of the time to be fair) most people don't get praise when they perform well in their jobs, they get paid.
That's strange because every time I am served in a shop etc I always say thank you
'they get paid' is all they deserve! :roll:
In fairness to the mass media, they sometimes do call on the expertise of such specialists. Certainly Roger Ford (@CaptainDeltic) is sometime quoted.
They mainly quote Woemar
Definitely needs to talk about 'railway bosses' as well. The media love talking about 'railway bosses'.
...do they a) not have a plan which they are measuring progress against
As it stands on Saturday evening, do we know whether NR are on target to open for business on Monday - or do they a) not have a plan which they are measuring progress against or b) are behind schedule but are scared of making it public?
Said article must also contain the word "slammed" "admitted" and reference to Network Rail bonuses
Are they the same as the "hard working families" politicians seem to love
Quite. I don't think the media was responsible for the 'shambles' (an appropriate use of the word) we saw last year. As a railway passenger and a tax payer I'm quite pleased the media put pressure on over bonuses. I think it would be highly inappropriate for senior executives to receive rewards after presiding over such a mess.
Also, on the subject of railway employees not receiving praise when they get it right, (and they get it right most of the time to be fair) most people don't get praise when they perform well in their jobs, they get paid. I'm afraid 'Man does job competently' isn't news. That said, I am happy to give my praise and thanks to all the men and women who do good work 24/7 to keep our railway operating smoothly and I wish them all a happy new year.
I'm not here to defend the Daily Mail, or the rest of the media, they are guilty of sensationalism and exaggeration on a regular basis. But let's not fool ourselves that all negative coverage is unwarranted.
Don't forget "hard pressed commuters," whatever that means. Up against each other presumably?
Slightly off topic but I always smile when the Daily Hate Mail etc. state that it is the Taxpayer that pays for the welfare benefits to the poor, but it is the government that funds major capital projects.
So who will the the Street of Shame claim has paid for the engineering work over the holiday period?