MML Electrification: progress updates

Status
Not open for further replies.

hwl

Established Member
Joined
5 Feb 2012
Messages
8,235
Posted on Facebook in Bentley systems account.

‘The Midland Main Line (MML) is a major railway line in the UK that carries more than nine million passengers a year between London and Sheffield. This well-traveled stretch of rail is getting an electrifying upgrade.⚡

The Midland Main Line electrification (MMLE) program is a multidiscipline infrastructure project to increase capacity and provide a full overhead electrified route between London and Sheffield. Once completed it will be a significant step towards a cleaner energy mix for more sustainable travel in the UK.

SPL Powerlines UK, in partnership with Network Rail, was tasked with installing 447 single-track kilometers of overhead line equipment along the historic railway corridor.

SPL used Bentley software as the basis for its connected data environment, sending and receiving information from 20 design organizations working on the project. They also created an iTwin to improve the visibility of all design data further. The improved collaboration among stakeholders helped reduce site walkouts by 94%, ensuring safety while reducing carbon emissions and project costs.

Continued progress towards electrifying the MML helps support the UK’s net zero carbon emissions target and allows passengers to benefit from quieter, greener journeys.

#digitaltwins #energy #rail #transportation #engineering #infrastructure #sustainability’

Someone else can do the maths to determine the extent.
<back of envelope>

The key question is how much north of Bedford has already been included:
Bedford - Glendon Jn ~159stkm
Glendon Jn - Corby ~18stkm
Glendon Jn Wigston South ~70stkm

So potentially 244 stkm "recently installed" leaving at worst 201stkm, If just Glendon Jn - Wigston South included then 378stkm outstanding.


Wigston South - Trent South Jn will be at least 130 stkm
Trent South Jn - Chesterfield South Jn via Derby will be at least 105 stkm (excluding track inside Etches Park)
Trent South Jn - Nottingham will be at least 35 stkm (excluding track inside Eastcroft)
Chesterfield South Jn - Sheffield will be at least 66 stkm (suitably north of station excluding carriage sidings)
So a bare minimum of 336stkm extra new mainline electrification

447-336 = 111stkm. So if the recent Glendon Jn Wigston South ~70stkm is included that still leaves 41stkm for sidings...

An out of scope comparison: a bare minimum Erewash Valley for through freight would be ~80stkm.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,455
Location
Preston Lancs
<back of envelope>

The key question is how much north of Bedford has already been included:
Bedford - Glendon Jn ~159stkm
Glendon Jn - Corby ~18stkm
Glendon Jn Wigston South ~70stkm

So potentially 244 stkm "recently installed" leaving at worst 201stkm, If just Glendon Jn - Wigston South included then 378stkm outstanding.

Wigston South - Trent South Jn will be at least 130 stkm
Trent South Jn - Chesterfield South Jn via Derby will be at least 105 stkm (excluding track inside Etches Park)
Trent South Jn - Nottingham will be at least 35 stkm (excluding track inside Eastcroft)
Chesterfield South Jn - Sheffield will be at least 66 stkm (suitably north of station excluding carriage sidings)
So a bare minimum of 336stkm extra new mainline electrification

447-336 = 111stkm. So if the recent Glendon Jn Wigston South ~70stkm is included that still leaves 41stkm for sidings...

An out of scope comparison: a bare minimum Erewash Valley for through freight would be ~80stkm.
Very useful summary indeed thank you.
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,472
More closure dates for south-of-Bedford OLE upgrades have been added to the Network Rail page, some of which are already publicised:

* 7/8 December 2024 (north of Luton)
* 21-29 December 2024 (south of Luton)
* 16 February 2025 (north of Luton; RTT implies usual RotR* overnighter for now)
* 22/23 February 2025 (north of Luton)
* 1/2 March 2025 (south of Luton)

In addition, 8/9 & 15/16 March 2025 look like south-of-Luton closures on RTT so there may be a rather packed programme of OLE125 works in the latter stages of winter.

[ * Rules of the Route]
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
I found this debate, which was posted on Thursday the 21st of November. A response stated that full electrification to Nottingham and Sheffield via Derby is to be completed by the ‘early 2030s, subject to business case approvals and wider affordability considerations.’

Unless we have a continuous rolling electrification program for the MML, I find this very dubious. There are too many ‘pauses’ between electrification projects, which is no good for costs, skilled labour and keeping to expected time frames.

Neil O’Brien
(Harborough, Oadby and Wigston) (Con)

Share this specific contribution
3. What recent estimate she has made of when electrification of the midland main line will be complete.

The Parliamentary Under-Secretary of State for Transport
(Lilian Greenwood)

Share this specific contribution
The electrification of the remainder of the route to Nottingham and Sheffield via Derby—the midland main line electrification programme—is in development, and currently it is planned to be completed by the early 2030s, subject to business case approvals and wider affordability considerations.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,431
Location
Sheffield
I found this debate, which was posted on Thursday the 21st of November. A response stated that full electrification to Nottingham and Sheffield via Derby is to be completed by the ‘early 2030s, subject to business case approvals and wider affordability considerations.’

Unless we have a continuous rolling electrification program for the MML, I find this very dubious. There are too many ‘pauses’ between electrification projects, which is no good for costs, skilled labour and keeping to expected time frames.
As I've been saying for many months, including face to to face to Huw Merriman, that means at some date after 2035 if we're lucky. He didn't disagree. He knew as well as anyone how the railway works, or doesn't. I may live to see it to Sheffield, but I'm having doubts. These Parliamentary statements mean nothing.
 

apinnard

Member
Joined
2 Aug 2017
Messages
378
Location
Kettering
Extra 7-8 minutes on the slow between Bedford and Wellingborough. Also it goes from 4 aspect to 3 aspect signalling on the fast at Wellingborough and that slows things down a fair bit if trains are close together.
Is there still that bridge on the slows near Bedford with the very tight speed restriction?
 

baz962

Established Member
Joined
8 Jun 2017
Messages
3,664
Yes 20 mph on the Up (southbound).
But the majority of the slows are 50 with some 75 between Bedford and Wellingborough. 110 , 115 and 125 on the fast.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,230
A ridiculously elongated and stop start timetable, but the government will want to have some progress before the next election. A number of marginal seats in the East Midlands...
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,455
Location
Preston Lancs
A ridiculously elongated and stop start timetable, but the government will want to have some progress before the next election. A number of marginal seats in the East Midlands...
Correct. I guarantee there will be some progress northwards even if it is not what most of us on this forum would like ideally.
 

Yindee8191

Member
Joined
16 Mar 2019
Messages
181
Happened to walk over the Welford Road overbridge a little south of LEI today and there were a couple of wooden pegs in the ground by the tracks (see attached photo). Not sure whether it’s electrification-based. If they are pile locations they seem badly placed though, they seem to be in positions that would obstruct future four-tracking, which I’m fairly sure Network Rail is planning for. IMG_9063.jpeg
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,472
Happened to walk over the Welford Road overbridge a little south of LEI today and there were a couple of wooden pegs in the ground by the tracks (see attached photo). Not sure whether it’s electrification-based. If they are pile locations they seem badly placed though, they seem to be in positions that would obstruct future four-tracking, which I’m fairly sure Network Rail is planning for.
They are indeed markers for mast piles, and their placement in line with the existing layout corroborates posts #6722 & #7184.

Looking elsewhere, this picture on Flickr provides a comparison between the original single-track cantilevers and 125mph-compatible versions (both Mk3).

On the Corby branch, another Class 810 changeover zone has been designated (extract from December 2024 NESA).

LNE3601 001 diagram.jpeg
 

Chris 76

Member
Joined
21 Jul 2017
Messages
72
Location
Moseley, Birmingham
the government will want to have some progress before the next election. A number of marginal seats in the East Midlands...
Yes. I thought that with Louise Haigh being Transport Secretary and a Sheffield MP, the prospects were good for full electrification to Sheffield being at least underway by the next election. She's gone, but it must be done to Derby and Nottingham. There's great regional political interest and pressure for this, and you'd hope that Great British Railways would want their HQ city to be electrified.
The economic case for electrification should be boosted by the potential for replacement of diesel local and regional services with battery electric (BEMU) trains. Electrification at Leicester, Derby and Nottingham would provide BEMU terminal recharging for all East Midlands Regional routes, plus Northern's Leeds-Nottingham, and Cross-Country's Nottingham-Birmingham-Cardiff and Stansted-Leicester-Birmingham. Now that Chiltern is talking about partial electrification and BEMUs, Cross Country is the only remaining all-diesel operator to be silent (to my knowledge) on how it will and must electrify.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Yes. I thought that with Louise Haigh being Transport Secretary and a Sheffield MP, the prospects were good for full electrification to Sheffield being at least underway by the next election. She's gone, but it must be done to Derby and Nottingham. There's great regional political interest and pressure for this, and you'd hope that Great British Railways would want their HQ city to be electrified.
The economic case for electrification should be boosted by the potential for replacement of diesel local and regional services with battery electric (BEMU) trains. Electrification at Leicester, Derby and Nottingham would provide BEMU terminal recharging for all East Midlands Regional routes, plus Northern's Leeds-Nottingham, and Cross-Country's Nottingham-Birmingham-Cardiff and Stansted-Leicester-Birmingham. Now that Chiltern is talking about partial electrification and BEMUs, Cross Country is the only remaining all-diesel operator to be silent (to my knowledge) on how it will and must electrify.
Is there any precedent for a Transport Secretary ever producing major rail benefits for their own constituency? I thought there were government rules in place to prevent such focussed decision making. For a start the treasury would never be a walkover.
 

slowroad

Member
Joined
23 Jul 2021
Messages
371
Location
Wales
Correct. I guarantee there will be some progress northwards even if it is not what most of us on this forum would like ideally.
Will there be any discernible benefits for passengers? I live in South Wales and travel regularly to London. I think the only difference most passengers would notice in recent years is not having to lean out to open doors. (I am deliberately keeping away from the topic of seat bases.)
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,431
Location
Sheffield
Is there any precedent for a Transport Secretary ever producing major rail benefits for their own constituency? I thought there were government rules in place to prevent such focussed decision making. For a start the treasury would never be a walkover.

In any event there will be many reasons produced to delay work from Derby into Sheffield. Not least is the cost and complexity of work to provide extra track capacity from Chesterfield through Dronfield and Bradway Tunnel then down the Sheaf Valley into Sheffield.

Reconfiguring at the south end of Sheffield knocks on to the north end. A cheap and simple electrification project that is not. Prevarication and delay inevitable I'm afraid. If it's fully electrified by 2035 I'll be very pleasantly surprised. Those bi-modes will be needed for longer than suggested when the procurement process began.
 

slowroad

Member
Joined
23 Jul 2021
Messages
371
Location
Wales
In any event there will be many reasons produced to delay work from Derby into Sheffield. Not least is the cost and complexity of work to provide extra track capacity from Chesterfield through Dronfield and Bradway Tunnel then down the Sheaf Valley into Sheffield.

Reconfiguring at the south end of Sheffield knocks on to the north end. A cheap and simple electrification project that is not. Prevarication and delay inevitable I'm afraid. If it's fully electrified by 2035 I'll be very pleasantly surprised. Those bi-modes will be needed for longer than suggested when the procurement process began.
Surely you can just replace the generators with batteries and abandon the difficult bits.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,008
Location
St Albans
But it’s pretty clear there soon will be, so it would be crazy to spend now on electrifying difficult bits.
But a lot less clear when a) decisions were being made about the main GWR electrification project and b) when there was budget to do something about it.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
In any event there will be many reasons produced to delay work from Derby into Sheffield. Not least is the cost and complexity of work to provide extra track capacity from Chesterfield through Dronfield and Bradway Tunnel then down the Sheaf Valley into Sheffield.

Reconfiguring at the south end of Sheffield knocks on to the north end. A cheap and simple electrification project that is not. Prevarication and delay inevitable I'm afraid. If it's fully electrified by 2035 I'll be very pleasantly surprised. Those bi-modes will be needed for longer than suggested when the procurement process began.
Sheffield will have to be sorted at some point anyway won’t it?
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,326
Location
Nottingham
Sheffield will have to be sorted at some point anyway won’t it?
Maybe. Or bypassed: the orginal plan for HS2 to have a through station at Meadowhall would have solved the problem, but relegated Sheffield to a local node on the national network. For which two tracks to the south and two tracks to the north would have been quite adequate.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,431
Location
Sheffield
Maybe. Or bypassed: the orginal plan for HS2 to have a through station at Meadowhall would have solved the problem, but relegated Sheffield to a local node on the national network. For which two tracks to the south and two tracks to the north would have been quite adequate.

George Stephenson bypassed Sheffield when surveying for Derby to Leeds in the 1830s. The route down the Sheaf Valley followed 30 years later with Sheffield effectively on a branch line until the 187Os.
 

Yindee8191

Member
Joined
16 Mar 2019
Messages
181
They are indeed markers for mast piles, and their placement in line with the existing layout corroborates posts #6722 & #7184.

Looking elsewhere, this picture on Flickr provides a comparison between the original single-track cantilevers and 125mph-compatible versions (both Mk3).

On the Corby branch, another Class 810 changeover zone has been designated (extract from December 2024 NESA).

View attachment 170274
Good to hear there’s progress in the works, but surely NR wouldn’t have designed a project which precluded four-tracking when that’s on the agenda for the next decade or so?
 

Chris 76

Member
Joined
21 Jul 2017
Messages
72
Location
Moseley, Birmingham
Is there any precedent for a Transport Secretary ever producing major rail benefits for their own constituency? I thought there were government rules in place to prevent such focussed decision making. For a start the treasury would never be a walkover.
All MPs lobby for constituency projects and try to keep them on government radar, especially during spending reviews and negotiations. That doesn't mean Louise Haigh would have secured full MML electrification to Sheffield, but her influence may have had some effect. Interesting that coverage of John Prescott's death mentioned Hull Trains as part of his legacy. Not all down to him, of course, but he helped local leaders and business interests get their case heard in Whitehall.
 

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
But it’s pretty clear there soon will be, so it would be crazy to spend now on electrifying difficult bits.
It’s all very well electrifying the easy bits (plain line) but, when the s*** hits the fan, trains will be held in stations where the batteries can run down if there are no wires. It’d be more responsible to electrify the stations and a few miles either side and leave the plain line for later given that the greatest current draw is accelerating away from a stop. However, having done that, the cost of completing the job would be marginal. On top of that, the overheads etc would have to be updated to accommodate normal traction AND fast charging. KISS!
 

slowroad

Member
Joined
23 Jul 2021
Messages
371
Location
Wales
O
It’s all very well electrifying the easy bits (plain line) but, when the s*** hits the fan, trains will be held in stations where the batteries can run down if there are no wires. It’d be more responsible to electrify the stations and a few miles either side and leave the plain line for later given that the greatest current draw is accelerating away from a stop. However, having done that, the cost of completing the job would be marginal. On top of that, the overheads etc would have to be updated to accommodate normal traction AND fast charging. KISS

It’s all very well electrifying the easy bits (plain line) but, when the s*** hits the fan, trains will be held in stations where the batteries can run down if there are no wires. It’d be more responsible to electrify the stations and a few miles either side and leave the plain line for later given that the greatest current draw is accelerating away from a stop. However, having done that, the cost of completing the job would be marginal. On top of that, the overheads etc would have to be updated to accommodate normal traction AND fast charging. KISS!
Well, what I suggested is very similar to what TfW is doing on suburban lines. If it works, why would anyone do difficult bits again?
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,573
Location
Croydon
Anyone think full MML electrification will only happen when the class 810 Bi-Modes are coming up to the end of their life ?.
Optimistically the 810s would get moved on to another partially electrified route earlier thus hastening full electrification.
A bit like Cardiff to Swansea has not happened - yet.
 