I was in Corby today, and was able to take some pictures of the dualling works on the station area.
 

Attachments

  • IMG_20170328_112002.jpg
    IMG_20170328_112002.jpg
    175.8 KB · Views: 234
  • IMG_20170328_112007.jpg
    IMG_20170328_112007.jpg
    237.7 KB · Views: 229
  • IMG_20170328_112124.jpg
    IMG_20170328_112124.jpg
    183.9 KB · Views: 204
  • IMG_20170328_112134.jpg
    IMG_20170328_112134.jpg
    128 KB · Views: 201
  • IMG_20170328_112139.jpg
    IMG_20170328_112139.jpg
    209.4 KB · Views: 206
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,084
Thanks for the pics Mordac.
Presumably the timescale for putting the fourth line back Kettering to Leicester is realistic as it will not be too great a job as there were four tracks before 1970 ish??
 

Rob F

Member
Joined
17 Dec 2015
Messages
453
Location
Notts
I believe the four tracks were in place right up to the Leicester area resignalling in the 80s.

Rob
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,612
Location
Nottingham
Correct - in my experience usually near Kettering, rather than on the cross over just north of Wellingborough station.

Yes, the overtake is usually close to Kettering but I assume the Corby train is crossed over north of Wellingborough.

I was on the 1732 from Nottingham to London which overtook a southbound train on the slow somewhere north of Wellingborough.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,612
Location
Nottingham
I believe the four tracks were in place right up to the Leicester area resignalling in the 80s.

Rob

Yes. Leicester re-signalling removed two tracks between Wellingborough and Kettering and one track between Sharnbrook and Wellingborough and through Leicester. All are now proposed to be reinstated.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Yes. Leicester re-signalling removed two tracks between Wellingborough and Kettering

Eh? Are you saying there were 5 tracks between Wellingborough and Kettering?

There are still 3 tracks in place from Wellingborough to just south of Kettering....
 

Senex

Established Member
Joined
1 Apr 2014
Messages
2,956
Location
York
Eh? Are you saying there were 5 tracks between Wellingborough and Kettering?

There are still 3 tracks in place from Wellingborough to just south of Kettering....
The third track between Harrowden Jn and Kettering South Jn was put back just a few years ago -- under the Leicester MAS scheme the third and fourth tracks between those two locations had come out.
 

Robertj21a

On Moderation
Joined
22 Sep 2013
Messages
7,691
Thanks for the pictures, sorry if it's already been covered but is a second platform on the cards?

Are the Corby trains actually very busy - I've only seen a very few on board during the day. Presumably, the only volume is at the peaks ?
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
8,303
Location
Back in Sussex
No its not... There will be the ability for a down train to pass another train whilst it's in the platform on the up line, or a down train to be held there whilst another passes via the up line through the platform... The platform on the down is whats left of the former platform when Corby trains last ran in the late 80's/early 90's...

That's the way I was looking at it as well, as of the last time I was at Corby, in 2010, you could have managed with a telephone box rather than the platform anyway, hopefully things have picked up since
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,348
Location
Leicester
Heading north out of Leicester, between Leicester and Syston on the right hand side, I have just seen five or six (demo?) OHLE pilings?
 

Kneedown

Established Member
Joined
29 Dec 2007
Messages
1,837
Location
Nottinghamshire
Heading north out of Leicester, between Leicester and Syston on the right hand side, I have just seen five or six (demo?) OHLE pilings?

Drove the route today amd saw no evidence of any pilings or other work. Saw some inspection covers for drainage troughing that could be mistaken for piling?
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,084
There seems to be some work going on at the North end of Market Harborough Station car park - possibly the start of the re-alignment of the line and rebuilding of the station?
 

LTJ87

Member
Joined
1 Jun 2008
Messages
163
I'd be interested to hear views on whether the claims in this story are true.

I thought extra capacity was to be added at London St Pancras together with additional track between Bedford and Kettering?

http://www.nottinghampost.com/anoth...o-get-longer/story-30310958-detail/story.html

Next year, Thameslink, the services south of Bedford to Brighton which embrace London suburbs and its commuter belt, will see the completion a £7 billion modernisation programme including new stations, extended platforms, new and longer trains and more frequent services.

Thameslink plans to step up the frequency of trains running out of London to Bedford, Luton and St Albans using the Midland Mainline to 16 trains an hour.

These are the same lines used by East Midlands Trains, the operator on the Midland Mainline.

Rail industry experts are trying to work out a timetable which fits the 16 Thameslink trains and EMT's existing services onto the same tracks while maintaining timetables.

The problem is that new electric Class 700 trains ordered for Thameslink – 115 are on order – do not go as fast as those used by East Midlands Trains, the 15 year old Meridian fleet and ageing High Speed Trains (Intercity 125), now nearly 40 years old. EMT trains run at 125mph and Thameslink's Siemens Class 700 at 100mph.

In crude terms, Thameslinks can only run 16 trains an hour if EMT trains run more slowly so they don't crash.

The complexity does not stop there. First, the trains are timetabled together to Bedford but going north to Leicester, Nottingham and beyond, EMT's trains will have to weave round other trains and freight, possibly missing their timetable path.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
There's a piece by Roger Ford in the current issue of Modern Railways which goes into more details on the points in the article you quote.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
I'd be interested to hear views on whether the claims in this story are true.

I thought extra capacity was to be added at London St Pancras together with additional track between Bedford and Kettering?

http://www.nottinghampost.com/anoth...o-get-longer/story-30310958-detail/story.html

"In crude terms, Thameslinks can only run 16 trains an hour if EMT trains run more slowly so they don't crash."

My bold from quote. I think 'clash' was the word the reporter should have used.:D
 

civ-eng-jim

Member
Joined
16 Jul 2011
Messages
405
Location
UK
"In crude terms, Thameslinks can only run 16 trains an hour if EMT trains run more slowly so they don't crash."

My bold from quote. I think 'clash' was the word the reporter should have used.:D

It does appear the article was written by a 7 year old...
 

kevjs

Member
Joined
4 Sep 2013
Messages
469
It does appear the article was written by a 7 year old...

It's the Nottingham Post - what do you expected. Amazed you can read it considering the amount of advertising they plaster all over the site (impossible to read on mobile) :roll:
 

LLivery

Established Member
Joined
13 Jul 2014
Messages
1,711
Location
Southeastern land
It does appear the article was written by a 7 year old...

To be fair its more in depth to what the Evening Standard would provide.

Anyway, the jist of it on a whole doesn't seem to be incorrect. High frequency TL trains at 100mph vs InterCity trains at 125mph will provide clashes. Everyone knows this and has known this since Thameslink trains began using the fasts - it's common sense.

Crazy idea (actually not that crazy), if you upgraded the freight line from West Hampstead to Hendon, installing high speed points from the freight to fasts at Hendon, InterCity services could overtake a Thameslink fast stopping at West Hampstead or the future Brent Cross. Would that be cost effective or practical?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Everyone knows this and has known this since Thameslink trains began using the fasts - it's common sense.
From the first sentence of the Modern Railways item I mentioned:
Network Rail Director Chris Gibb is leading an Industry Readiness Board belatedly trying to resolve the problem that Thameslink forgot.

And a bit further in:
Which, in passing, raises the question, how can a multi-billion project, which was once known as Thameslink 2000, be a year away from service entry with a timetable that doesn't work in network terms?
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,905
Location
North
From the first sentence of the Modern Railways item I mentioned:


And a bit further in:

Who could forget to include in the new Southwestern franchise documents that 707s must be used, but some faceless civil servant at the DfT did. Mega blunder that we the public will have to pay for. He will probably be promoted and given a knighthood.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,612
Location
Nottingham
Who could forget to include in the new Southwestern franchise documents that 707s must be used, but some faceless civil servant at the DfT did. Mega blunder that we the public will have to pay for. He will probably be promoted and given a knighthood.

I have no doubt this was entirely deliberate. But not for this thread.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
To be fair its more in depth to what the Evening Standard would provide.

Anyway, the jist of it on a whole doesn't seem to be incorrect. High frequency TL trains at 100mph vs InterCity trains at 125mph will provide clashes. Everyone knows this and has known this since Thameslink trains began using the fasts - it's common sense.

Crazy idea (actually not that crazy), if you upgraded the freight line from West Hampstead to Hendon, installing high speed points from the freight to fasts at Hendon, InterCity services could overtake a Thameslink fast stopping at West Hampstead or the future Brent Cross. Would that be cost effective or practical?

The other way to look at it is re-visit how the lines are paired - in this scenario the approach used on the GN lines of pairing by direction rather than by Slow / Fast makes it easier to allow trains to 'leapfrog' because you don't have block an oncoming line e.g.

The GN lines have <up slow><up fast><down fast><down slow>, whereas the Midland approach is <up slow><down slow><up fast><down fast>.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,890
Location
Fenny Stratford
From the first sentence of the Modern Railways item I mentioned:


And a bit further in:

Perhaps because the project scope had to be delivered in line with the available funding. That is what can happen in the real world. Something the august Modern Railways often seems to overlook
 

John Webb

Established Member
Joined
5 Jun 2010
Messages
3,749
Location
St Albans
The other way to look at it is re-visit how the lines are paired - in this scenario the approach used on the GN lines of pairing by direction rather than by Slow / Fast makes it easier to allow trains to 'leapfrog' because you don't have block an oncoming line e.g.

The GN lines have <up slow><up fast><down fast><down slow>, whereas the Midland approach is <up slow><down slow><up fast><down fast>.
But to alter the pairing of the lines has significant cost implications for resignalling - and difficult to implement south of Bedford due to the turn-back arrangements at Luton and St Albans City, I would have thought?
 

richieb1971

Established Member
Joined
28 Jan 2013
Messages
2,047
Almost every station on the slows has line alignment which curves around the currently existing platform. Whilst the fasts are straight through.

To keep line speed on the Up fast (under the new pairing) would require that every single station which has this curve be taken out to maintain speed. I doubt a train can do 125mph on the slow line where these curves exist. Or am I wrong?

9283087082_a40f573dd3_b.jpg


The slow lines here at Oakley are apparently going to be realigned. But in this case, no station currently exists.
 