December 2008. They are at Brush now for engine changes IIRC.
Most of them are still and Doncaster.
December 2008. They are at Brush now for engine changes IIRC.
Sadly its a good idea in theory but doesnt work in practise. This is a map of the trowell area just south of nottingham. A high speed line could only be built through with extensive demolition or tunnelling
No, it's just you!
Billions are being spent on the railways across the country, and don't forget Thameslink and Crossrail, so this 'anti railway' government has actually agreed to build new railways...
No, it's just you!
Billions are being spent on the railways across the country, and don't forget Thameslink and Crossrail, so this 'anti railway' government has actually agreed to build new railways...
Question from Councillor Mike Thomas – concern about cross country train service franchise proposals to Scotland.
DfT seeking to make best use of resources. Surveys show passenger numbers travelling from Scotland to South West and vice versa are small and have fallen dramatically in recent years. Average length of cross country journey is only 80 miles.
That would be well, but slots on FCCTL wont mix with freight. Maybe extending the wires north of Bedford could help. Creating new opportunities for FCC, and with the new stock for FCCTL more services.
It could get to Nottingham, but the fact that much of the line through Leicester City Centre is built on, the track is privatly owned from Birstall to Ruddington, and the section into Nottingham has sections that are or will in future be part of the tram system, and Victoria station is now a car park, would make things difficult. The ruining of the only double track mainline preserved railway in the country, and of an inportant part of the Nottingham tram system, both present and future, in particular would not go down well. Then again, what is the track bed like from Calvert to Rugby, and how much work would be required to re-instate it?
Please no !!!! At the moment places like Wellingborough and Kettering get a half-decent quick service to London c/o EMT. Electrify northwards and we'll end up with a stop-everywhere EMU
--- old post above --- --- new post below ---
Depends on your definition of a "shack".
They're virtually all Meridians, but those are infinitely preferable to the option of a stopping Cl 319 or 350.
Don't call at West Hampstead Thameslink do they?
I think that was the point...Ermm, since when have any EMT services stopped there?
Owned would be the expression!I think that was the point...
Owned would be the expression!
I think he means All-shacks expresses meaning all shacks north of Bedford, i.e Wellingborough/Kettering/Market Harborough/Leicester/Loughborough/randomplace 1/randomplace 2 etc..
Owned would be the expression!
I think he means All-shacks expresses meaning all shacks north of Bedford, i.e Wellingborough/Kettering/Market Harborough/Leicester/Loughborough/randomplace 1/randomplace 2 etc..
If you go through some of the villages in the Warks / Northants borders e.g. Woodford Halse you can still clearly see where the railway was.
As we are talking about EMT services, I would of thought that it might of been clear I meant the EMT stopping pattern.
But to clear it up, Wellingborough and Kettering mostly get all Shack services anyway. For example. They get the services as Jamie stated that stop at Bedford, Wellingborough, Kettering, Market Harborough, Leciester, Loughborough then onto Beeston and Nottingham.
So moaning that you don't want the MML to be electrified because Wellingborough and Kettering will get stopper services is void. But still, just because it gets electrified doesn't mean the FCC units will stop everywhere.
Wellingborough -> Bedford -> Luton Airport Parkway/Luton -> St Albans -> St Pancras International (Low level) -> Onto Brighton.
I reckon what would be more likely if the MML was electrified to either Kettering, Corby or Leicester is the services to Wellingborough / Kettering would be all stations to Luton / Luton Airport then fast into London, which would be a degradation from what is provided today, particularly as it would either be Cl 319, 350 or 377s compared to currently Meridians and HSTs
That's what, three extra stops which may add about 10mins or so if that. Also, I'd say all EMU's have quicker acceleration than any DMU (maybe not the 185). The max Line speed is about 100/110 between Leicester and Luton so wouldn't loose that much speed either. But you would still have your EMT services going north of these electrified places.
So you would keep your Leicester -> London semi fast/fast services, and loose 10mins or so if you went from Kettering/Wellingborough via FCC which of course if those 10mins are too time costing, you can get the EMT services.
Except it's highly unlikely that EMT would keep their stopping pattern unchanged, with Wellingborough and Kettering losing out. It would depend where the electrification went to - if only Kettering then Wellingborough would definately lose it's EMT services and be lumbered with FCC. If the wires went to Leicester then I reckon Market Harborough and Kettering would also lose their EMT services.
There's no way that EMT would continue a 2tph service if FCC were also providing. Instead they'd probably seek to speed up Leicester - London services.
Unfortunately government spending on railways infrastructure assumes that in the south west the railway ends at Exeter,not surprisingly traditional longer distance rail use here is now in decline as vastly improved road and air links inceasingly take up the slack left by a backsliding railway in much of Devon/Cornwall.For instance since Crosscountry stopped running direct From the south west to the North west I have been told by a train manager they are not carrying half the passengers they did.FGW is also struggling big time from Plymouth in particular,the infrastructure and not the trains being the problem here.Plymouth to Exeter 52 rail miles with line speeds of 55/60mph between Newton Abbott and Plymouth now compares very unfavourably with the road equivelent the A38 Devon Expressway,ie 45 miles at 70/80 mph.
Except it's highly unlikely that EMT would keep their stopping pattern unchanged, with Wellingborough and Kettering losing out. It would depend where the electrification went to - if only Kettering then Wellingborough would definately lose it's EMT services and be lumbered with FCC. If the wires went to Leicester then I reckon Market Harborough and Kettering would also lose their EMT services.
There's no way that EMT would continue a 2tph service if FCC were also providing. Instead they'd probably seek to speed up Leicester - London services.
I believe you are worrying about nothing there. Services north of Bedford are not within FCC's remit. They are within the remit of EMT and no-one else. A more likely scenario would be the shortened formations of the ICE programme.
The electrification of the entire MML is long, LONG overdue!
Electrification through to Corby was on the plans for many years but flounded during the recession in the 90's. Once Thameslink 2011 is complete theres no reason why it couldnt be back on the agenda. To me a 377 in 2+2 seating like the 377/1s and /3s used on the Brighton Express would be far superior to a Meridian especially on a line with a line speed of 100-110 mph like the MML.