Sorry if I am repeating another topic...
Does anyone know why there are lots of orange men around the sidings at Miles Platting (Manchester side of the junction on the south)?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ships

Member
Joined
25 Apr 2013
Messages
338
Some siding where to be used for Northern hub related works, I'm not sure if it was these! The ones I'm thinking of had a rather large traveler encampment which the BTP didn't want to move
 

ajdunlop

Member
Joined
25 Jan 2009
Messages
218
There seems to be lots of diggers doing groundwork there, as if they are preparing the site for development. Doesn't look like just a storage area for electrification. Unless they are improving access ready for electrification west of Victoria.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,628
Location
Rochdale
Have these sidings ever been used since they were relayed back in late 90s? On the diagram its has had "no go" in the signal birth for about the last 4 years so not much use recently!

I presume there was a plan for them at one point otherwise it seems alot of effort for a line that ends in a half demolished viaduct at one end and demolished stone terminal at the other!!
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Have these sidings ever been used since they were relayed back in late 90s? On the diagram its has had "no go" in the signal birth for about the last 4 years so not much use recently!

I presume there was a plan for them at one point otherwise it seems alot of effort for a line that ends in a half demolished viaduct at one end and demolished stone terminal at the other!!

It was retained after an objection from the freight operators on the basis the stone terminal might be brought back into use.

To my knowledge it has never been used by a full train since we finished the ballasting-up in 1997.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,906
Location
North
It was retained after an objection from the freight operators on the basis the stone terminal might be brought back into use.

To my knowledge it has never been used by a full train since we finished the ballasting-up in 1997.

I don't know the area that well but would this work prevent easing of Miles Platting curve to anything above 20mph?
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,628
Location
Rochdale
Thanks for the Mr Locke. Deltic I doubt any alterations of the curve can occur as its mostly on a high embankment and trains are either coming slowly up the bank or slowing for a yellow or red on the approach to Victoria.

So this depot for the OHLE, is it a just a temporary thing or a proper long term maintenance location, least the sidings will finally see some use.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,906
Location
North
Thanks for the Mr Locke. Deltic I doubt any alterations of the curve can occur as its mostly on a high embankment and trains are either coming slowly up the bank or slowing for a yellow or red on the approach to Victoria.

So this depot for the OHLE, is it a just a temporary thing or a proper long term maintenance location, least the sidings will finally see some use.

Electric trains coming out of Victoria could easily reach 50mph by Miles Platting then have to brake to 20mph. Any easing of this curve would save on energy, brake pads and passenger comfort.

In the other direction trains from Rochdale approach Miles Platting Junction at around 50mph and can brake to a stop at Victoria so an eased curve below this speed should cause no problems.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The curve from the Victoria direction to the Stalybridge direction passes on bridges over two main roads, Oldham Road A62 and Queens Road A6010, close to their junction. I imagine that any significant easing would require new bridges over both roads, on the inside of the curve relative to the present bridges, and possibly property demolition too.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
I don't know the area that well but would this work prevent easing of Miles Platting curve to anything above 20mph?

Miles Platting curve is 30mph each way, the Up & Down Ashton lines were realigned in 1998 when the whole Vic East Jn - Miles Platting - Thorpes Bridge Jn area was remodelled. There is no need to brake for the PSR, the gradient is 1-in-47 so a decent driver can use gravity to good effect.

As far as the Arrival and Departure line is concerned, it has been clipped and scotched out of use since at least 2004, only really being used for on- and off-tracking of OTP.
 
Last edited:

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,906
Location
North
Miles Platting curve is 30mph each way, the Up & Down Ashton lines were realigned in 1998 when the whole Vic East Jn - Miles Platting - Thorpes Bridge Jn area was remodelled. There is no need to brake for the PSR, the gradient is 1-in-47 so a decent driver can use gravity to good effect.

As far as the Arrival and Departure line is concerned, it has been clipped and scotched out of use since at least 2004, only really being used for on- and off-tracking of OTP.

Just shows long it has been since the loco hauled services used this route and the last time I was this way.

Wasn't £20m spent at Stalybridge to raise speed limit by only 10mph? Looking on Google earth there appears to be nothing on the inside of the curve to prevent easing out to 40 or even 50mph. New bridges over A roads would only cost a £million each. Besides I thought there was £4billion available to speed up the trans Pennine route?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
New bridges over A roads would only cost a £million each.
A few decades ago, perhaps. I'd have thought about £15M each now. Anyone have recent figures? Both would have to be skew bridges over dual carriageways.

Besides I thought there was £4billion available to speed up the trans Pennine route?
Who's to say that that will be on this route? We need to wait to see what they come up with for the so-called HS3.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,959
The Stalybridge work was to completely remodel both junctions to allow parallel moves, provide a new bay platform on the north side to stop movements to/from Ashton on the Stalybridge terminating services conflicting with anything coming from Guide Bridge, fully resignal and re-interlock with control transferred to Manchester East SCC (the late Stalybridge SB was a mechanical box), create a bi-directional platform for more flexibility and use the space occupied by the Up & Down Goods lines to create a new platform face on the south side. Oh and the line speed on the Up and Down lines was raised by 10mph, as was the line speed over Stalybridge Jn to and from the Ashton lines. The resignalling stretched as far as Mossley on the Up line.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,628
Location
Nottingham
Looking at it, conceivably the old 4-track bridge over Oldham Road might be replaced with a 2-track bridge using the same abutments but slightly more skewed. But a new bridge over Queens Road would be needed, together with taking the land occupied by said sidings and moving the crossovers towards Victoria - which probably takes them onto a curve.
 