I thought the TP WCML order is for 12 units to replace 10 350s. (To allow for the Liverpools)Which are, of course, longer (both in terms of number of vehicles and vehicle length) than the current 4-car EMUs used on the WCML. A 3-car 185 vs a 4-car 350 only has a difference in seating of around a dozen even with the extra vehicle. So I would be hopeful that the 5-car units at 22m vehicles will finally deliver a significant boost in capacity (though I must admit I'm concerned at the one for one replacement rather than there being any extra units).
Last edited:
