Speed increases might have to wait till the Baguley Fold/Ashton Moss resignalling.
Yes of course I had forgotten about that - you are almost certainly correct
Speed increases might have to wait till the Baguley Fold/Ashton Moss resignalling.
I guess these Metrolink possessions might be for 25kV electrification work on Miles Platting bank. There are already a few piled bases between the main line and the adjacent Metrolink line.Manchester Metrolink said:There will be changes to some early morning Sunday services on 10 and 17 September.
Network Rail works to upgrade the Manchester to Stalybridge via Victoria rail line will affect the Bury, Rochdale via Oldham and East Didsbury line Metrolink services until approximately 8am.
The following tram services will run before 8am:
The following bus services will also run until normal services resume on all lines:
- Altrincham to Etihad Campus
- Ashton-under-Lyne to Eccles via MediaCityUK
- Central Park to Rochdale Town Centre
- East Didsbury to Piccadilly
- Manchester Airport to Deansgate-Castlefield
- Victoria to Piccadilly
- Bury to Victoria (calling at all stops except Market Street)
- Piccadilly to Central Park (calling at all stops except Market Street)
Various photos captioned 'Phase 5' have just appeared on Flickr courtesy of 141trackworker - looks like Miles Platting?
![]()
Phase 5 electrification work (base making) by 141trackworker, on Flickr
![]()
Phase 5 electrification work (base making) by 141trackworker, on Flickr
Is that here? Does that mean the wires will end at Rochdale Road bridge?
Presumably Victoria's through platforms are reversibly signalled, so what's the advantage of taking a unit out on to one of the running lines to the east to reverse it? (There isn't a reversing siding there, is there?)Just enough to reverse EMUs east of the Victoria platforms, then.
At least it should be finished along with the Victoria-Blackpool work.
I suppose we could call it Transpennine West (West) electrification.![]()
Presumably Victoria's through platforms are reversibly signalled, so what's the advantage of taking a unit out on to one of the running lines to the east to reverse it? (There isn't a reversing siding there, is there?)
Just enough to reverse EMUs east of the Victoria platforms, then.
At least it should be finished along with the Victoria-Blackpool work.
I suppose we could call it Transpennine West (West) electrification.![]()
Victoria to Rochdale Road is just enough to cover the stretch where the railway is close to Metrolink, and so bring out any problems of interference of either system's traction supply on the other's signalling.
Has there not been a long term problem with Metrolink signalling around Pomona being affected by adjacent 25kV traction supply?Is the problem, if there is one, solved yet?
^^ This
It's still North West Electrification... TransPennine Route Upgrade has just gone more West for the West bit.
At the moment ??????
Has there not been a long term problem with Metrolink signalling around Pomona being affected by adjacent 25kV traction supply?Is the problem, if there is one, solved yet?
I agree but I think the rules require every location where the two are close to be tested.I do not see why there should be any reason to expect new EMC issues from 25kV electrification of the main line east of Victoria, which is no closer to the adjacent Metrolink line than at Cornbrook.

The September update to the Enhancements Delivery Plan is up - and Stalybridge electrification appears to have been revived (see page 11)!
https://16cbgt3sbwr8204sf92da3xxc5m...ploads/2017/10/Enhancements-Delivery-Plan.pdf
Described as 20 May 2018 both as GRIP 6 completion (indicative) in one column, and Entry Into Service (Regulated Output) in another. Clearly that won't be met. There's a footnote saying JTI improvement included. Taken literally, I think that means Journey Time Improvement improvement included. They're going to improve the Journey Time Improvement.![]()
The September update to the Enhancements Delivery Plan is up - and Stalybridge electrification appears to have been revived (see page 11)!
Described as 20 May 2018 both as GRIP 6 completion (indicative) in one column, and Entry Into Service (Regulated Output) in another. Clearly that won't be met. There's a footnote saying JTI improvement included. Taken literally, I think that means Journey Time Improvement improvement included. They're going to improve the Journey Time Improvements.![]()
The feeder station in Stalybridge is encouraging, they would only pay for it if they are very confident of eventually electrifying from Victoria and / or Piccadilly. Its the middle bit of the route I am concerned about!
Just to add, this note is also attached to it:Manchester-Preston has gone tbc (was Dec 2017).
Hm I'm not sure this follows. This feeder is required to ensure there is sufficient power supply further west after the electrification of the Manchester - Preston section.