• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Manchester Metrolink master thread

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,398
Location
Essex

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Gauging in East Manchester.

102_1328.jpg


102_1334.jpg


102_1353.jpg


102_1361.jpg
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
History in the making with Johnny's photos there Watcher. Trams 3031 & 3032 as well.
 

telstarbox

Established Member
Joined
23 Jul 2010
Messages
6,364
Location
Wennington Crossovers
The Oldham line is go! Well done to everyone involved.

First tram made it and departed Oldham Mumps on time! Pretty well-loaded both ways with mix of Metrolink project staff, journos and enthusiasts (the second outbound service had no passengers at all :o ) and I was a bit surprised to see about 12 Metrolink guards on board, although no ticket checks! Two of them got off at each stop presumably to help first-time passengers.

I was interviewed by a woman from the Oldham Chronicle on the service from Oldham along with everyone else on the tram.

The new stops are looking good especially Central Park (where I'm waiting now.) Each stop on the line has a customised poster - "Nice one Newton Heath", "A perk for Central Park", etc which is a nice touch.

For those interested the first unit out and back was 3004.
 
Last edited:

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,398
Location
Essex
I was there too :) it was a lovely smooth ride, apart from the section round Oldham to mumps ie the temporary section, that bit was quite clickety clack, understandably!
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Was there a press only tram running to Oldham today? Granada Reports featured a very lightly loaded tram (around 5 people on board.)

The young journalist made a bit of a mistake in her report "Manchester will have the largest Metrolink in the country."
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I was there too :) it was a lovely smooth ride, apart from the section round Oldham to mumps ie the temporary section, that bit was quite clickety clack, understandably!

Yeah the fishplate rail sounded very heavy rail clackety clack but was mostly noise, you couldnt feel it all.

Jcollins, ive heard they did a press tour the day before opening.
 

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,398
Location
Essex
Was there a press only tram running to Oldham today? Granada Reports featured a very lightly loaded tram (around 5 people on board.)

The young journalist made a bit of a mistake in her report "Manchester will have the largest Metrolink in the country."

To be fair to her, we will have the largest Metrolink in the country ;)
 

spargazer

Member
Joined
15 May 2012
Messages
154
I actually did make a mistake when naming Rawtenstall when it should be Ramsbottom, I have obviously been called a liar.
 

radamfi

Established Member
Joined
29 Oct 2009
Messages
9,267
Is the bridge over the railway line at Central Park always going to have a 10–15 mph speed limit?
 

radamfi

Established Member
Joined
29 Oct 2009
Messages
9,267
I thought the slow speed might be to do with the fact that you can't see very far in front because of the concrete divider between the two lines. So the driver would be able to stop if another tram was stalled in the middle of the bridge. Could the bridge have been built without that divider? Or built less curvy?

Oldham to Dean Lane feels like a completely new line even though I've been on it dozens of times on heavy rail. And I don't seem to remember the route from Central Park to Victoria at all even though I went on it many times! When was that line closed? When I was a kid, it was the usual route for Victoria to Yorkshire trains as they missed out Miles Platting. Then they stopped going that way for many years until just before closure for some reason. Was it to do with the closure of Miles Platting or resignalling or revamping of Victoria? I do remember that it was closed just after that temporary reuse.
 
Last edited:

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,398
Location
Essex
I thought the slow speed might be to do with the fact that you can't see very far in front because of the concrete divider between the two lines. So the driver would be able to stop if another tram was stalled in the middle of the bridge. Could the bridge have been built without that divider? Or built less curvy?

The divider is the load-bearing structure for this bridge.
You're probably right about the line of sight though!

And I don't seem to remember the route from Central Park to Victoria at all even though I went on it many times! When was that line closed? When I was a kid, it was the usual route for Victoria to Yorkshire trains as they missed out Miles Platting. Then they stopped going that way for many years until just before closure for some reason. Was it to do with the closure of Miles Platting or resignalling or revamping of Victoria? I do remember that it was closed just after that temporary reuse.

Wasn't it towards the end of last century? Late '90s? Do you mean the section that goes over the Smedley Viaduct?
 
Last edited:

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,398
Location
Essex
I'm in that video :-/ luckily I don't look quite as tired as I felt at that time in the morning!!
 

The Snap

Established Member
Joined
10 Jun 2005
Messages
3,156
I thought the slow speed might be to do with the fact that you can't see very far in front because of the concrete divider between the two lines. So the driver would be able to stop if another tram was stalled in the middle of the bridge. Could the bridge have been built without that divider? Or built less curvy?

The bridge is designed to 'sweep' over the Network Rail infrastructure so the alignment through Central Park Stop can run through the southern-most portal of ORL14 Thorp Road bridge. It couldn't realistically have been designed 'less curvy' because to get up, over Network Rail's infrastructure then back down again to get under ORL14 in a straight line, the Finback structure would have been particularly complex (more so than it is now!).

Oldham to Dean Lane feels like a completely new line even though I've been on it dozens of times on heavy rail.

The track was stripped out along the entire line right back to the sub formation, and new track put back in. It feels completely new...because it is! ;)

The only exception is the do-minimum section between Werneth TSS and Oldham Mumps Temp - the track there was never removed, but 'refurbished' through lifting, realigning and tamping.
 
Last edited:

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
Wasn't it towards the end of last century? Late '90s? Do you mean the section that goes over the Smedley Viaduct?

The Smed viaduct which emerges from the tunnel splits into two, a curve left onto the Victoria bound line, and the 'straight ahead' into the depot.

The straight ahead was infact the main line to Victoria..... the line ran through where todays depot is, past the south end, and on to the 800m long Red Bank viaduct, arriving into Victoria Station on the arena (Platform 6) side.

Could be a crucial second route after TfGM realise the jampacked pinchpoint north of Victoria Station when Bury and Oldham both get 6 minute services.
 