The mythical A556(M) springs to mind! Also the likely-never-to-be-seen-again original M60 (Altrincham-Old Trafford).
Somebody has been reading Pathetic Motorways!
The mythical A556(M) springs to mind! Also the likely-never-to-be-seen-again original M60 (Altrincham-Old Trafford).
The mythical A556(M) springs to mind!
The A556(M) wasn't mythical (actual Statutory Instruments were made for it), and was merely the southern section of the old M60 plans (Knutsford - Central Manchester) continuing onwards - that's one scheme there...The mythical A556(M) springs to mind! Also the likely-never-to-be-seen-again original M60 (Altrincham-Old Trafford).
Not quite fully enough, but we'll let it slide.Somebody has been reading Pathetic Motorways!
At least you're getting the A555 SEM(I forget how many times)S road. :P
I went on the tram on the East Didsbury line yesterday, again was rather impressed with all the new lines, apart from the shocking site of a number of locations on the new line that have been the victim of a graffiti attack![]()
A new link road between M6 J19 and the M56 is still set to be built but it won't be the A556(M) any more. The full plans for the new road are currently on display at Knutsford Library.
I often wonder why John Prescott in his ministerial capacity decided to cancel the A555 section towards Manchester Airport those many years ago, when it had reached the large roundabout at Handforth with just the short final leg from there to Manchester Airport to be constructed ?
I was under the impression that the existing strip of A555 (which is actually a really interesting bit of road!) was built at the same time as the A34 bypass project in readiness for the rest of the road to go ahead and to avoid the need to modify the brand new road if it did?
To be honest, that money would have been better spent grade separating a few of the roundabouts on the A34! The A555 created another bloomin roundabout itself, with almost no traffic going over the top.
They should have made the A34 the through route instead of the A555 where the two meet.
The newly constructed A34 was intended to replace the old A34 (now the B5358) through Handforth and was part of a project to eventually by-pass both Wilmslow and Alderley Edge, which was finally completed in two sections as far as Nether Alderley. It was not intended to be an incremental part of the A555 airport link road, but to offer connectional links to it only.
I simply meant that the A34/A555 junction was designed to give a direct unimpeded run to traffic on the A555, of which there is very little, whereas the heavy flow on the A34 has to negotiate the roundabout. On the basis of today's traffic flows, it would have been better if it could have been designed so that the A34 traffic had a straight run through, and A555 traffic had to negotiate the roundabout. Of course, if and when the A555 is completed, it will gain traffic, but it would have to gain a lot to be busier than the A34.
Of course, if and when the A555 is completed, it will gain traffic, but it would have to gain a lot to be busier than the A34.
At Cheadle Royal, the A34 does have an underpass underneath the large circulatory roundabout system that leads to both of the very large John Lewis/Sainsbury retail establishments, the large Cheadle Royal Business Park and Schools Hill, that leads into Cheadle.
Will this road not provide free-flowing access to the M56 by joining up to the existing spur?

Here some picture that I took yesterday in Oldham Town Centre of work going on for Oldham 3B line. (Sorry to people who already seen them on SCC Metrolink Extension thread)
The Metrolink team at TfGM have sent out, to affected businesses and residents, notification that on dates from 9th to 21st July, there will be both overnight and weekend testing of the overhead line equipment from the current temporary line terminus at Rochdale railway station to the Smith Street area.
Rochdale – testing of overhead line equipment, out of hours works
Work to bring Metrolink to Rochdale town centre is progressing well. Overnight works are required as part of the overall testing programme for the overhead power lines installed along the route. (Published:08/07/2013)
This overnight work is due to take place on several evenings in July, currently anticipated to be the 9th, 10th, 11th, 15th, 16th, 17th, and the also weekend of 20th and 21st of July, however these dates may change as work progresses. The overnight work will be undertaken between the hours of midnight and 7am when there are no passenger services in operation to Rochdale Railway Station stop.
The work will take place along the route of the Rochdale town centre Metrolink extension, from the railway station to Smith Street. We do not anticipate this work causing disturbance to local residents, however you may see workers and equipment on site during these times.
We would also like to remind you that the installed overhead line equipment is to be considered as “live at all times”. Thank you for your patience while we build your new Metrolink line.
http://www.metrolink.co.uk/pages/news.aspx?worksID=47
Big changes ahead for Metrolink passengers
Metrolink is gearing up for a very busy summer that will deliver improvements for passengers.
Over the course of several weekends in coming weeks and months, engineers will be working solidly to upgrade systems and tracks on the existing network that will improve journeys through key parts of the network, including the Cornbrook junction.
The work forms a crucial part of the £1.4 billion expansion of the network and is linked to the roll out of a new tram management system, real-time information at stops and the transformation of the Manchester Victoria stop.
It will require significant changes to Metrolink services over a number of weekends, starting this weekend – July 13/14.
Passengers are therefore being advised to regularly check their services before they travel at weekends, by logging on to www.metrolink.co.uk, emailing customerservices@metrolink.co.uk or calling 0161 205 2000 for the latest updates.
Details will also be provided through TfGM’s twitter feed: @officialTfGM.
On Saturday 13 and Sunday 14 July, Metrolink services will run between Bury and Droylsden and Rochdale and Piccadilly but trams on the Altrincham, Eccles and East Didsbury lines will be replaced with bus services running to Piccadilly.
Councillor Andrew Fender, Chair of the Transport for Greater Manchester Committee, which oversees the Metrolink network, said: “Metrolink is in the midst of a major transformation that will see it treble in size by 2016.
“Allied to that is the need to upgrade the existing ‘block’ signalling system to a new line-of-sight system, particularly through the Cornbrook junction, which is at the heart of the network.
“Regular passengers will know that services through this area are already starting to experience congestion and the work being done over coming weekends is an essential part of addressing that once and for all and, in turn, improving their journeys.”
Peter Cushing, TfGM’s Metrolink Director, said: “We are also already building up to the major transformation of the Victoria Metrolink stop, which will be completed in earnest over several months next year.
“So it’s an incredibly exciting time, but the scale and breadth of the work being done will unavoidably require some temporary changes to weekend services.
“There’s no such thing as a quiet weekend in Greater Manchester – there will always be something happening somewhere – so the schedule of work aims, wherever possible, to strike the balance between getting things done as soon as possible but with the least impact.”
http://www.tfgm.com/Corporate/media_centre/Pages/News.aspx?articleId=271
Just a reminder that there are no metrolink services between Altrincham, Eccles/MediaCity and East Didsbury to the City Centre due to TMS commissioning at Cornbrook.
They need a breakdoubles on Droylesden to Bury so if you wanna go double banana spotting this is the time you'll be guaranteed
The Metrolink team at TfGM have sent out, to affected businesses and residents, notification that on dates from 9th to 21st July, there will be both overnight and weekend testing of the overhead line equipment from the current temporary line terminus at Rochdale railway station to the Smith Street area.

It adds flexibility and also not all services need to be the length of two M5000s