Dyan Crowther said:This work marks the start of work to electrify the key Transpennine route from Manchester through Huddersfield to Leeds.
Sorry, quoted the wrong bit. Fixed now.
Importantly, the TP project proper east of Stalybridge is out to tender by LNE Route (at least I have not heard that a contract has been awarded), whereas the NW scheme has Balfour Beatty as prime contractor to LNW Route.
A different contractor might mean different construction methods and plant.
Network Rail has some big decisions to make over the number of teams working simultaneously on different electrification projects.
Route clearance works in advance of electrification are a bit different, using a different set of less-specialised contractors.
Since Monday 5th, wiring appears to have been completed around Ordsall Lane, at least on the Down.
No change on the other two gaps further west.

It's definitely not between Manchester and Liverpool, though, so from a thread point of view it would perhaps be better in a TP electrification thread (do we have one?) than this thread.
I started one. I will post the link. Thanks to Ainsworth74 for cleaning up the thread
http://www.railforums.co.uk/showthread.php?t=88054
About a dozen OHLE masts, complete with cantilever arms, have gone up on the Down line just south of Prescot on the Huyton-Wigan branch.
Foundation work continues with bases now on both sides of the Pilkington embankment.
On the Chat Moss route the short wiring gap at Parkside has now been fully wired, so old and new wires are properly linked at the western end.
However the longer gap at Ordsall Lane, which I noted was wired on the Down line on Saturday, is still incomplete on the Up.
No change on the big gap at Glazebury, which extends for over a mile.
About a dozen OHLE masts, complete with cantilever arms, have gone up on the Down line just south of Prescot on the Huyton-Wigan branch.
Excellent spot - did not see them this morning with the poor weather and steamed up windows. Noticed the first (that I've seen!) of several platform-located mast bases appeared at Prescot, Eccleston Park and Thatto Heath over the last week too.
Excellent spot - did not see them this morning with the poor weather and steamed up windows. Noticed the first (that I've seen!) of several platform-located mast bases appeared at Prescot, Eccleston Park and Thatto Heath over the last week too.
Any more news of mast bases between Bryn to Springs Branch Junction?
Any more news of mast bases between Bryn to Springs Branch Junction?
On an associated railway infrastructural matter, what is the current postion with the bridge work in the Bryn area ?
Sorry, no info from me on Bryn onwards; it'll probably be a month or so before I travel that way.

Thanks for the info near Bryn, Bevan.
Mast numbers are gradually increasing - there has been a spurt between Eccleston Park and Thatto Heath. Most of those stored at Prescot signal box site have now gone. I suspect if you want any photos of Ravenhead/St Helens without masts, now would be the time to do it![]()